Llangollen Railway


The Llangollen Railway is a volunteer-run heritage railway in Denbighshire, North Wales, which operates between Llangollen and Corwen. The standard gauge line, which is long, runs on part of the former Ruabon - Barmouth GWR route that closed in 1965. It operates daily services in the summer as well as weekends throughout the winter months, using a variety of mainly ex-GWR steam locomotives as well as several diesel engines and diesel multiple units.
A extension of the railway has been built to complete the line to Corwen.

History

Commercial Service: 1865–1962

Llangollen was already a popular place for tourists by the 1840s. Travel up to this point had been by horse-drawn carriage, but by the 1840s the Shrewsbury to Chester line had been completed, allowing passengers to alight at , and then take a coach towards Holyhead.
However, the commercial development of the local mining industry meant that the development of a railway became essential to the region's economic development. A number of schemes were proposed, including one by the LNWR, but it was not until 1 August 1859 that scheme engineered by Henry Robertson received Royal Assent. The Vale of Llangollen Railway left the Shrewsbury to Chester main line south of, and proceeded as a single track line on a double track route via to the new station at Llangollen. The line opened to freight on 1 December 1861, and to passengers on 2 June 1862 at a temporary terminus on the town's eastern outskirts.
The extension to was undertaken by the associated but separate Llangollen and Corwen Railway company, and involved constructing a long tunnel under the Berwyn Mountains. It, together with the new centrally positioned and larger station in Llangollen, opened for service on 1 May 1865.

Closure

Designated for closure under the Beeching cuts, the railway closed to passenger services on Monday 18 January 1965. The section between Ruabon and Llangollen Goods Yard remained open for freight traffic until April 1968, but immediately after the cessation of operations the track was removed from the whole line between Ruabon and Barmouth.

Preservation

Reopening: 1972–1975

After the Beeching Axe, the Flint and Deeside Railway Preservation Society was founded in 1972 with the aim of preserving one of the "axed" railways. Originally the society was interested in preserving the Dyserth to Prestatyn line; however that line was deemed unsuitable because a small amount of freight traffic was still using it. The society refocused its attention on the Llangollen to Corwen section of the Ruabon to Barmouth line. The local council granted a lease of the Llangollen railway station building and of track to the society, with the hope that the railway would improve the local economy and bring more tourists to Llangollen. The station reopened on 13 September 1975, with just of track.

Rebuilding and Resurrection: 1975–1996

Early progress was slow due to a lack of funding, though in 1977 Shell Oil donated a mile of unused track. Volunteers started laying the track with the aim of reaching Pentrefelin, from Llangollen. Work finished in July 1981 with the remaining quarter mile of track used to lay sidings at the old Llangollen Goods Junction to house the railway's growing fleet of rolling stock.
The working railway attracted the interest of many private companies, as well as the local council who renewed the lease of the land to the railway for a further 21 years. The Llangollen Railway Trust was donated significant amounts of track, allowing the next extension of the line to. This involved a £30,000 refurbishment by the local council of the Dee Bridge, which had fallen into disrepair since the commercial closure of the line. The first trains operated over the newly extended 1.75 mile line to Berwyn in March 1986. As rebuilding work progressed train services were later extended to Deeside Halt, Glyndyfrdwy and finally into Carrog on 2 May 1996.

Extension to Corwen

In 2011, work finally started on the section of track past the site of the closed to Corwen. As the former Corwen railway station site has been in private use as an Ifor Williams Trailers showroom since 1990, and the track bed in between also sub-divided, a new temporary station was built on the eastern side of the town.
The first stage of the project was completed in late 2014, with special trains running on 22 October 2014 to the new station at for those who had contributed to the project. Regular passenger services to started on 27 October 2014. The official opening, on 1 March 2015, was marked by a special train.
The section marks the full operational length of the preserved line. The trust cannot extend eastwards towards Ruabon, or westwards to Cynwyd as the trackbed was not safeguarded against modern development. The final stage is a new station, Corwen Central, with permanent facilities and a run round loop.

Locomotives and rolling stock

Most trains are steam-hauled. The railway's workshops are currently the national focus of four major independent projects to rebuild steam locomotive types rendered extinct by scrapping in the 1960s: an ex-GWR 'Grange' Class 4-6-0 ; an ex-LMS Fowler 'Patriot' 4-6-0 ; an ex-GWR '4700' Class 2-8-0 Night Owl ; and an ex-LNER B17 4-6-0,.