Joina City
Joina City is the 3rd tallest building in Zimbabwe standing at 105 metres and NRZ Headquarters. It is owned by . The building has the single largest lift and escalator installation in Zimbabwe. Construction started in 1998 but was halted due economic crisis that was plaguing Zimbabwe. then resumed and completed in 2010
The Building has 3 basement parking floors, 2 Open Shopping Mall namely Lower Ground and Upper Ground and 19 Commercial Floors.