In 1999, a contract for the construction of two prototypes landing craft, for evaluation and testing in different conditions was signed. These craft would replace the LCM-8s in Spanish Navy service. After undergoing trials, 12 additional units were ordered to service the two Galicia-class landing platform dock ships and the amphibious assault shipJuan Carlos I. The landing craft have the ability to operate over-the-horizon, as they are equipped with radar navigation, GPS, gyro needle/magnetic compasses and HF communications equipment, VHF and UHF. This allows them to operate up to from their mothership. Propulsion is supplied by two MAN D-2842 LE 402X diesel engines, which supply each to the two waterjets, allowing the craft to reach unladen, and loaded. Maximum range at economical speeds is. The LCM-1E incorporates a stern gate, allowing the loading and unloading of vehicles onto all landing craft within the dry stern dock, without having to open the gate to swap landing craft around. In turn, this saves having to dock down the landing platform, and allows re-stowing of vehicles while the landing platform is underway. There is a maximum limit of 12 tons for the transfer of vehicles in this configuration.
Service
Spanish Navy
The Spanish LCM-1Es are assigned to the Naval Beach Group, based at Naval Station Props. Since joining the Spanish Navy, four of the 12 units built in the shipyards of San Fernando and Puerto Real have been involved in a mission in Lebanon, where they have been used for beach landing marines. After the 2010 Haiti earthquake, four LCM-1E were used to land relief personnel and first aid material directly on the beach, avoiding the partially destroyed and highly congested harbours.
Foreign orders
In 2009, the Australian Defence Force began plans to acquire landing craft for the under-construction Canberra-class landing helicopter dock ships. Arrangements were made to acquire craft from Navantia, and in September 2011, the purchase of 12 LCM-1E craft was approved by the Australian government. The landing craft were delivered in batches of four: the first batch in May 2014, followed by the second in February 2015, with the third due by mid-2015. In Australian service, the craft are referred to as LLCs, and six are assigned to each of the Canberra-class ships: four embarked, two assigned to shore facilities for training and trials, and rotated aboard as embarked craft require maintenance. On 29 December 2013, the Turkish Navy selected Navantia to work with local partner Sedef to build a ship based on Juan Carlos I