Macau Refuse Incineration Plant


The Macau Refuse Incineration Plant is an incinerator in Taipa, Macau, China.

History

The plant was commissioned in 1992. In 2009, the waste processing capacity of the plant was doubled.

Architecture

The plant spans over an area of 4.5 hectares.

Technical details

The plant has a waste processing facility of 1,728 tons per day being done by its six incinerators, with the current capacity of 1,400 tons/day.