John F. Kennedy Boulevard Bridge
The John F. Kennedy Boulevard Bridge was built in 1959 and reconstructed 2009 by the Pennsylvania Department of Transportation. It carries three lanes of John F. Kennedy Boulevard across the Schuylkill River, Schuylkill River Trail, and CSX Transportation tracks. The overpass continues east, passing over 23rd, 22nd, and 21st streets to terminate at 20th Street. The bridge runs parallel to the SEPTA Regional Rail's Main Line tracks.
, with the Cira Centre on the right, 10 August 2010