M0 motorway (Hungary)


The M0 motorway is a ringroad around Budapest, the capital of Hungary. The ring presently connects motorways M1, M7, M6, M5, M4, M3, M2, connecting currently to Highway 11. The whole length of the motorway is planned at about 108 km. About 78 km have been completed as of 2013.

Sections

M1-M7-M6-M5 section (South)

The 29 kilometer long section between M1 and M5 is the oldest section of the M0 motorway and was built between 1988 and 1995. It originally did not comply with formal motorway specifications; it was built as a 2+2 lanes road without hard shoulders. Speed limit on this section was 80 km/h. Initially there were no jersey barriers between the two lanes in each direction, they had to be added some years after the road was completed because reckless drivers overtook in the opposite lane causing many fatal frontal crashes. Small bridges in this section were initially built twice as wide as necessary, because a widening of the road was already anticipated in the original plans.
The widening happened in 2011 and 2013, since then most of this busy section has got 4x lanes, and speed limits were be raised to 110 km/h.
The southern section upgraded to a six lane motorway was delivered between M1 and Highway 51 on 30 June 2013. The section between Highway 51 and M5 was renamed Highway M51 when a new section directly connected the M1-M5 section to the M5-M4 section of the M0. This new section was completed on 31 August 2013. The short section between M1 and M7 was upgraded to a six lane motorway in 2015.

M5-M4 section

The 12 kilometre long section between M5 and the initial section of the future M4 was completed in 2005. Maximum speeds on this section are 110 km per hour.

M4-M3 section (East)

The 26 kilometre long section between the future M4 and M3 was completed in September 2008.

M3-Megyeri Bridge section

The 7 kilometre long section between M3 and the Megyeri Bridge was opened before it connected to the rest of the M0 and was known as Highway 2/B and Highway 2/A. Both 2/B and 2/A are four-lane highways, but Highway 2/A doesn't feature a median between the lanes. Maximum speeds on Highway 2/A are 80 kilometers per hour. It was renamed to M0 when the M5-M3 section was completed. Also opened in September 2008, the Megyeri Bridge, opened in September 2008, further connects M0 to Highway 11.

Highway 11-Highway 10 section

The 9 kilometre section between Highway 11 and Highway 10 is planned but construction is not scheduled yet. A stub ramp near its current terminus may indicate the planned routing of the new section.

Highway 10-M1 section

The 18 kilometre remaining section between Highway 10 and the oldest part of the M0 beginning at the M1 interchange.

Junctions, exits and rest area

Archeological research

Between 2001-2006 an archeological site of great scientific importance was unearthed when building the southeastern sector of the M0 motorway.