Line 7 (Hangzhou Metro)


Line 7 of the Hangzhou Metro is a subway line under construction. The line will be 47.48 km long and will run in a west–east direction between Wushan Square Station in Shangcheng District and Jiangdong'er Road Station in Dajiangdong Industrial Cluster in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line is expected to be operational by late 2021.

Stations