Interstate 895
Interstate 895 is an Interstate Highway in the U.S. state of Maryland. Known as the Harbor Tunnel Thruway, the highway runs between one junction with I-95 in Elkridge and another interchange with I-95 on the east side of Baltimore. I-895 is a toll road that crosses the Patapsco River estuary via the Baltimore Harbor Tunnel, connecting U.S. Route 1, I-695, and the Baltimore-Washington Parkway in the southwestern suburbs of Baltimore with US 40 on the east side of Baltimore. In conjunction with a pair of spurs, unsigned [|I-895A and I-895B], I-895 provides access to the tunnel from I-97 and Maryland Route 2 in Glen Burnie. The highway is designed for through traffic by having partial interchanges that require vehicles from almost all starting points to pass through the tunnel and the tunnel toll plaza, where a $4 toll is charged to passenger vehicles, before exiting the facility.
The idea of a crossing of the Patapsco River south of downtown Baltimore had been studied since the 1930s. In the early 1950s, the Maryland State Roads Commission chose to construct a four-lane tunnel between the Canton and Fairfield neighborhoods of Baltimore and approach highways to connect the tunnel with major highways to Washington, Annapolis, Richmond, and Philadelphia. The tunnel and approach highways were constructed beginning in 1955 and opened in November 1957, opening a bottleneck for Baltimore through traffic, which formerly had to navigate the city streets. The Harbor Tunnel Thruway was connected with the John F. Kennedy Memorial Highway in the early 1960s and the portion of I-95 south to Washington in the early 1970s. With these connections, I-895 was burdened with most of the through traffic passing through Baltimore. The congestion was not resolved until I-95 through Baltimore was completed when the eight-lane Fort McHenry Tunnel opened in November 1985. The transfer of most traffic to the new tunnel allowed the Baltimore Harbor Tunnel to be partially shut down for extensive maintenance in the late 1980s.
Route description
I-895 is maintained by the Maryland Transportation Authority and, like all Interstate Highways, is a part of the National Highway System for its entire length.Western approach
I-895 begins at Exit 46 of I-95 in Elkridge with single-lane flyover ramps from northbound I-95 to I-895 and from I-895 to southbound I-95. The highway, which has a speed limit of, expands to four lanes on a viaduct over local roads and CSX's Capital Subdivision and MARC's Camden Line. I-895 crosses the Patapsco River and US 1, then receives the Exit 1 flyover ramps from northbound US 1 and to southbound US 1 before passing under I-195 with no access. I-895 continues east parallel to the Patapsco River. The highway passes along the southern edge of Halethorpe, where it crosses Amtrak's Northeast Corridor and MARC's Penn Line along with Herbert Run.I-895 meets I-695 at Exit 3, which includes a loop ramp from eastbound I-695 and a ramp to westbound I-695. The highway crosses Hammonds Ferry Road in Baltimore Highlands before Exit 4 with MD 295, which includes a loop ramp to southbound MD 295 and a ramp from northbound MD 295. The speed limit drops to, then the highway crosses MD 648 and curves northeast across marshland, the main line of MTA Maryland's Baltimore Light RailLink, and the Patapsco River into Anne Arundel County. East of the river, I-895 receives flyover ramps from the thruway's southern approach, unsigned I-895B, at Exit 6 in Brooklyn Park.
The highway enters the city of Baltimore and curves to the east over Patapsco Avenue before Exit 7 with MD 2, which includes a loop ramp to southbound MD 2 and a ramp from the intersection of MD 2 and MD 173. I-895 parallels CSX's Curtis Bay Branch as the highway passes along the northern edge of the Brooklyn neighborhood. The highway crosses the Curtis Bay Branch on a steel K truss bridge ahead of Exits 8A and 8B. Exit 8A includes a loop ramp to and a flyover ramp from Shell Road, which heads toward the Curtis Bay, Baltimore neighborhood. Exit 8B includes ramps from eastbound Frankfurst Avenue and to westbound Frankfurst Avenue; that street leads to Hanover Street and downtown Baltimore. I-895 passes through the 14-booth toll plaza for the tunnel; immediately to the east of the toll plaza is Exit 9, a half-diamond interchange with Childs Street for traffic to and from the toll plaza. The speed limit decreases to as the highway curves to the northeast through the Fairfield unit of the Port of Baltimore and descends into the Baltimore Harbor Tunnel.
Northern approach
I-895 surfaces from the tunnel adjacent to the toll plaza for the Fort McHenry Tunnel within the Canton neighborhood. The highway passes over several rail lines of the Canton Railroad and several streets as it curves to the north. The Exit 10 ramp to Holabird Avenue diverges from I-895 immediately before the highway passes under I-95 with no access. I-895 returns to ground level and the highway crosses Ponca and Boston streets; the speed limit increases to ahead of exits 11A and 11B, which serve Boston and O'Donnell streets, respectively. The highway crosses a rail line before passing through the Greektown neighborhood in a cut. I-895 passes under MD 150 ahead of Exit 12, a four-ramp partial cloverleaf interchange with Lombard Street just to the west of Johns Hopkins Bayview Medical Center that has ramps in both directions of the Interstate, and is the only interchange to be built out that way.The highway veers northeast and crosses both Amtrak's Northeast Corridor and CSX's Philadelphia Subdivision before Exit 13 with US 40 and MD 151 ; the entrance ramp extends from the US 40-MD 151 partial cloverleaf interchange immediately to the north and west. After crossing Herring Run, I-895 meets Moravia Road at Exit 14, a five-ramp partial cloverleaf interchange that lacks an exit from northbound I-895, which is accessed via Exit 13 and a loop ramp to the northwest. This interchange complements Exit 60 off I-95, where the eastern terminus of Moravia Road meets the planned western terminus of the Windlass Freeway. A branch of the I-95 Express Toll Lanes begin within the interchange with Moravia Road, there is a ramp from northbound I-895 to the northbound toll lanes. The highway crosses Moores Run before reaching its northern terminus at Exit 62 of I-95, a pair of flyover ramps from I-895 to northbound I-95 and from southbound I-95 to I-895 on the boundary between the city of Baltimore and the Baltimore County community of Rosedale.
History
Planning and construction
In 1938, the Maryland State Roads Commission commissioned an engineering study, Maryland's Primary Bridge Program, to examine feasibility of major bridges across significant transportation barriers, including a bridge crossing the Patapsco River southeast of the Inner Harbor. Another study in 1944 examined the idea of a bridge with limited-access approach roads running from US 1 in Elkridge to the Patapsco River crossing and from the bridge to US 40 near Erdman Avenue in east Baltimore. The financial resources for the project were established in 1947 when the Maryland General Assembly passed an act allowing for the pooling of revenue bonds and toll receipts between the state's toll facilities—the existing Potomac River Bridge and Susquehanna River Bridge, and the upcoming Chesapeake Bay Bridge—to finance the construction of the Patapsco River Crossing. Finally, a 1953 study examined three different routes—Canton-Fairfield, Canton-Fort McHenry, and a Canton-Fort McHenry-Fairfield dual crossing option—and whether the crossing should be a bridge or tunnel.In 1954, the SRC decided to construct a tunnel between Canton and Fairfield, with three approach highways: a west approach from US 1 in Elkridge, a south approach from MD 2 in Glen Burnie to connect with the west approach in Brooklyn Park, and a north approach from US 40 and Erdman Avenue in east Baltimore. The approach highways were to be limited-access with directional, partial interchanges so that only traffic intending to use the tunnel would use the approach roads. Any vehicles entering an approach road would not be able to exit until having passed through the tunnel and the tunnel toll facility.
Shortly after work began on the Patapsco Tunnel Project on April 7, 1955, several changes were made to the plans for the approach highways. The northern terminus at US 40 was altered to allow an extension from US 40 to the southern end of the future Northeastern Expressway. As a result, additional connections with US 40 were planned for the area around present day Exit 14. In addition, the south approach was to have a tie-in to the Glen Burnie Bypass then under construction. The tunnel and approach highways were completed and opened November 29, 1957 as the Baltimore Harbor Tunnel and the Harbor Tunnel Thruway, respectively. The opening of the tunnel and approach roads removed a significant amount of traffic from the streets of Baltimore and eliminated 51 traffic lights from the route of motorists passing through the city.
Improvements and relief
The Harbor Tunnel Thruway was extended north to the city limits of Baltimore to seamlessly connect with the Northeastern Expressway when that highway opened northeast to the Baltimore Beltway in 1961. In 1969, Moravia Road was extended east to US 40 using the connector between US 40 and the thruway and several ramps were added to that road's interchanges with US 40 and the thruway. In addition, flyover ramps were constructed at the city limits for I-95 to diverge from the John F. Kennedy Memorial Highway onto its own path through east Baltimore in 1970. The Harbor Tunnel Thruway was extended at its south end in 1973 to connect with I-95 shortly after that Interstate was completed between the Capital Beltway and the Baltimore Beltway in 1971.Since I-95 had not yet been completed through Baltimore, the Harbor Tunnel Thruway, which was designated I-895 in 1979, was the main route for traffic passing through Baltimore. As a result, the highway was very congested, and travel through Baltimore had once again become a bottleneck. Relief came with the completion of the eight-lane Fort McHenry Tunnel on I-95 on November 23, 1985. With most traffic diverted to the new tunnel, major reconstruction work began on the Baltimore Harbor Tunnel. Traffic was reduced to one lane in each direction through the tunnel as each of the two tubes was renovated between 1987 and 1989. More recent changes include the elimination of the entrance ramp from Ponca Street at Exit 10, the expansion of Exit 12 to a full interchange to provide access to Johns Hopkins Bayview Medical Center in both directions, and the reconstruction of the northern interchange with I-95 in 2009 so I-895 enters and exits I-95 on the right side of the roadway; previously, I-95 exited itself southbound by forcing traffic to weave to the right and access a flyover ramp, and northbound I-895 merged with I-95 from the left.
Tolls and exit numbers
The original toll for the Harbor Tunnel Thruway was 40 cents for passenger vehicles and 85 cents for trucks. By 1985, the toll had risen to $1. Electronic toll collection began at the toll plaza in 1999 for M-TAG customers; the M-TAG system was absorbed by E-ZPass in 2001. MdTA increased the toll for passenger vehicles to $2 in 2003. In May 2011, the agency announced the toll for the Harbor Tunnel Thruway and the two other harbor crossings would increase to $3 on October 1, 2011 and to $4 on July 1, 2013.The Harbor Tunnel Thruway has had three different exit number systems throughout its existence. The first numbering scheme was in place by 1963. The northbound exits were numbered between 1 and 5, while the southbound exits were numbered 1 to 7. The second numbering scheme, which did not change the interchange numbers on the northern approach to the tunnel, was introduced in 1971. The exits on the western approach were renumbered 11 to 17. Under both schemes, the Childs Street exit did not have a number and the Moravia Road interchange was numbered as Exit 1 of the John F. Kennedy Memorial Highway. The third and present numbering scheme was enacted in 1991.