Line 5 (Hangzhou Metro)


Line 5 of the Hangzhou Metro is a subway line in Hangzhou. The line is colored cyan on system maps.

Stations

Description

Phase 1 of the line is long with 36 stations and will run between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line. Phase 2 of the line further extends 3.2 km and two stations east to. A, two station extension west to Laoyuhang station in Yuhang District started construction in 2018.

Rolling stock

The line will use higher capacity six car Type AH trains which are 20cm wider than the Type B trains used in current Hangzhou Metro lines, increasing capacity by about 10%.