Jokeri light rail


Jokeri light rail is an under-construction light rail line due to begin construction in June 2019, which will serve the Finnish cities of Helsinki and Espoo. The line will replace the current bus line 550, the busiest bus service on the Helsinki Regional Transport Authority public transport network.

Background

The "trunk" bus line 550, formerly branded Jokeri, will be converted to light rail. The city councils of Helsinki and Espoo approved the construction project in June 2016, after the state of Finland decided to participate in funding the construction. The rail line is preliminarily projected to open in 2021. The construction of the light rail line, without rolling stock or a depot, is projected to cost 274 million euros as of June 2016, with rolling stock and a depot projected to additionally cost up to 95 and 65 million euros.
The 550 was originally conceived as a light rail line in 1990, but only realised as a bus line in 2003. The general plans to convert the congested bus line to light rail were first published in 2009, but the decision to begin construction was only taken in June 2016 after many delays. The municipality of Espoo is planning the western terminus of the rail line at Keilaniemi instead of Tapiola. There will be a connection to the Metro at Aalto University and Keilaniemi.
The current 550 is a orbital bus line that runs roughly parallel to the innermost ring road around Helsinki. The 550 runs from Itäkeskus in the East to Tapiola in the West, connecting with the commuter rail network at Oulunkylä, Huopalahti, Pitäjänmäki and Leppävaara, and with the Metro in Itäkeskus and Tapiola.
The 550 light rail line will be a very significant development for the Helsinki tram network. The route is located entirely outside the current network, surrounding it; the length of the route will be a large proportion of the total network, and the line is being planned to modern light rail standards. However, the new line will be technically compatible with the existing network. Direct integration with the Helsinki Metro was briefly studied in 2003, but it was found to be highly impractical.

Construction

Construction on the line officially began on 6 June 2019.