Kenilworth Avenue Line
The Kenilworth Avenue Line, designated Route R12, is a bus route that operates Monday to Saturday that is operated by the Washington Metropolitan Area Transit Authority between Greenbelt station of the Green Line of the Washington Metro and Deanwood station of the Orange Line of the Washington Metro. The line operates every 30 minutes during peak hours and 60 minutes other times. Trips are roughly 45 minutes.
Background
Route R12 operates Monday through Saturday from Greenbelt station and Deanwood station mostly along Kenilworth Avenue. The route provides service along Kenilworth Avenue and smaller communities to various Metrorail stations. Route R12 currently operates out of Landover division.History
Route R12 was created as a brand new express streetcar route around 1963 operating as an express streetcar route all the way between Farragut Square in Downtown D.C. & Goddard Space Flight Center in Greenbelt weekdays only, and between Federal Triangle and Beltway Plaza Mall on Saturdays as part of the "Kenilworth Avenue Express" Streetcar Line, with routes R11 & R15 operating between Farrugut Square & Springhill Lake Apartment Complex peak hours only, and routes R13 & R14 operating between Southwest D.C. & the Macke Industrial Park Complex.In 1973, all routes were converted into Metrobus Routes when WMATA took over all of the streetcar companies that operated throughout the Washington D.C. Metropolitan Area and merged them all into its "Metrobus" System keeping their exact same routing as their streetcar lines.
1977 Changes
Following the opening of Stadium–Armory station, routes R11, R12, & R15 were shorten to terminate their routes at the Stadium Armory on July 18, 1977 with all routes discontinuing service to Farragut Square. Routes R11 and R15 will also operate during early Saturday morning trips before the first Blue Line train operated.Routes R13 & R14 were discontinued on July 18, 1977 being replaced by the R11, R12, and R15
On September 26, 1977, early Saturday morning service on routes R11 & R15's were discontinued, due to new Blue and Orange Line service being introduced during earlier times on Saturday mornings. Weekday peak hour service was not changed.
1978 Changes
On December 3, 1978, shortly after Deanwood station opened, R12 was truncated even further to only operate up to Deanwood station discontinuing service to Stadium–Armory station. Route R11 and R15 were rerouted to operate as a brand new express route between Beltway Plaza Mall /Greenbelt Center and New Carrollton station, running primarily along via Greenbelt Road, Cherrywood Lane, Kenilworth Avenue, the Capital Beltway, and John Hanson Highway.As a result of these changes, R11 & R15 were split their own separate line as the, "Greenbelt-New Carrollton Express Line" while R12 remained a part of its own line, which was renamed the, "Kenilworth Avenue Line".
1981 Changes
On January 4, 1981 when Addison Road station opened, R12 was extended from Deanwood station to Addison Road station via Minnesota Avenue NE, and route P12's former routing on Addison Road, Palmer Highway, Addison Road, Seat Pleasant Drive, Hill Road, and Central Avenue when P12 discontinue service to Deanwood. On the other hand, during the time this particular change took place, R12 was truncated to only operate up to the Beltway Plaza Mall, discontinuing service to Goddard Space Flight Center. Route R12 was renamed the " Kenilworth Avenue–Addison Road" Line as of result.1993 Changes
On December 11, 1993, when both College Park–University of Maryland station & Greenbelt station opened, R12 was rerouted to operate between Deanwood & New Carrollton stations, via the segment of its route between the Deanwood station and intersection of Keniworth Avenue and River Road. Route R12 would run along River Road to serve College Park station, before returning onto River Road to rejoin Kenilworth Avenue. R12 would then operate on the same exact routing it had been operating on between the intersection of Kenilworth Avenue & River Road and Beltway Plaza, and run along Cherrywood Lane to serve Greenbelt station. Then R12 would operate past the Capital Office Park & Greenbelt Federal Courthouse, before turning onto Kenilworth Avenue, and then operating the rest of the way to the New Carrollton station, Route R12 was renamed the, "Kenilworth Avenue-New Carrollton Line".Also routes R11 & R15 were discontinued and was replaced by the R12 which operates on a combination of both former routes between Greenbelt & the New Carrollton station, essentially replacing both of those Metrobus Routes in their entirety.
The segment of R12's former route between the Deanwood & Addison Road station, was replaced by both routes V14 & V15, which were extended from Addison Road to operate between Deanwood station & Penn Mar Shopping Center, via R12's former routing.
2010 Changes
Bus service in Greenbelt, Maryland were controversial over the last few years due to lack of services. The proposal was mentioned as part of Metro's systemwide bus and rail cuts proposed during a budget crisis in spring of 2010. The Metro Board then took all service cuts off the table before approving the budget for this fiscal year. Alterations to Greenbelts bus service came back up at the request of the City and Prince George's County. At the time of the proposal, the R12 was suffering bus bunching and scheduling problems due to its long route.Proposals were set for route R12 including shortening the to Greenbelt station with the Greenbelt to New Carrollton portion to be replaced by a new route T14 operating between Goddard Corporate Park and Beltway Plaza along the old R12 routing in Old Greenbelt. This however would lead to a reduction of service and a loss of a direct route from route R12 routing to New Carrollton station.
Other proposals were a route G12 would run on route R12's routing in Old Greenbelt running between Greenbelt station and New Carrollton station in May and discontinue service into Franklin Park and the Beltway Plaza loop being replaced by route G14 and G16. In September 2010, it was proposed for route R12 to still terminate at Greenbelt station and split the Greenbelt to New Carrollton station portion to route G12 but route R12 would serve Franklin Park instead of route G14 and G16 and serve the Beltway Plaza loop.
Changes
On December 19, 2010, R12 was shorten to only operate between Deanwood station & Greenbelt station. The rest of its route between Greenbelt and New Carrollton station, was replaced by a new route G12 under the request of the city of Greenbelt to break R12's super lengthy route into two separate routes and in order to improve service reliability, adherence to schedule times, and avoid duplication with the already existing Prince George's County TheBus Routes & other Metrobus Routes.Route R12 was rerouted inside Franklin Park and the Springhill Lake Complex. Buses previously operated along Edmonston Road, Springhill Drive, Springhill Lane, Breezewood Drive, and backtrack to Beltway Plaza Mall via Cherrywood Lane and Greenbelt Road before running again on Cherrywood Lane to Greenbelt station going northbound and from Greenbelt to Beltway Plaza to Springhill Lake Complex going southbound under the same path. The route was change to operate along Greenbelt Road, Beltway Plaza, Cherrywood Lane, Breezewood Drive, Edmonston Road, Springhill Drive, and back along Cherrywood Lane to Greenbelt station Northbound. The route would operate vice versa going from Greenbelt station, Springhill Lake Complex, and Beltway Plaza going southbound. Service along Springhill Lane was replaced by TheBus route 16.
Route R12 was also rerouted to operate along Campus drive to/from College Park–University of Maryland station instead of backtracking along River Road in order to add Metrobus service to the parks and recreational centers along Campus drive. Route R12 would only operate along River Road one way in both directions.
Route R11 was also reincarnated back into service to operate parallel to R12 operating during weekday early mornings, skipping R12's diversion into the Springhill Lake Apartment Complex and Beltway Plaza.