Island Bend Dam


Island Bend Dam is a major ungated concrete gravity dam with a controlled spillway across the Snowy River in the Snowy Mountains region of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.
The impounded reservoir is called the Island Bend Pondage.

Location and features

Completed in 1965, Island Bend Dam is a major dam, located within the Snowy Monaro Regional Council, adjacent to the locality of Island Bend. The dam was constructed by Utah Construction and Engineering Pty Limited based on engineering plans developed under contract from the Snowy Mountains Hydroelectric Authority.
The dam wall comprising of concrete is high and long. At 100% capacity the dam wall holds back of water. The surface area of Island Bend Pondage is and the catchment area is. The controlled spillway is capable of discharging.

Climate