The McLeod Reorganisation of Army Logistics was a major reorganisation of the British Army in the 1960s, principally affecting the Royal Engineers, Royal Army Service Corps and Royal Army Ordnance Corps. Its principal outcome was the disbandment of the RASC and the creation of the Royal Corps of Transport. The Committee was established at the direction of the Army Council in March 1963 and it was led by General Sir Roderick McLeod. The Committee worked quickly and its recommendations, with few exceptions, were officially notified to Parliament on 22 April 1964. The principal outcomes of the Committee were to rationalise transport to a newly formed RCT and rationalise many supply activities and ancillary logistic services to the RAOC.
Background to reform
The logistic services of the Army had evolved over a long period as need arose and circumstances dictated. Up to the early 1960s there had been no major organisational change since the closing years of the nineteenth century. Also the Army of the sixties was changing fast, national service had ended and the Army overall was becoming smaller, more mobile, technically complex and savings had to be found. Meeting these challenges was difficult where there was an overlap of functions. Transport and supply were two areas where reform was pressing.
Transport
Transport related activity was divided between the Royal Engineer that operated movement control, port operation, inshore craft, pipelines and railways and the RASC that operated road vehicles, fixed wingliaison aircraft and seagoing vessels. It was agreed that the entire RE organisation, less fuel farms and railway and pipeline construction and maintenance, should transfer to a newly formed RCT.
Supply and ancillary services
Supply activity was principally divided between the RAOC and the RASC. It was agreed that all the RASC ranges should be transferred to the RAOC. There were four other supply systems that were left unchanged:
In addition a range of other non-transport functions were transferred from RASC to RAOC. These were: control of the staff clerks, who provided clerical support in headquarters, the sponsorship of Navy Army and Air Force Institute , barrack services, including accommodation stores, and sponsorship of the Army Fire Service.
Implementation
The report was implemented in three phases: Phase I: RAOC took over RASC functions allocated. Phase II: RCT formed, RASC and RE elements transferred. Phase III: Existing depots absorbed and rationalised by RAOC Overall this substantial change went very smoothly and amicably. An early recommendation was that staff clerks should be transferred to R SIGNALS but this was set aside as it was recognised that the staff clerks traditionally provided the principal cadre for commissioned barracks officers of the RASC that were being transferred to RAOC.
The McLeod report produced wideranging and sensible changes that were swiftly and efficiently implemented. However by dividing supply and transport it created new interface problems in operations. The division of responsibility for combat supplies on operations so that RAOC was responsible rear of the divisional rear boundary, with RCT responsible forward, began to become a major constraint as the predicted pace of battle quickened and systems such as the Demountable Rack Offload and Pickup System were introduced to reflect this new imperative. Also leaving minor supply systems outside the RAOC probably delayed the introduction of an integrated supply system with its attendant efficiencies. The creation of the Royal Logistic Corps in 1993 and the Defence Logistics Organisation in 2000 largely addressed these issues.