Interstate 85 in North Carolina


In the U.S. state of North Carolina, Interstate 85 scales the state for from the South Carolina border to the Virginia border. As the second-longest interstate in the state, it links the three largest metropolitan areas in North Carolina: Metrolina, the Piedmont Triad, and the Research Triangle. Nine of the twenty largest municipalities in the state lie along I-85, and it connects those cities to Richmond, Virginia to the north, and Upstate South Carolina and Atlanta, Georgia to the south.

Route description

I-85 enters the state from Cherokee County, South Carolina near Grover in Cleveland County, an outer suburb of the Charlotte metropolitan area. After only a few miles, the highway enters Gaston County. Near Kings Mountain, I-85 turns from a northeast trajectory to an eastward one and goes through Gastonia, where it widens from four to six lanes. It stays at six lanes until it reaches Belmont, where the highway widens again to eight lanes.
The highway crosses the Catawba River as it enters Mecklenburg County, then interchanges with I-485 as it passes north of Charlotte-Douglas International Airport. After crossing I-485, it turns northeastward again, bypassing Uptown Charlotte to the west and north. While the route does not enter Uptown, several exits do provide access to the area. An interchange with Interstate 77 north of Uptown provides direct freeway access. The route through Charlotte traverses the northern portion of the city and is more suburban than urban in character, with light industry such as truck terminals, warehouses, small manufacturing facilities, and small office parks lining the highway. It also passes by the University City area and the University of North Carolina at Charlotte.
North of Charlotte, I-85 interchanges with I-485 a second time as it continues northeastward into Cabarrus County. In Concord, it passes through a dense commercial district and provides access to both Concord Mills shopping mall and Charlotte Motor Speedway, afterwards passing south and east of Kannapolis. As of February 2019, the highway between exit 58 and exit 68 near the Rowan County town of China Grove is being rebuilt and expanded from 4 lanes total with no shoulders. When complete, the route will have 8 total lanes through to its junction with Business 85 south of Lexington.
Between Exits 96 and 102, the northbound and southbound lanes switch places. The southbound lane crosses over the northbound lane just before the northbound lane passes over a small bridge over Hamby Creek. East of the northbound overpass and southbound underpass with Squire Bowers Road, a pair of rest areas which contain the North Carolina Vietnam Veterans Memorial Park are entered from the right, but are still in the median. Only after the underpasses beneath Johnsontown Road does the northbound lane run over the southbound one returning to its proper location.
Approximately northeast of the Charlotte area is the Triad area, anchored by the cities of Winston-Salem, Greensboro and High Point. I-85 bypasses High Point and also largely bypasses Greensboro. Up until February 2004, I-85 went through the heart of Greensboro and joined Interstate 40 near downtown. Today, I-85 is routed along the Greensboro Urban Loop and meets I-40 east of downtown. Its former route is now known as Business 85.
Interstates 85 and 40 remain joined as they continue eastward to the Triangle region, anchored by the cities of Chapel Hill, Durham and Raleigh. West of Durham near Hillsborough, the two highways split, with I-40 heading southeast through Chapel Hill, Durham and Raleigh while I-85 continues eastward through Durham, then northeastward as it exits the city. In between Greensboro and Durham, 85/40 is 8 lanes wide even through the more suburban stretches. Once 85 hits Durham it temporarily widens to 10 lanes. It takes on a more suburban character once it leaves Durham and then heads into rural areas, bypassing Oxford and Henderson before crossing into Mecklenburg County, Virginia.

Dedicated and memorial names

I-85 in North Carolina feature a few dedicated or memorialized stretches of freeway.
Parts of Interstate 85 were already constructed before federal aid was available in the 1950s, as the state had been constructing sections of the Interstate Highway System since 1949. The Lexington Bypass north of Lexington - which at the time was signed U.S. 29 and U.S. 70 - is now a part of Business I-85. This was part of an 80-mile expressway completed in 1955 between Lexington and Hillsborough.
One planned road was the Salisbury bypass, long with a $1 million twin-span bridge over the Yadkin River. Construction on the bridge started in 1955, but the lanes were not as wide as federal standards required, and the road had a sharp curve north of the bridge. Both of these characteristics saved money.
The Federal-Aid Highway Act of 1956 provided for 90 percent federal funding of highways that would become part of the Interstate Highway System, and the N.C. Highway Commission used the funds to build the rest of the highway, which opened as I-85 in 1958. The bridge, finished a year earlier, was "grandfathered" despite not meeting standards.
Another section of I-85 opened to traffic on September 9, 1958 when an stretch in Mecklenburg County was opened.
The year 1960 saw several sections of the highway open to traffic:
By 1965, I-85 from the South Carolina border to Charlotte was complete, while it took until 1970 for the section between Charlotte and Durham to be completed. However, the "Temporary 85" designation would remain on the segment between Lexington and Greensboro until 1984 because there were too many access roads. That year, a new six-lane section opened, resulting in the "Temporary 85" designation to be dropped.
Since its completion, many widening projects have been undertaken on I-85, particularly along the stretch of highway between Gastonia and Durham. By 1988, widening I-85 to six lanes from Greensboro to Burlington was being considered. The plan was later changed to eight lanes. The $175 million project began in 1989. With the opening of a section in Alamance County on November 23, 1994, of I-85/I-40 were eight lanes. An additional were to be ready by 1996, giving the interstate eight lanes all the way to where I-40 turned southward at Hillsborough.
In addition, Interstate 85 was relocated in 2004, south of Greensboro, forming part of the Greensboro Urban Loop, allowing through traffic to bypass that city's downtown area. Between 2004 and 2008, I-85 was widened to eight lanes around Salisbury.
The I-85 Corridor Improvement Project, located in Rowan County and Davidson County, was a two-phase project to replace the narrow bridge over the Yadkin River and widen the freeway from four to eight lanes. In the first phase, all traffic from the old bridge moved to a new $201 million bridge in August 2012. On March 9, 2013, all eight lanes of the I-85 bridge opened to the public. The project finished eight months ahead of schedule and $44 million under budget.
From May 2010 through April 2014, I-85 was widened from four to eight lanes between exit 49 and Exit 55.

Current projects

Following the completion of the widening of I-85 between exits 49 and 55, a new project was started to widen I-85 from exit 55 in Concord, Cabarrus County northward to exit 68 in China Grove, Rowan County. Like the prior project, I-85 is being doubled in capacity, expanding from two travel lanes in each direction to four travel lanes in each direction. The project is currently underway, with the first phase begun in Spring 2014, and the second phase begun in Spring 2017. Construction is scheduled to be completed by December 2017. When finished, that will leave I-85 in North Carolina with at least six lanes of highway between Exits 10 and 164.

Auxiliary routes

Exit list