Kaddam Project


The Kadem Project also called Kadem Adi Narayan Reddy Project is a reservoir on the river Kadem, a tributary river of Godavari near Kademm Mandal, Nirmal District, Telangana. This project covers localised ayacut under Nirmal and Mancherial Districts.
The Project has been integrated with. The reservoir being supplemented through Sri Rama Sagar Project by Saraswathi Canal to stabilize the localized catchment area.
It has two major canals for water distribution, the Left canal length is 76.8 km and Right Canal length is about 8 km.
It also has potential to generate 300 MW hydroelectricity at Pedda Bellala, downstream of Kadam River,