Line 7 (Shenzhen Metro)


Shenzhen Metro Line 7 is a line with a length of and a total of 27 stations. It connects Xili Lake to Tai'an, travelling East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016. The line started service on 28 October 2016. Line 7's color is .

History

Stations

Extension

Line 7 may have a north or east extension, and a branch for Metro Culture and Sports Center station. It may open along with Metro Culture and Sports Center in 2018. Train for that branch has already arrived, the train is numbered 742.

Rolling stock

In 2014, Shenzhen Metro Group purchased 70 trains from CNR Changchun Railway Vehicles for the future Line 7 and Line 9, in which Line 7 will use 41 while Line 9 will use 29. The first train arrived in mid-March 2016.