Laxiwa Dam


The Laxiwa Dam is an arch dam on the Yellow River in Qinghai Province, northwest China. It is downstream of the Longyangxia Dam and upstream from the Lijiaxia Dam. The main purpose of the dam is hydroelectric power generation and it supports the largest station in the Yellow River basin. The facility generates power by utilizing six turbines, each with a generating capacity of, totaling to a capacity of.

Construction

By the beginning of 2004, the Yellow River was diverted and in September of that year, excavation on the dam's abutment began. In April 2006, the first concrete was cast and on May 18, 2009, the power plant's first two generators were commissioned. A total of of earth and rock were excavated from the dam site.