James G.P. Dehlsen is an American businessman, inventor, and entrepreneur. He is a pioneering figure in wind power and renewable energy development in the United States and holds 25 patents.
Early life and career
Dehlsen was born in Guadalajara, Mexico. His father was a Danish businessman and engineer who worked for Southern Pacific Railroad. As a young man, he served in the U.S. Air Force. Dehlsen subsequently earned a BS and MBA from the University of Southern California. Dehlsen developed a fluid lubricant called Tri-Flon which utilized micron-sized Teflon particles. He sold the company in 1980.
In 1980, Dehlsen founded the wind power company Zond Systems Inc., which became the first company to commercially provide wind power to Southern California Edison. Dehlsen collaborated with the Danish company Vestas, from which Zond purchased wind turbines. During the 1980s, Zond purchased nearly all the turbines Vestas produced. As a result, "California became the birthplace of the modern wind industry." In the 1990s, Zond began manufacturing its own wind turbines in order further lower the cost of energy. With support from the National Renewable Energy Laboratory and the U.S. Department of Energy, Zond produced a 550kW turbine. Zond's work on variable-speed technology subsequently enabled turbine scaling to 1.5MW. In 1997, Enron acquired Zond and formed Enron Wind. GE subsequently acquired Enron Wind in 2002 to form GE Wind Energy.
In 2001, Dehlsen and his son James Brenton established Clipper Windpower. In partnership with the U.S. Department of Energy and NREL, the company developed the 2.5-MW Liberty Wind Turbine, featuring advanced drive train and controls architecture. Commercial sales for the Liberty Wind Turbine began in 2006, then the largest wind turbine manufactured in the United States. Clipper's IPO on the Alternative Investment Market of the London Stock Exchange launched in September 2005. In 2007, the U.S. Department of Energy bestowed on Clipper its "Outstanding Research and Development Partnership Award" for its "outstanding contribution toward industry advancements," including attaining "unparalleled levels of efficiency and reliability and reduced cost of energy" with the Liberty Wind Turbine. Clipper also worked on developing offshore wind power. In 2007, the company began design and development of the 10MW, 150m rotor "Britannia" offshore wind turbine in the United Kingdom. In December 2009, United Technologies Corporation announced it was acquiring a 49.5% stake in Clipper Windpower. By December 2010, UTC had acquired the rest of the company.