Kabiezes (Metro Bilbao)


Kabiezes is the nothern terminus of line 2 of Metro Bilbao. It is located in the neighbourhood of Kabiezes, in the municipality of Santurtzi. Construction of the station and the track between Santurtzi and Kabiezes began in 2009 and was delayed after a mudslide flooded the tunnel connecting both stations. It opened on 28 June 2014.

Station layout

Kabiezes station follows the typical cavern-shaped layout of most underground Metro Bilbao stations designed by Norman Foster, with the main hall located directly above the rail tracks.

Access

Metro services

The station is served by Line 2 to Basauri with services around seven to ten minutes.

Bus services

The station is also served by the following Bizkaibus regional services: