HVDC projects for long-distance transmission have two converter stations and a transmission line interconnecting them. Generally overhead lines are used for interconnection, but an important class of HVDC projects use submarine power cables. A back-to-back station has no transmission line and connects two AC grids at different frequencies or phase counts. Historical HVDC systems used the Thury system of motor-generators but these have all been made obsolete by later developments such as mercury-arc valves, thyristors, and IGBT power transistors.
Legend
Line type:- Thury = Series-connected generators as designed by René Thury
- Merc = Mercury-arc valve rectifier and inverter
- Thyr = Thyristor rectifier and inverter
- IGBT = Insulated Gate Bipolar Transistors
Transmission lines
Africa
Converter station 1 | Converter station 2 | Type | Remarks | ||||||
Cahora Bassa | Mozambique - Songo | South Africa - Apollo | 1420 | 533 | 1920 | 1979 | Thyr | First HVDC with voltage above 500 kV ABB refurb 2013-2014 | |
Inga-Shaba | Congo, The Democratic Republic of the - Kolwezi | Congo, The Democratic Republic of the - Inga | 1700 | 500 | 560 | 1982 | Thyr | Upgraded in 2014 Supplier: ABB, GE | |
Caprivi Link | Namibia - Gerus | Namibia - Zambezi | 950 | 350 | 300 | 2010 | IGBT | Supplier: ABB | |
Ethiopia–Kenya HVDC Interconnector | Ethiopia - Wolayta | Kenya - Suswa | 1045 | 500 | 2000 | 2019 | Thyr | - |
Australia and Oceania
Asia
Converter station 1 | Converter station 2 | Type | Remarks | ||||||
Hokkaido - Honshu | Japan - Hakodate | Japan - Kamikita | 193 | 250 | 300 | 1979 | Thyr | Supplier: ABB, Hitachi, Toshiba | |
Zhou Shan | China - Ningbo | China - Gao Tongge | 54 | 100 | 50 | 1982 | Thyr | ||
Gezhouba - Shanghai | China - Gezhouba | China - Nan Qiao | 1046 | 500 | 1200 | 1989 | Thyr | Power line shares pylons of HVDC Hubei - Shanghai in most part of its track Supplier: ABB, Siemens HVDC C&P System Refurbished by NR Electric | |
Sileru-Barsoor | India - Sileru | India - Barsoor | 196 | 200 | 100 | 1989 | Thyr | Supplier: BHEL | |
Ekibastuz-Tambov | Kazakhstan - Ekibastuz | Russia - Tambov | 2414 | 750 | 6000 | - | Thyr | Construction sites abandoned around 1990 owing to collapse of Soviet Union, line was never completed | |
Rihand-Delhi | India - Rihand | India - Dadri | 814 | 500 | 1500 | 1990 | Thyr | Supplier: ABB, BHEL | |
Haenam-Cheju | South Korea - Haenam | South Korea - Jeju | 101 | 180 | 300 | 1996 | Thyr | Supplier: Alstom | |
Leyte - Luzon | Philippines - Ormoc, Leyte | Philippines - Naga, Camarines Sur | 451 | 350 | 440 | 1998 | Thyr | Supplier: ABB, Marubeni HVDC C&P System Refurbished by NR Electric | |
Chandrapur-Padghe | India - Chandrapur | India - Padghe | 752 | 500 | 1500 | 1999 | Thyr | Supplier: ABB | |
Kii Channel | Japan - Anan | Japan - Kihoku | 100 | 250 | 1400 | 2000 | Thyr | Supplier: Hitachi, Toshiba, Mitsubishi | |
Tian-Guang | China - Tianshengqiao | China - Beijiao | 960 | 500 | 1800 | 2001 | Thyr | Supplier: Siemens HVDC C&P System Refurbished by NR Electric | |
Thailand-Malaysia | Thailand - Khlong Ngae | Malaysia - Gurun | 110 | 300 | 300 | 2001 | Thyr | Supplier: Siemens | |
Shengsi | China - Shengsi | China - Anabasis Sizu | 66.2 | 50 | 60 | 2002 | Thyr | - | |
Talcher-Kolar | India - Talcher, Odisha | India - Kolar, Karnataka | 1450 | 500 | 2500 | 2003 | Thyr | Supplier: Siemens | |
Three Gorges - Changzhou | China - Longquan | China - Zhengping | 890 | 500 | 3000 | 2003 | Thyr | From north bank of Three Gorges to Zhengping, 200 km from Shanghai in the East grid Supplier: ABB, Siemens. Sharing of grounding electrode at Chujiahu with HVDC Hubei-Shanghai | |
Guizhou - Guangdong I | China - Anshun, Guizhou | China - Zhaoqing, Guangdong | 980 | 500 | 3000 | 2004 | Thyr | Supplier: Siemens | |
Three Gorges - Guangdong | China - Jingzhou | China - Huizhou | 940 | 500 | 3000 | 2004 | Thyr | Supplier: ABB | |
Three Gorges - Shanghai | China - Yidu | China - Shanghai | 1060 | 500 | 3000 | 2006 | Thyr | Supplier: ABB | |
Guizhou - Guangdong II | China - Xingren | China - Shenzhen | 1200 | 500 | 3000 | 2007 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Yunnan - Guangdong | |
Ballia - Bhiwadi | India - Ballia | India - Bhiwadi | 800 | 500 | 2500 | 2010 | Thyr | Supplier: Siemens | |
Baoji - Deyang | China - Baoji | China - Denyang | 574 | 500 | 3000 | 2010 | Thyr | ??? | |
Hulunbeir - Liaoning | China - Hulunbeir | China - Shenyang | 920 | 500 | 3000 | 2010 | Thyr | Supplier: ABB | |
Xiangjiaba-Shanghai | China - Fulong | China - Fengxia | 1980 | 800 | 6400 | 2010 | Thyr | Supplier: ABB | |
Yunnan - Guangdong | China - Yunnan province | China - Zengcheng | 1418 | 800 | 5000 | 2010 | Thyr | Supplier: Siemens, Sharing of grounding electrode at Linwu with HVDC Guizhou - Guangdong II | |
Hubei - Shanghai | China - Jingmen | China - Fenjing | 970 | 500 | 3000 | 2011 | Thyr | Power line shares pylons of HVDC Gezhouba - Shanghai in most part of its track, sharing of grounding electrode at Chujiahu with HVDC Shanghai-Changzhou | ??? |
Nanhui Wind Farm Integration | China | China | 8.4 | 30 | 18 | 2011 | IGBT | Supplier: C-EPRI Electric Power Engineering Co.,Ltd | |
Ningdong - Shandong | China - Yinchuan | China - Qingdao | 1335 | 660 | 4000 | 2011 | Thyr | Supplier:Alstom; C-EPRI Electric Power Engineering Co.,Ltd | |
Qinghai - Tibet | China - Geermu | China - Lhasa | 1038 | 400 | 1500 | 2011 | Thyr | Powerline reaches altitudes up to 5300 m above sea level Supplier: CET, SGCC | |
Mundra - Haryana | India - Mundra | India - Mohindergarh | 960 | 500 | 2500 | 2012 | Thyr | Supplier: Siemens | |
Dalian City Infeed | China - Dalian North | China - Dalian South | 43 | 320 | 1000 | 2013 | IGBT | ||
Jinping - Sunan | China - Jinping | China - Suzhou | 2090 | 800 | 7200 | 2013 | Thyr | Supplier: ABB, C-EPRI Electric Power Engineering Co.,Ltd ACC Provided by NR Electric in Jinping Converter Station | |
Nanao Multi-terminal VSC HVDC | China - Sucheng | China - Jinniu ; China - Qingao | 32 | 200/100/50 | 2013 | IEGT/IGBT | SEPRI is technically responsible for the entire project. Multiple suppliers are involved: three different VSC HVDC valve suppliers, two different HVDC land/sea cable suppliers and three different control & protection system/equipment suppliers. | ||
Nuozhadu - Guangdong | China - Nuozhadu | China - Jiangmen | 1413 | 800 | 6400 | 2013 | Thyr | ??? | |
Xiluodo - Guangdong | China - Zhaotong | China - Conghua | 1286 | 500 | 6400 | 2013 | Thyr | ??? | |
Hami - Zhengzhou | China-Hami | China-Zhengzhou | 2192 | 800 | 8000 | 2014 | Thyr | Supplier: C-EPRI Electric Power Engineering Co.,Ltd HVDC C&P System Provided by NR Electric | ??? |
Jindo - Jeju | South Korea - Jindo | South Korea - Jeju | 105 | 250 | 400 | 2014 | Thyr | Supplier: Alstom, LS Cable and System. | |
Xiluodo - West Zhejiang | China - Xiluodu | China - Jinghua | 1680 | 800 | 8000 | 2014 | Thyr | Supplier:C-EPRI Electric Power Engineering Co.,Ltd | ??? |
Zhoushan Multi-terminal DC Interconnection | China - Zhoushan | China - Qushan ; China - Daishan ; China - Yangshan ; China - Sijiao | 134 | 400 | 2014 | IGBT | Supplier:C-EPRI Electric Power Engineering Co.,Ltd HVDC C&P System Provided by NR Electric | ||
Humeng - Shandong | China | China | 800 | 6400 | 2015 | Thyr | ??? | ||
Irkutsk - Beijing | Russia - Irkutsk | China - Beijing | 800 | 6400 | 2015 | Thyr | ??? | ||
Champa-Kurukshetra | India - Champa | India - Kurukshetra | 1365 | 800 | 2016 | Thyr | 2 Bipoles. Supplier: Alstom | ||
Goupitan - Guangdong | China | China | 3000 | 2016 | Thyr | ??? | |||
Jinsha River II - East China | China | China | 800 | 6400 | 2016 | Thyr | ??? | ||
North-East Agra | India - Agra | India - Biswanath | 1728 | 800 | 6000 | 2016 | Thyr | Will supply electricity to serve 90 million people Bipole Ultra high voltage, multiterminal Supplier: ABB | |
Inner Mongolia - Linyi | China - Shizhustan | China - Linyi | 800 | 6400 | 2017 | Thyr | ??? | ||
Jiuquan- Xiangtan | China - Qiaowan | China - Xiangtan | 800 | 6400 | 2017 | Thyr | Supplier:C-EPRI Electric Power Engineering Co.,Ltd HVDC C&P System Provided by NR Electric | ??? | |
North Shanxi - Nanjing | China - North Shanxi | China - Nanjing | 2017 | Thyr | ??? | ||||
Northwest Yunnan - Guangdong | China - Xinsong | China - Dongfang | 1953 | 800 | 5000 | 2018 | Thyr | ??? | |
Xilin Hot - Taizhou | China - Xilin Hot | China - Taizhou | 800 | 10000 | 2017 | Thyr | ??? | ||
Xinjiang - Anhui | China - Wuicaiwan | China - Anhui | 3324 | 1100 | 12000 | 2019 | Thyr | ??? | |
Yinchuan - Zhuji | China - Yinchuan | China - Zhuji | 800 | 6400 | 2017 | Thyr | HVDC C&P System Provided by NR Electric | ??? | |
Dianxibei - Guangdong | China-Lijiang | China-Zhengzhen | 1928/0 | 800 | 5000 | 2017 | Thyr | Supplier: C-EPRI Electric Power Engineering Co.,Ltd | ??? |
Jinsha River II - Fujian | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Humeng - Liaoning | China | China | 800 | 6400 | 2018 | Thyr | ??? | ||
Rudong Offshore Wind Connector | China - Jiangsu Rudong | China - Jiangsu Rudong Platform | 100 | 400 | 1100 | 2022 | IGBT | Suppliers: XJ and RXHK for vavle, ZTT Cable | |
Sheyang Offshore Wind Connector | China - Jiangsu Sheyang | China - Jiangsu Sheyang Platform | 83 | 250 | 1100 | 2022 | IGBT | ||
Zhangbei DC Grid Project | China - Beijing | China - Zhangbei China - Fengning China - Kangbao | 495 | 500 | 3000/3000/1500/1500 | 2021 | IGBT | Four terminal DC Grid | |
Wudongde multi-terminal UHVDC demonstration project | China - Yunnan | China - Guangxi China - Guangdong | 1489 | 800 | 8000/3000/5000 | 2021 | Thyr/IGBT | Three terminal Hybrid DC system, Yunnan, Guangdong and Guangxi | |
Raigarh-Pugalur | India - Raigarh | India - Pugalur | 1830 | 800 | 6000 | 2019 | Thyr | Supplier: ABB | |
New HVDC Hokkaido-Honshu | Japan - Imabetsu | Japan - Hokuto | 122 | 250 | 300 | 2019 | IGBT |
Europe
2 As of 9 December 2015, LitPol Link started trial operations.3 Caithness Moray HVDC serves a number of renewable energy sources in the north of Scotland - see map
4 Contracts due to be placed in 2016.
5 Elia says construction expected to start in late 2017.
6 2021 date is that quoted to support the Shetland Wind Farm that SSE is a part investor in.
7 Decision on project expected in 2017 following consultation - see SSE PD reference.
North America
Converter station 1 | Converter station 2 | Type | Remarks | ||||||
HVDC Mechanicville–Schenectady | USA - Mechanicville,NY | USA - Schenectady, NY | 37 | 12 | 5 | 1932 | Merc | Experimental, frequency conversion 40 to 60 Hz Dismantled after WW II | |
Vancouver Island 1 | Canada - Delta, BC | Canada - North Cowichan, BC | 75 | 260 | 312 | 1968 | Merc | Supplier: ASEA | |
Pacific DC Intertie | USA - Celilo, OR | USA - Sylmar, CA, | 1362 | ±500 | 3100 | 1970 | Thyr | Transmission voltage ±400 kV until 1984 Maximum transmission power 1440 MW until 1982 From 1982 to 1984 1600 MW From 1984 to 1989 2000 MW Merc replaced by Thyr in 2004 Original supplier: ASEA, GE In 1989 upgraded by ABB In 2004 upgraded by ABB and Siemens | |
Nelson River Bipole 1 | Canada - Gillam, Manitoba | Canada - Rosser, Manitoba | 895 | 463.5 | 1854 | 1971 | Thyr | Used the largest mercury arc rectifiers ever built Original supplier: English Electric. In 1992/1993, Pole 1 upgraded to Thyr by Alstom. In 2004, Pole 2 upgraded to Thyr by Siemens. | |
Vancouver Island 2 | Canada - Delta, BC | Canada - North Cowichan, BC | 75 | 280 | 370 | 1977 | Thyr | Supplier: GE | |
Square Butte | USA - Center, ND | USA - Adolph, MN | 749 | 250 | 500 | 1977 | Thyr | Supplier: GE In 2004 Control system upgrade by ABB | |
Nelson River Bipole 2 | Canada - Sundance, Manitoba | Canada - Rosser, Manitoba | 940 | 500 | 2000 | 1978-1985 | Thyr | Supplier: Siemens | |
CU | USA - Underwood, ND | USA - Rockford, MN | 687 | 400 | 1000 | 1979 | Thyr | Supplier: ABB In 2004, control system upgrade by ABB | |
Path 27 | USA - Intermountain, UT | USA - Adelanto, CA | 785 | ±500 | 1920 | 1986 | Thyr | ||
Quebec - New England Transmission | Canada - Radisson, QC | Canada - Nicolet, QC ; USA - Ayer, MA | 1105 | 450 | 2250 | 1991 | Thyr | 3 terminals Converter stations near Windsor, QC and Monroe, NH were decommissioned in 2007. Supplier: ABB | |
Cross Sound Cable | USA - New Haven, CT | USA - Shoreham, Long Island, NY | 40 | 150 | 330 | 2002 | IGBT | Buried underwater cable Supplier: ABB | |
Neptune Cable | USA - Long Island NY | USA -Sayreville, NJ | 105 | 500 | 660 | 2007 | Thyr | Supplier: Siemens | |
Trans Bay Cable | USA - Pittsburg, CA | USA - San Francisco, CA | 85 | 200 | 400 | 2010 | IGBT | First HVDC system using Modular Multi-Level Converter Supplier: Siemens, Pirelli | |
Eastern Alberta Transmission Line | Canada – Newell, AB | Canada – Heathfield, AB | 485 | 500 | 1000 | 2015/2016 | Thyr | Supplier: Siemens | |
Western Alberta Transmission Line | Canada – Genesee, AB | Canada – Langdon, AB | 350 | 500 | 1000 | 2015 | Thyr | Supplier: Siemens | |
Nelson River Bipole 3 | Canada - Keewatinohk, Manitoba | Canada - Riel, Manitoba | 1324 | 500 | 2000 | 2018 | Thyr | Supplier: Siemens | |
Labrador-Island Link | Canada - Muskrat Falls, NL | Canada - Soldiers Pond, NL | 1135 | 350 | 900 | 2017 | Thyr | Drilling for cable landfall began in 2014. Supplier: Alstom Grid | |
Maritime Link | Canada - Bottom Brook, NL | Canada - Woodbine, NS | 360 | 200 | 500 | 2017 | IGBT | Right-of-way clearing began in 2014. Supplier: ABB | |
Plains & Eastern Clean Line | USA - Texas County, OK | USA - Shelby County, TN | 1207 | 600 | 4000 | Thyr | Approved March 2016 | ||
New England Clean Power Line | USA - Alburgh, VT | USA - Ludlow, VT | 248 | 320 | 1000 | 2020 | |||
Îles-de-la-Madeleine Cable Connection | Canada - Percé, QC | Canada - Cap-aux-Meules, QC | 225 | ? | 80 | 2025 | ? | Buried undersea and underground | |
Juan de Fuca Cable Project | USA - Port Angeles, WA | Canada - Victoria, BC | 35 | 150 | 550 | ? | IGBT | Buried undersea and underground Supplier: ABB | |
Rock Island Clean Line | USA - O'Brien County, IA | USA - Grundy County, IL | 805 | 600 | 3500 | ? | Thyr | Supplier: Siemens | |
TransWest Express | USA – Sinclair, WY | USA – Boulder City, NV | 1165 | 600 | 3000 | ? | Final EIS expected in April 2015. | ||
Grain Belt Express | USA - Ford County, KS | USA - Sullivan County, IN | 750 | 600 | 3500 | ? |
South America
Converter station 1 | Converter station 2 | Type | Remarks | ||||||
Itaipu 1 | Brazil - Foz do Iguaçu, Paraná | Brazil - São Roque, São Paulo | 785 | 600 | 3150 | 1984 | Thyr | Supplier: ABB | |
Itaipu 2 | Brazil - Foz do Iguaçu, Paraná | Brazil - São Roque, São Paulo | 805 | 600 | 3150 | 1987 | Thyr | Supplier: ABB | |
Rio Madeira | Brazil, Porto Velho | Brazil, Araraquara | 2375 | 600 | 7100 | 2013 | Thyr | The longest transmission link in the world Suppliers: ABB, Alstom | |
Xingu-Estreito | Brazil - Anapu, Pará | Brazil - Ibiraci, Minas Gerais | 2076 | 800 | 4000 | 2017 | Thyr |
Back to back
Location | Type | Remarks | - | |||||
Carnegie Steel Company B2B | USA - Pittsburgh, Pennsylvania | ? | ? | ? | Merc | built for an interconnection between 60 Hz-utility system and a 25 Hz System, dismantled | - | |
Sakuma B2B | Japan - Sakuma | 125 | 300 | 1965 | Merc | replaced in 1993 by new converter using light-triggered thyristors | - | |
Eel River B2B | Canada - Eel River, NB | 80 | 320 | 1972 | Thyr | life extension project 2014 | - | |
David A. Hamil B2B | USA - Stegall, Nebraska | ±50 | 100 | 1977 | Thyr | Supplier: GE | - | |
Shin Shinano B2B | Japan - Shin Shinano | 125 | 600 | 1977 | Thyr | Supplier: Toshiba, Hitachi | - | |
Acaray B2B | Paraguay - Ciudad de Este | 25.6 | 50 | 1981 | Thyr | - | ||
Vyborg B2B | Russia - Vyborg | ±85 | 1065 | 1982 | Thyr | extended up to 1420 MW in 2001 | - | |
Dürnrohr B2B | Austria - Dürnrohr | 145 | 550 | 1983 | Thyr | shut down in October 1996, dismantled in 2007 | - | |
Artesia, New Mexico B2B | USA - Artesia, NM | 82 | 200 | 1983 | Thyr | - | ||
Chateauguay B2B | Canada – Châteauguay, QC | 140 | 1000 | 1984 | Thyr | Control system upgrade by ABB in 2009 | ||
Oklaunion B2B | USA - Oklaunion, TX | 82 | 200 | 1984 | Thyr | ABB replacement in 2014 | ||
Blackwater, New Mexico B2B | USA - Blackwater, NM | 57 | 200 | 1984 | Thyr | Valve cooling and control systems upgrade by ABB in 2009 | - | |
Madawaska, Quebec B2B | Canada - Dégelis, QC | 140 | 350 | 1985 | Thyr | - | ||
Miles City, Montana B2B | USA - Miles City, MT | 82 | 200 | 1985 | Thyr | - | ||
Highgate, VT B2B | USA - Highgate, VT | 56 | 200 | 1985 | Thyr | Refurbishment by ABB in 2012, | ||
Uruguaiana B2B | Brazil - Uruguaiana | 17.9 | 53.9 | 1986 | Thyr | |||
Broken Hill B2B | Australia - Broken Hill | 8.33 | 40 | 1986 | Thyr | - | ||
Virginia Smith B2B | USA - Sidney, NE | 50 | 200 | 1988 | Thyr | - | ||
Vindhyachal B2B | India - Vindhyachal | 176 | 500 | 1989 | Thyr | - | ||
McNeill B2B | Canada - Mc Neill, AB | 42 | 150 | 1989 | Thyr | Supplier: Alstom | - | |
Wolmirstedt B2B | Germany - Wolmirstedt | 160 | 600 | Thyr | construction work was stopped after reunification, static inverter hall is today part of a recycling yard | - | ||
Etzenricht B2B | Germany - Etzenricht | 160 | 600 | 1993 | Thyr | shut down in October 1995, dismantled in 2009 | - | |
Vienna-Southeast B2B | Austria - Vienna | 142 | 600 | 1993 | Thyr | shut down in October 1996, dismantled in 2007 | - | |
Chandrapur B2B | India - Chandrapur | 205 | 2x500 | 1998 | Thyr | Supplier: Alstom | - | |
Welsh HVDC Converter Station B2B | USA - Titus County, TX | 162 | 600 | 1998 | Thyr | - | ||
Garabi HVDC | Brazil - Garabi | ±70 | 2200 | 1999 | Thyr | Brazil-Argentina Interconnection. Supplier: ABB In 2002, the second phase 'Garabi 2' was supplied by ABB. | - | |
Vizag 1 | India - Visakhapatnam Gazuwaka | 205 | 500 | 1999 | Thyr | Supplier: Alstom | - | |
Minami-Fukumitsu B2B | Japan - Minami - Fukumitsu | 125 | 300 | 1999 | Thyr | - | ||
Rivera B2B | Uruguay - Rivera | 22 | 70 | 2000 | Thyr | Supplier: Alstom | - | |
Eagle Pass, Texas B2B | USA - Eagle Pass, TX | 15.9 | 36 | 2000 | IGBT | - | ||
Sasaram B2B | India - Sasaram | 205 | 500 | 2003 | Thyr | Supplier: Alstom | - | |
Rapid City DC Tie B2B | USA - Rapid City, SD | 13 | 200 | 2003 | Thyr | - | ||
Vizag 2 | India - Visakhapatnam | 176 | 500 | 2005 | Thyr | Installed at Gazuwaka. Supplier:ABB. This is similar in specs to Vizag I and connects the Eastern and Southern grids. | - | |
Lingbao B2B | China - Lingbao | 168 | 360 | 2005 | Thyr | Supplier: NR, Extension project 2010: Supplier: ABB;C-EPRI Electric Power Engineering Co.,Ltd | ||
Lamar Co., Colorado B2B | USA - Lamar, CO | 63.6 | 210 | 2005 | Thyr | Supplier: Siemens; Combination of B2B HVDC & Grid Power Flow Controller | - | |
Higashi-Shimuzu B2B | Japan - Shimuzu | 125 | 300 | 2006 | Thyr | - | ||
Sharyland B2B | USA - Mission, TX | 21 | 150 | 2007 | Thyr | - | ||
Al Fadhili B2B | Saudi Arabia - Al Fadhili | 222 | 3x600 | 2008 | Thyr | Used mainly for Dynamic Reserve Power Sharing rather than economic energy transfer. Supplier: Alstom | - | |
Outaouais B2B | Canada - Buckingham, QC | 315 | 2x625 | 2009 | Thyr | Expected completion 2009. Supplier:ABB | - | |
Heihe B2B | China - Heihe | ±125 | 750 | 2011 | Thyr | Supplier: NR | - | |
Gaoling B2B | China - Gaoling | ±500 | 1500 | 2008 | Thyr | - | ||
Shandong - East B2B | China | 1200 | 2011 | Thyr | - | - | ||
Melo B2B | Uruguay - Melo | ±79 | 500 | 2011 | Thyr | Supplier:Alstom | - | |
North - Central B2B | China | 1000 | 2012 | Thyr | - | - | ||
Rio Madeira B2B | Brazil – Porto Velho | 100 | 800 | 2013 | Thyr | Supplier: ABB | - | |
Ridgefield B2B | USA - Ridgefield, NJ | 185 | 660 | 2013 | Thyr | Supplier: Siemens | - | |
Bheramara B2B | Bangladesh – Bheramara | 158 | 500 | 2013 | Thyr | - | ||
Akhaltsikhe B2B | Georgia - Akhaltsikhe | 96 | 700 | 2013 | Thyr | Supplier: Siemens | - | |
Mackinac B2B | USA - Saint Ignace, MI | 70 | 200 | 2014 | IGBT | Supplier: ABB | - | |
Railroad DC Tie | USA - Mission, TX | 21 | 150 | 2014 | Thyr | - | ||
Alytus B2B | Lithuania - Alytus | ±70 | 500 | 2015 | Thyr | - | ||
Mogocha B2B | Russia - Mogocha | ±32 | 2x100 | 2017 | IGBT | - | ||
Yu - E B2B | China-ChongQing, China-Hubei | ±420 | 4x1250 | 2017 | VSC-HVDC | Supplier: XJ Group Corporation, C-EPRI Electric Power Engineering Co.,Ltd, Rongxin Power Electronic Co.,Ltd. | ||
Khani B2B | Russia - Khani | ±32 | 2x100 | 2019 | IGBT | - | ||
Bentwisch B2B | Germany - Bentwisch | ±140 | 410 | 2019 | IGBT | - | - | |
Tres Amigas SuperStation | USA - Clovis, NM | ? | 5000 | ? | IGBT | - |
Maps
Europe
- Shetland HVDC Connection
- Caithness Moray HVDC
- Western Isles HVDC
- NorthConnect
- NSN Norway Kvilldal - UK Blyth, 1.4 GW under construction
- Eastern HVDC Link
- Moyle: Auchencrosh, UK - Ballycronan More, Northern Ireland, UK
- Western HVDC Link
- East–West Interconnector: Leinster, Ireland - Shotton, Wales, UK
- Celtic Interconnector
- FAB Link
- IFA-2
- HVDC Cross-Channel: Les Mandarins, France - Sellindge, UK
- Nemo Link
- BritNed: UK - Netherlands
- ALEGrO
- Viking Link
- HVDC DolWin1, HVDC DolWin2, HVDC DolWin3
- HVDC SylWin1
- HVDC HelWin1, HVDC HelWin2
- HVDC BorWin1, HVDC BorWin2, HVDC BorWin3
- NorNed: Feda, Norway - Eemshaven, Netherlands
- NORD.LINK: Germany - Norway
- Skagerrak 1, 2, 3, and 4: Tjele, Denmark - Kristiansand, Norway
- Konti-Skan 1 and 2: VesterHassing, Denmark - Stenkullen, Sweden
- StoreBælt: Fyn, Denmark - Zealand, Denmark
- Baltic Cable: Lübeck- Herrenwyk, Germany - Kruseberg, Sweden
- Kontek: Bjæverskov, Denmark - Bentwisch, Germany
- SydVästlänken
- SwePol: Stärnö, Sweden - Wierzbięcin, Poland
- LitPol Link
- NordBalt
- HVDC Visby–Näs
- Gotland: Västervik, Sweden - Ygne, Sweden
- Fenno-Skan: Rauma, Finland - Dannebo, Sweden, Fenno-Skan 2
- ÅL-link
- Estlink: Harku, Estonia - Espoo, Finland
- Estlink 2
- Cometa: Valencia, Spain - Mallorca, Spain
- INELFE
- HVDC Italy–Corsica–Sardinia: "SACOI" - Codrongianos, Sardinia, Italy - Lucciana, Corsica, France - Suvereto, Italy
- SAPEI, Sardinia - Italian mainland
- HVDC MON.ITA Project
- HVDC Italy-Greece: Arachthos, Greece - Galatina, Italy
- EuroAsia Interconnector
- EuroAfrica Interconnector