M4 (Istanbul Metro)


The M4, officially referred to as the M4 Kadıköy–Tavşantepe metro line, is a, 19-station rapid transit line of the Istanbul Metro. Running between Kadıköy and Tavsantepe, it is the first rapid transit line operating on the Asian side of Istanbul. The M4 mostly runs under State road D100, parallel to the Istanbul-Ankara railway and is entirely underground.
The M4 opened on 17 August 2012 with a large ceremony in Kadıköy, in which Prime Minister Recep Tayyip Erdoğan personally took part in. On 29 October 2013, with the opening of Marmaray rail service under the Bosphorus, Ayrılık Çeşmesi station was opened to allow passengers to transfer between lines. On 10 October 2016, 3 new station added to the line.

History

A plan to build a subway line on the Asian side of İstanbul was approved in 2005. In 2008, a 751 million construction contract was awarded to a consortium of Astaldi, Makyol and Gülermak. The rolling stock was ordered from the Spanish company CAF. In mid-2010, the construction of the tunnels was completed and the track laying started. The route has connections with TCDD's Marmaray system at Ayrılıkçeşmesi and the İstanbul Metrobus system at Ünalan. The scheduled opening date was December 2011 up to Kartal, but it was postponed because of signalization works.

Stations

The M4 has a total of 19 stations in operation, with 4 more under construction.

StationDistrictOpenedConnections
Kadıköy Kadıköy17 August 2012 Şehir Hatları
İDO
Turyol
İETT Bus: 1, 3, 3A, 3B, 8, 8A, 11D, 12A, 12H, 13, 13B, 14, 14A, 14C, 14D, 14DK, 14E, 14F, 14K, 14KS, 14R, 14S, 14ŞB, 14Y, 16, 16D, 16K, 16KH, 16Y, 17, 17L, 18K, 19, 19F, 19S, 21A, 21C, 21G, 21K, 21U, 110, 120M, 125, 130Ş, 222, 319, 500A, 500T
Havabüs
Ayrılık Çeşmesi Kadıköy29 October 2013 TCDD Taşımacılık: Marmaray
İETT Bus:
Acıbadem Kadıköy17 August 2012 İETT Bus: 3A, 11T, 13M, 13Y, 14A, 14BK, 14DK, 15BK, 16A, 16B, 16C, 16F, 16KH, 16M, 16U, 16Y, 16Z, 17K, 18E, 18K, 18Y, 18Ü, 19, 19A, 19B, 19E, 19FK, 19H, 19T, 19Z, 20E, 20Ü, 21B, 21C, 21G, 21K, 21U, 130, 130A, 130Ş, 319, 320A, E-10, E-11
Ünalan Kadıköy17 August 2012 Metrobus: 34A, 34AS, 34G, 34Z
İETT Bus: 3A, 11T, 130, 13M, 13Y, 14A, 14BK, 14DK, 15BK, 16A, 16, B, 16C, 16F, 16KH, 16M, 16S, 16U, 16Y, 16Z, 17K, 17P, 18A, 18E, 18K, 18M, 18Ü, 18V, 18Y, 19, 19A, 19B, 19E, 19FK, 19H, 19T, 19Z, 20E, 20Ü, 21B, 21C, 21G, 21K, 21U, 130A, 130Ş, 319, 320A, E-10, E-11
Havabüs
Göztepe Kadıköy17 August 2012 İETT Bus: 3A, 8E, 9K, 10E, 10G, 11T, 13M, 13Y, 14A, 14B, 14BK, 14ES, 15BK, 15ÇK, 15SK, 16A, 16B, 16C, 16F, 16KH, 16M, 16S, 16U, 16Y, 16Z, 17K, 17P, 18A, 18E, 18K, 18M, 18Ü, 18V, 18Y, 19, 19A, 19B, 19E, 19FK, 19H, 19T, 19Z, 20D, 20E, 20K, 20Ü, 21B, 21C, 21G, 21K, 21U, 129T, 130, 130A, 130Ş, 202, 251, 252, 319, 320A, E-10, E-11
Yenisahra Kadıköy17 August 2012 İETT Bus: 8A, 8Y
Havabüs
Kozyatağı Kadıköy17 August 2012 İETT Bus: 14KS, 14T, 15KB, 16A, 16B, 16C, 16F, 16FK, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 19, 19B, 19FK, 19H, 19Z, 21B, 21C, 21G, 21K, 21U, 129L, 129T, 130, 130A, 130Ş, 251, 252, 319, 500T, E-10
Bostancı Kadıköy17 August 2012 İETT Bus: 10, 13AB, 14KS, 14T, 15KB, 16A, 16B, 16C, 16F, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 19, 19B, 19D, 19FK, 19H, 19SB, 19Z, 21B, 21C, 21G, 21K, 21U, 129L, 130, 130A, 130Ş, 251, 319, 500T, E-10
Küçükyalı Maltepe17 August 2012 İETT Bus: 16A, 16B, 16C, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 19B, 19H, 19Z, 21C, 21G, 21K, 21U, 130, 130A, 130Ş, 251, 500T, KM41, KM45
Maltepe Maltepe17 August 2012 İETT Bus: 16A, 16B, 16C, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 21C, 21G, 21K, 21U, 130, 130A, 130Ş, 133N, 251, 500T, E-10, KM42, KM43, KM44
Huzurevi Maltepe17 August 2012 İETT Bus: 16B, 16C, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 21C, 21G, 21K, 21U, 130, 130A, 130Ş, 133N, 136, 136R, 136Z, 251, 500T, E-10
Gülsuyu Maltepe17 August 2012 İETT Bus: 16B, 16C, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 21K, 21U, 130, 130A, 130Ş, 133N, 251, 500T, E-10
Esenkent Maltepe17 August 2012 İETT Bus: 16B, 16C, 16KH, 16S, 16U, 16Y, 16Z, 17K, 17P, 21K, 21U, 130, 130A, 130Ş, 500T, E-10, KM30, KM33
Hastane—Adliye Kartal17 August 2012 İETT Bus: 16C, 16KH, 16S, 16U, 16Z, 17K, 17P, 21K, 17S, 21K, 21U, 130, 130A, 130E, 130Ş, 132G, 134YK, 251, 500T, E-10, KM11, KM21, KM23, KM25, KM29, KM32, KM60, KM70, KM71
Soğanlık Kartal17 August 2012 İETT Bus: 16C, 16KH, 16S, 16Z, 17K, 17P, 21K, 130, 130A, 130E, 130Ş, 132G, 132M, 134GK, 251, 500T, E-10, KM11, KM12, KM21, KM23, KM25, KM29, KM32, KM60, KM70, KM71
Kartal Kartal17 August 2012 İETT Bus: 16C, 16KH, 16S, 16Z, 17K, 17P, 21K, 130, 130A, 130E, 130Ş, 131K, 131V, 131Y, 132C, 132ÇK, 132G, 132M, 132N, 132S, 132T, 132Y, 132Z, 134, 134CK, 134GK, 134K, 134UK, 251, 500T, E-10, KM11, KM12, KM21, KM23, KM25, KM29, KM31, KM32, KM60, KM70, KM71
Yakacık—Adnan Kahveci Kartal10 October 2016 İETT Bus: 16C, 16KH, 16Z, 17K, 17P, 130, 130A, 130E, 130Ş, 132G, 132Ş, 132T, 251, 500T, E-10, KM11, KM12, KM23, KM25, KM29
Pendik Pendik10 October 2016 İETT Bus: 16C, 16KH, 16Z, 17K, 17P, 130, 130A, 130E, 130G, 130Ş, 132, 132A, 132B, 132D, 132E, 132H, 132K, 132P, 132G, 133GP, 132T, 132Y, 251, 500T, E-9, E-10, KM10, KM11, KM12, KM13, KM23, KM24, KM25, KM28, KM29
Tavşantepe Pendik10 October 2016 İETT Bus: 16KH, 17K, 17P, 130, 130A, 130E, 130Ş, 132F, 132T, 132Y, 500T, E-9, KM2, KM10, KM11, KM12, KM13, KM14, KM23, KM24, KM29
Hastane Pendik2019
Şeyhli Pendik2019
Kurtköy Pendik2019
Sabiha Gökçen Pendik2019

Specifications

The stations Kadıköy, Ayrılıkçeşmesi, Ünalan and Göztepe are situated below sea level. The average distance between the stations is. The distance between the stations at Maltepe and Huzurevi is the shortest at. The distance between Bostancı and Küçükyalı is the longest with. The Operation Control Center of the line is situated in Esenkent and the depot is located in Maltepe. Another depot is to be built in Kaynarca in 2016 when the line extends there.
Train frequency is currently every 150 seconds during peak hours and could be shortened to 90 seconds later on. Trains remain at stations for an average of 15 seconds. Four-car trains have a 1,000 passenger capacity and eight-car trains have 2,000 capacity. Ridership capacity in one direction is 70,000 passengers hourly. Total travel time of the entire line is around 40 minutes.

Rolling Stock

M4 is operated by CAF trains every 150 seconds during peak hours. The frequency is much less on weekends and during off-peak hours.