Main Line of Public Works


The Main Line of Public Works was a package of legislation supporting a vision passed in 1826 — a collection of various long proposed canal and road projects that became a canal system and later added railroads designed to cross the breadth of Pennsylvania with the visionary goal of providing the best commercial means of transportation between Philadelphia and Pittsburgh. Built between 1826 and 1834 by the Commonwealth of Pennsylvania, it established the Pennsylvania Canal System, the Allegheny Portage Railroad, and the Pennsylvania Canal System administrated under a new Commission.
Later amendments substituted a new technology, railroads in place of the canal that had been planned on the right-of-way of the substitute: the Philadelphia and Columbia Railroad, a new technology, for an envisioned canal link connecting the Delaware River to the Susquehanna River that would have proved too costly.

Historic backstory

Trans-Appalachian settlement had begun in earnest during the latter years of the French and Indian War, and the British post-war Governments side agreements, primarily made with the Iroquois Confederacy caused the policy curbing expanded settlement in the colonial mid-west was one cause that created support for the American Revolution.
After the 1779 Sullivan Expedition broke the power of the Five Nations of the Iroquois towards the end of the American Revolution, the Susquehanna Valley from above Pennsylvania's southern tier counties north into all of upstate New York, Mohawk River to Lake Erie, and the trans-Appalachian territories from the north banks of the Ohio River & all of its tributaries to the lower Great Lakes west as far as Minnesota & Wisconsin was thrown open to settlers.
As the war wound down, many a family group began to head west, having full knowledge of the existence of the French settlements scattered along the Mississippi up to Detroit — so scattered settlements sprang up from below the Wyoming Valley across the near west into the retreating western frontiers and the lands of the old Ohio Country.
By 1792, under the new American Constitution — this de facto land grab condition was endorsed, organized by treaty and territorial laws with the early acts of the United States Congress to mediate between the claims made by the various states, setting the western frontiers of New York, Pennsylvania, Connecticut, Virginia, Tennessee, and Kentucky, plus establishing the Northwest Territory and the legal systems under which it would be administered.
In the early 1800s, turnpikes and other transportation infrastructure works funded mostly by private funds or local governments had connected the new farms along the moving frontier back to the cities with crude trails of the Amerindians systematically widened and worked over to become foot paths, bridle trails worthy of mule train and finally widened into wagon roads. The 1790s-1850s was the age of turnpikes and the American Canal age, with pioneering projects like the Lausanne-Nescopeck Turnpike joining Philadelphia & the communities of the Delaware Valley through the Lehigh Gap to the Susquehanna, thence along the Susquehanna & Tioga Turnpike to Elmira, NY and ultimately, the new port of Buffalo, NY on Lake Erie.
A half-decade after that long way went online, the trouble with England exacerbated an already difficult energy crisis, and bituminous coal imports from Liverpool, England in 1812 ground to a halt under an embargo. Industrialists in Philadelphia pressed for some solution to their foundries fuel needs and by years end in 1812, legislation was on the books for improving the Schuylkill River into the Schuylkill Canal which ended up sadly underfunded, so got opened 'years late to the party' when, first in 1820 two of its disgruntled directors put the Lehigh Canal into operation in just under two years in late 1820, and the much heralded and derided 'Clinton's Folly', the Erie Canal, opened the first sections in 1821. Lead by the successes, by mid-decade canal projects and some railroads were being proposed, organized, chartered, or built throughout the entire northeast seaboard states — and no where more so than in Pennsylvania as influenced by neighboring New Jersey, Delaware and Baltimore.
By the 1810s, population west of the mountains was effectively exploding with new cities seeming to rise every couple of years anchored by 1800s transport hubs like Brownsville, Pittsburgh, Cincinnati, Buffalo, Detroit, New Orleans, and later by the 1840s, St.Louis, Chicago, and St. Joseph Missouri. The market potential of this burgeoning population was the target of Philadelphia and New Jersey's business class.
In 1823 entrepreneur White made a proposal which would have dammed and created a Ship Navigation allowing deep keeled coastal shipping to reach docks and pickup and tran-ship the coal steadily coming down the Lehigh Canal into Easton, Pennsylvania; the first 60 miles of which down to the Philadelphia suburb town of Bristol would later become the Delaware Canal. An employee of industrialist Josiah White's had figured out how to get "Rock Coal" to burn properly during the War of 1812 renewing serious interest in exploiting these relatively coal resources. Efforts to improve shipping capabilities on the Schuylkill Navigation was lagging hope when backers took to quarreling over the best way to proceed; disgusted, White distanced himself from the project. White went looking for a source of coal in 1815 looked at the mines of the failing and unreliable Lehigh Coal Mine Company—who'd almost managed to drop more coal in the Lehigh than they'd delivered to market since their founding in 1792. After surveying and deciding improving Navigation on the Lehigh could be feasible, returned to lease the operations of that company. Two years later he'd obtained the legal permissions "to ruin himself" fixing up the Lehigh, so founding the Lehigh Navigation Company and using a quasi-lock of his own design between 1818 & 1820, the works had made sufficient improvements to be able to deliver 365 tons of coal to Easton late in the year—by 1825 the annual tonnage had climbed to over per annum, and the two overachievers had firmly established anthracite as a reliable inexpensive fuel.
A couple years later, the legislature declined another offer by the Lehigh Coal and Navigation Company which had built the Lehigh Canal with private funds. LC&N was unquestionably one of the most innovative companies of the era, driving the mining, transportation and industrial development of Pennsylvania by example, implementation, and by funding quite a few projects, as well. This new proposal was to build—at the companies expense— the project that would become their version of the eventual Delaware Canal built by the states engineering managers a few years later. The route was nearly the same, but the Delaware Canal as the state built it had numerous engineering flaws, including locks both too short and unpaired locks LC&N's experience and expertise would have mitigated. LC&N had started coal flowing to Philadelphia using short squared-off blocky barges it called coal arks, but in 1822-23 was already re-doing the upper four locks on the Lehigh Canal to support a steam powered tug pulling boats over built to support two way traffic with full locks. By 1825 the volume of coal coming down the Lehigh & Delaware to Philadelphia was becoming huge and problematic — LC&N was rapidly over logging the forests feeding the Lehigh to build boats for the one way trip. The extra expenses of the lack of a tow path canal for the sixty miles Easton-Philadelphia was very costly to LC&N, and the state's Delaware Canal attempt when opened in 1832 was five years later than promised and didn't work; the State had to hire Josiah White to repair its major deficiencies, then needed LC&N's expertise to operate it. LC&N ended up running both canals into the 1930s, and retained the rights to the Lehigh until the 1960s. While some problems were fixable, the Delaware Canal's lock's design was always an costly economic problem until the Canal became the parkland and current haven for pleasure boats.
White and Hazard made the offer in return for a break on tolls, and even included an offer to operate the system at cost—the state garnering all the tolls. This offer too was declined, and in 1827 in a separate amending act, the state authorized the Delaware Canal, which was delayed for a few more years costing LC&N many dollars, until it was finally dug alongside, and generally in sight of the Delaware River between Easton down river to Bristol. When completed in 1832 by the state it also didn't work—having leaking issues and water supply problems like those that plagued the Union Canal and Schuylkill Navigation, and the state needed to hire Josiah White to fix it before it became fully usable in 1834. Lehigh Coal & Navigation Company would operate the Canal into the 1930s, and controlled its resources and those rights attained on the Lehigh until the 1960s when they reverted or conveyed back to the state.
Hence the Canal system was envisioned and built at the urging of New Jersey and Pennsylvanian businessmen, especially Philadelphia's bearing witness to the navigations improving commerce on the Lehigh and Schuylkill Rivers, though in 1824 both systems needed further development. But the same decision makers were also continually reading the copious press coverage about the progress, the works designs, and engineering feats accomplished or building as the Erie Canal progressed. Philadelphia's luminaries were vying with other coastal cities to become the United States' most important and influential port as the country's population expanded westward to the Ohio Country and Northwest Territory regions. The system would also not only open better access to the newly opened Southeastern Coal Region and the initial mines in the Panther Creek Valley but authorized an extension of the Lehigh Canal up to White Haven, and a railroad connecting that upper canal with the coal sources in the Wyoming Valley. All the eastern projects were to reliably provide clean-burning anthracite coal to eastern cities that had already consumed much of the eastern forests for heating fuel.

List of works

The rail portions of the system were authorized in 1828 by an act of the Pennsylvania General Assembly entitled An act relative to the Pennsylvania Canal, and to provide for the commencement of a Railroad to be constructed at the expense of the state and to be styled "The Pennsylvania Railroad".
Begun with Navigations construction along the Susquehanna and the West Fork of the Susquehanna with surveys for the best route over the barrier of the northern Allegheny Mountains, the system in time ran from Philadelphia on the Delaware estuary westwards across the great plain of southern Pennsylvania through Harrisburg and across the state to Pittsburgh and connected with other divisions of the Pennsylvania Canal. It consisted of the following principal sections, moving from east to west:
The canals reduced travel time between Philadelphia and Pittsburgh from at least 23 days to just four.
The Main Line of Public Works was completed in 1834 and was sold to the Pennsylvania Railroad on June 25, 1857, for $7,500,000. Within a year, the PRR replaced the Philadelphia-Pittsburgh route with an entirely rail-based system.

Philadelphia and Columbia Railroad

The Philadelphia and Columbia Railroad began in Philadelphia at Broad and Vine Streets, ran north on Broad and west on Pennsylvania Avenue, then headed northwest across the Columbia Bridge over the Schuylkill River. Just after crossing the river, it traveled up the Belmont Plane, an inclined plane in the current location of West Fairmount Park, and continued west across the eastern part of the state to Columbia, where the Columbia Plane headed down to the Susquehanna River. At that point, the eastern division of the canal continued north along the river and then west.
The was incorporated in 1829 to build a branch continuing east on Noble Street and Willow Street to the Delaware River. This opened in 1834.

Belmont Plane

The Belmont Plane ran from the Schuylkill River for, rising per for a total rise of. Steam-driven cables dragged the railway cars to the top of Belmont Hill.
The Plane was the site of a signal event in railroad history. On July 10, 1836, the Philadelphia-based Norris Locomotive Works drove a 4-2-0 locomotive up the Incline, making it the first steam locomotive to climb an ascending grade while pulling a load. The engine, named George Washington, hauled a load of, including 24 people riding on the tender and one freight car, up the grade at per hour. So remarkable was this accomplishment that reports in engineering journals doubted its occurrence. Nine days later, the engine repeated the feat in a more formal trial with an even greater load.
In 1850, the state bought the West Philadelphia Railroad, which had been incorporated in 1835 to bypass the Belmont Plane and failed after completing only the section from 52nd Street west to the main line at Rosemont. The state built the rest from 52nd Street east to downtown, but on a different alignment than the one originally planned; the new line, put into operation October 15, 1850, ended at the west end of the Market Street Bridge, from which the City Railroad continued east. The old line, which ran from the Schuylkill River up the Belmont Plane to Ardmore along the route of present-day Montgomery Avenue in Lower Merion Township, was abandoned.
The Columbia Bridge and line east to Broad and Vine Streets were sold to the Philadelphia and Reading Railroad as part of its main line. The Reading acquired the Northern Liberties and Penn Township Railroad in 1870, giving it access to the Delaware River.
The section of the old Pennsylvania Railroad running from Philadelphia west through Chester County and, by extension, the western suburbs of Philadelphia, is still known as the Main Line.
The Columbia Plane, which lowered railway cars down to the Eastern Division Canal along the Susquehanna River, was bypassed in 1840 by a new track alignment.

Eastern Division Canal

The Pennsylvania Canal's Eastern Division, which opened in 1833, ran along the east side of the Susquehanna River between Columbia and Duncan's Island at the mouth of the Juniata River. The canal included 14 locks with an average lift of. The state originally planned a canal of running between the Union Canal at Middletown to the Juniata. However, the plan changed in 1828, when the state opted to extend the Eastern Division further south to connect with the newly decided replacement of a canal by the Philadelphia and Columbia Railroad at historic Wright's Ferry.
Engineers faced complications at the northern end of the Eastern Division Canal, where it met the Juniata Division Canal and the Susquehanna Division Canal at Duncan's Island. Boats had to cross from one side of the Susquehanna River to the other between either the Susquehanna Division or the Juniata Division on the west side and the Eastern Division on the east side. They solved the problem by building a dam long and high between the lower end of Duncan's Island and the east bank of the Susquehanna. This formed a pool across which boats could be pulled from a wooden, two-tier towpath bridge at Clark's Ferry. Two Duncan's Island lift locks raised or lowered the boats traveling between the dam pool and the other canals.

Juniata Division Canal

The Juniata Division Canal was approved in segments starting in 1827 with a canal from near Duncan's Island in the Susquehanna River to Lewistown, upstream. Subsequently, the state agreed to extend the canal to Hollidaysburg and the eastern end of the Allegheny Portage Railroad, from the Susquehanna. A total of 86 locks were required to overcome a change in elevation of over the full length of the canal, which opened in 1832.
From the canal basin, westbound boats began their journey by being elevated about by a lock that brought them to the level of a wooden aqueduct on which they were towed to the south side of the Juniata. At North's Island, from the Susquehanna, they were towed by a water powered continuous rope to the north side of the river across a slack water pool formed by a dam. From North's Island to Huntingdon, the river was dammed in three more places to feed water to the canal, and above Huntingdon, 14 more dams were needed to create of slack water navigation in the river to supplement of travel in segments of canal. In addition, the state built three reservoirs on Juniata tributaries to keep the upper parts of the canal filled with water.

Remnants

A canal section of has been restored near Locust Campground, west of Lewistown. At the western end of the canal, the Hollidaysburg Canal Basin Park has preserved two canal basins and a connecting lock; a museum at the park illustrates how canal boats transferred between the canal and the Allegheny Portage Railroad.
The Pennsylvania Main Line Canal, Juniata Division, Canal Section was added to the National Register of Historic Places in 2002.

Allegheny Portage Railroad

From 1834 until 1854, when the Pennsylvania Railroad Company finished a competing line, the Allegheny Portage Railroad made continuous boat traffic possible over the Allegheny Mountains between the Juniata and Western Division Canals. It followed a route that included 11 levels, 10 inclined planes fitted with stationary engines that could raise and lower boats and cargo, a, viaduct over the Little Conemaugh River, and many bridges. Infrastructure included 153 drains and culverts. The railroad climbed from the eastern canal basin at Hollidaysburg and from the western basin at Johnstown. At its summit, the railroad reached an elevation of above sea level.
in and near the city and the canal connections to the city's three rivers.

Western Division Canal

In 1826, the state legislature authorized the first segment of the Western Division Canal, from Pittsburgh up the Allegheny River to its confluence with the Kiskiminetas River at Freeport. Pittsburgh residents favored a route that would follow the south bank of the Allegheny River and terminate in Pittsburgh, while residents of the borough of Allegheny favored a north bank canal ending in the borough, across the river from Pittsburgh. Eventually, the canal was run along the physically more favorable north bank, but the state agreed to build the main terminal and turning basin in Pittsburgh and a secondary terminal and connecting canal, the Allegheny Outlet, in the borough. Getting the main canal across the Allegheny River into Pittsburgh required an aqueduct of, the longest on the Pennsylvania Main Line route. Linking to the Ohio River at Pittsburgh, the Western Division Canal also linked, through a tunnel of under Grant's Hill in Pittsburgh, with the Monongahela River.
Subsequent Western Division Canal extensions went from Freeport up the Kiskiminetas and Conemaugh Rivers to Blairsville and then to the western end of the Allegheny Portage Railroad at Johnstown. East of Tunnelton, the route went through a canal tunnel of built to avoid a long loop of the Conemaugh River. The first fully loaded freight boat traveled from Johnstown to Pittsburgh in 1831; the route through Grant's Hill opened in 1832. Over its length of, the canal employed 68 locks, 16 river dams, and 16 aqueducts. From Freeport, a separate extension, the Kittanning Feeder, ran up the Allegheny River to Kittanning.

Johnstown Flood

The 1889 Johnstown Flood was caused by the failure of the South Fork Dam, part of the Main Line of Public Works. The dam across the Little Conemaugh River in the hills above Johnstown, Pennsylvania, created a two-square-mile reservoir. Dubbed Lake Conemaugh, it supplied water to the Western Division Canal. When canal traffic declined, the lake and dam were abandoned, then sold to the Pennsylvania Railroad in 1857; the railroad in turn sold them to private interests. They were purchased by the South Fork Fishing and Hunting Club in 1879, and a private resort was built surrounding the lake. On May 31, 1889, following heavy rains, the South Fork Dam failed, sending 20 million tons of water down the gorge toward Johnstown. More than 2,200 people were killed.

Remnants

The Tunnelview Historical Site shows where in 1830 a canal tunnel of was built through Bow Ridge to avoid a long bend on the Conemaugh River, west of Blairsville. Saltsburg Canal Park, where Loyalhanna Creek joins the Conemaugh River to form the Kiskiminetas River, recognizes the canal's economic contribution to Saltsburg.

Points of interest

FeatureCoordinatesDescription
PhiladelphiaCity at the eastern terminus of the Main Line of Public Works and the Columbia–Philadelphia Railroad
ColumbiaBorough at the western terminus of the Philadelphia and Columbia Railroad and the southern terminus of the Eastern Division Canal
Duncan's Island.Island at the northern terminus of the Eastern Division Canal and the eastern terminus of the Juniata Division Canal
LewistownBorough at the western terminus of the Juniata Division Canal and the eastern terminus of the Allegheny Portage Railroad
HollidaysburgBorough at the western terminus of the Juniata Division Canal and the eastern terminus of the Allegheny Portage Railroad
JohnstownCity at the western terminus of the Allegheny Portage Railroad and the eastern terminus of the Western Division Canal
PittsburghCity at the western terminus of the Main Line of Public Works and the Western Division Canal
KittanningBorough at the northern terminus of the Kittanning Feeder Canal