Line 2 (Suzhou Rail Transit)


Line 2 is the main north-south line of Suzhou Rail Transit. It passes through five districts of Suzhou, and has 22 stations, 17 underground and 5 elevated. It began operations on December 28, 2013.

History

The line was opened in two phases, with the long first phase from to near Baodai Bridge started operations on December 28, 2013. This section consisted of of elevated track and of underground track.
The second phase, running from to in the north, and from to in the east, commenced trial operations on September 24, 2016.

Opening timeline

Stations

Operations

Intervals