Interoceanic Highway


The Interoceanic Highway or Trans-oceanic highway is an international, transcontinental highway in Peru and Brazil to connect the two countries. The east-west passageway spans 2600 kilometers. From Peru's Pacific ocean coastline, it continues across the Andes mountains and through a large part of the Amazon rainforest in the Peruvian department of Madre de Dios. It then travels into Brazil where it connects with a network of existing highways to the Atlantic. It entailed the renovation and construction of roughly 2,600 kilometers of roads and 22 bridges. Completed in 2011, it creates a connected highway from the Peruvian ports of San Juan de Marcona to Brazilian ports and cities throughout the City of Rio Branco ZPE. The project came into being via a 2004 agreement between Alejandro Toledo and Luiz Inácio Lula da Silva, then presidents of the two countries.
In Peru the project is known by the MTC as the Corredor Vial Interoceánico Sur Perú-Brasil and by ProInversion as the Initiative for the Integration of the Regional Infrastructure of South America, , SUR axis. The project is part of a national road investment plan which involves the construction of three longitudinal highways, and 20 transversal highways. Parts of these transversal highways make up part of IIRSA SUR.

Construction

As the project now links three Peruvian ports to Brazil, the route has several branches. Furthermore, the construction of the various branches has been divided up into a number of stretches or sections, each of which has been constructed as part of a separate concession. Five concessions were constructed in two blocks:
In June 2005, the second, third, and fourth sections were leased to specialized Peruvian and Brazilian consortia of private companies for 25 years, in which they will be responsible for looking after the highway, the built and forthcoming bridges, and tollbooths. The first and the last section were leased in 2007.
The Brazilian section runs from the border town of Assis Brasil via BR-317 into the main Brazilian road network through Porto Velho and Cuiabá via BR-364.
The total project has an estimated cost of US$1.3 billion, but some analysts predict a higher cost. Of this, about US $810 million is for stretches 2 - 4, $199 million is for stretches 1 and 5, and the remainder for bridges, urban connections, and overhead.
The project employed about 6,000 people during construction. It was inaugurated by Peruvian President Garcia in August 2011 and is now officially complete and operational. However, as of July 2013 some of its bridges across the Madeira River were still not constructed and parts of the rest of the road were not properly built to support truck traffic that would be needed for exporting goods overseas as originally conceived.

Andean watershed crossings

Two branches of the Interoceanic Highway cross the main Andean watershed. The Urcos - Inambari branch crosses the watershed approximately , about 7 km north-east of Urcos. The Azangaro - Inambari branch crosses the watershed approximately , about 85 km north of Azangaro.

Environmental concerns

Several non-governmental organizations have expressed concern that the project was approved with atypically little effort on Environmental Impact Studies. Concerns are both environmental, and social.

Other Trans-Andean transport projects

There is an intention to build another route between Paita and Yurimaguas, both in Peru, to give river access to the Amazon and Brazil.