The Isle of Man to England Interconnector is a submarine power cable connecting the transmission system of the Manx Electricity Authority to that of Great Britain. With an undersea section of approximately, it is the longest AC undersea cable in the world. It was laid in 1999 between Bispham, Blackpool, England, and Douglas Head on the Isle of Man, commencing commercial operations in November 2000. It is capable of continuous operation of 40 MW at 90 kV.
The cable was manufactured in two parts: one section at the former BICC works in Erith and the other at Pirelli Cables in Southampton. It ended the Isle of Man's dependence on local diesel-powered generation. Power supplies to the island were increased in 2003 by an 85 MW combined cycle gas turbine power station at Pulrose, in the capital, Douglas.