Kenya Power and Lighting Company


Kenya Power and Lighting Company, commonly referred to as Kenya Power or KPLC, is a public liability company which transmits, distributes and retails electricity to customers throughout Kenya.

Location

KPLC headquarters are at Stima Plaza, Kolobot Road in Parklands, Nairobi. The coordinates of the company headquarters are: 01°16'18.0"S, 36°49'14.0"E.

Overview

Kenya Power is a public company listed in the Nairobi Securities Exchange. The company is a national electric utility company, managing electric metering, licensing, billing, emergency electricity service and customer relations.
In addition to electricity distribution to industry, offices, schools, hospitals, and domestic users, KPLC also offers optic fiber connectivity to telecommunication companies through its optical fiber cable network that runs along its high voltage power lines across the country mainly to manage the national power grid.

History

Kenya Power traces its origins to 1875 when Seyyied Barghash, the Sultan of Zanzibar, acquired a generator to light his palace and nearby streets. This generator was acquired in 1908 by Harrali Esmailjee Jeevanjee, a Mombasa-based merchant, leading to the formation of the Mombasa Electric Power and Lighting Company whose mandate was to provide electricity to the island. In the same year, Engineer Clement Hirtzel was granted the exclusive right to supply Nairobi city with electricity. This led to the formation of the Nairobi Power and Lighting Syndicate.
In 1922, the Mombasa Electric Power and Lighting Company and Nairobi Power and Lighting Syndicate merged under a new company known as East African Power and Lighting Company. The EAP&L expanded outside Kenya in 1932 when it acquired a controlling interest in the Tanganyika Electricity Supply Company Limited and later obtaining a generating and distribution licenses for Uganda in 1936, thereby entrenching its presence in the East African region. EAP&L exited Uganda in 1948 when the Uganda Electricity Board was established to take over distribution of electricity in the country.
On February 1, 1954, Kenya Power Company was formed and commissioned to construct the transmission line between Nairobi and Tororo in Uganda This was to transmit power generated at the Owen Falls Dam to Kenya. KPC was managed by EAP&L under a management contract. In the same year, EAP&L listed its shares on the Nairobi Securities Exchange. Making it one of the first companies to list on the bourse.
EAP&L exited Tanzania in 1964 by selling its stake in TANESCO to the Government of Tanzania. Due to its presence in only Kenya, EAP&L was renamed the Kenya Power and Lighting Company Limited in 1983.
Kenya Power Company de-merged from KPLC in 1997 and rebranded to Kenya Electricity Generating Company and in 2008, the electricity transmission infrastructure function was carved out of KPLC and transferred to the newly formed Kenya Electricity Transmission Company. Kenya Power and Lighting Company was re-branded Kenya Power in June 2011.

Shareholding

The 20 largest shareholders in the stock of KPLC, as of 31 August 2015, are illustrated in the table below:
RankName of OwnerPercentage Ownership
1Ministry of Finance
50.09
2Standard Chartered Nominees Limited
20.61
3KCB Nominees Limited
5.72
4CFC Stanbic Nominees Limited
2.97
5NIC Custodial Services Limited
2.35
6Equity Nominees Limited
1.32
8Jubilee Insurance Company Limited
1.04
9UAP Life Association Unitlink Fund
0.53
10Old Mutual Life Assurance Company Limited
0.53
11ICEA Lion Life Assurance Limited
0.49
12Kenindia Assurance Company Limitedd
5.72
13Alimohamed Adam
0.26
14Kenya Reinsurance Corporation Limited
0.26
15Phoenix of East Africa Assurance Company Limited
0.17
16Natbank Trustee & Investment Services Limited
0.13
17Savitaben Velji Raichand Shah
0.12
18Dhimantlal Samji Shah
0.12
19Kyalo Mwangulu Kilele
0.12
20APA Insurance Limited
0.12
21Other Shareholders
11.57
Total
100.00

Note:Totals are slightly off due to rounding.

Subsidiary

In 2015, KPLC elevated its wholly owned school, Kenya Power Training School to the Institute of Energy Studies and Research, to "provide training solutions for the power sector in the areas of generation, transmission, distribution and inter-connectivity". The primary target population are the countries of the Northern Corridor.