Metro (Minnesota)
Metro is a high-capacity transport network serving the Minneapolis-St. Paul metropolitan area. As of 2016, the system consists of two light rail lines operated by Metro Transit, along with three bus rapid transit lines: the Red Line, an extension of the Blue Line operated by the Minnesota Valley Transit Authority, and the A Line and C Line, two arterial bus rapid transit lines operated by Metro Transit. The five lines connect Downtown Minneapolis and St. Paul with Bloomington, Minneapolis-St. Paul International Airport, Roseville, and Brooklyn Center, with several extensions in the planning stages.
Service along the entire length of the Green Line operates 24 hours a day, 7 days a week, a rarity among light rail lines in the United States, but present on some heavy rail lines such as the New York City Subway and PATH. Metro Transit also provides 24/7 service between the stations serving the Lindbergh and Humphrey terminals of MSP Airport; the remainder of the Blue Line operates from 3:29 a.m. to 1:54 a.m. Monday through Thursday, and 24 hours a day from 3:29 a.m. on Friday morning to 1:54 a.m. on Sunday morning.
In the 1970s, roughly contemporaneous with the construction of Washington D.C.'s Metro system and San Francisco's Bay Area Rapid Transit, the newly formed Metropolitan Council contemplated the creation of a similar mass transit for the Minneapolis-St. Paul metro area, but the idea was eventually abandoned due to opposition from the Minnesota Legislature. For the next few decades, there were repeated proposals to build light rail along several corridors, particularly the University Avenue corridor between downtown Minneapolis and St. Paul, but the idea of light rail only gained steam in the late 90s.
In 1999, the Minnesota Legislature approved funding for the first line along Hiawatha Avenue in south Minneapolis, which opened in 2004. In 2011, in anticipation of the opening of the Red Line and Green Line, and in order to help passengers better identify with each of the routes, Metro Transit announced that the system would be rebranded and each line assigned a unique color. The first phase of the Red Line opened in mid-2013, and the first phase of the Green Line in mid-2014. Extensions are planned to bring the system into the western metro area, with construction anticipated near the end of the decade.
Current system
Lines
- Blue Line: Target Field Station - Minneapolis-St. Paul International Airport - Mall of America
- Green Line: Target Field Station - University of Minnesota - Union Depot
- Red Line: Mall of America - Apple Valley Transit Station
- A Line: 46th Street station - Rosedale Center
- C Line: Downtown Minneapolis - Brooklyn Center Transit Center
Together, the two light rail lines run on of route. There are a total of 82 stations; five shared between the Green and Blue Lines in downtown Minneapolis, one shared at the Mall of America between the Blue and the Red Lines, one shared at 46th Street station between the Blue and the A Lines, one shared at Snelling Avenue station between the Green and the A Lines, 13 exclusively for the Blue Line, 16 for the Green Line, four for the Red Line, 18 for the A Line, and 23 for the C Line. The main hub of the system is Target Field Station in Minneapolis, though Union Depot in St. Paul is envisioned as an additional future hub.
Trains and buses run approximately every 10 minutes throughout the day, with reduced schedules at night and on weekends. All stations have electronic displays that show predicted real-time departure information, known as NexTrip. Predicted real-time departure information is also available through Metro Transit's website.
Fares
Metro uses a proof-of-payment system, requiring riders to carry tickets at all times. Fares are purchased before boarding, either at ticket machines located in the stations or by scanning a Go-To card at dedicated pedestals. Tickets are valid for 2 1/2 hours after purchase, with transfers available to other Metro lines as well as any Metro Transit bus routes. Within the two Downtown Zones of Minneapolis and St. Paul, tickets are 50¢; otherwise they follow normal Metro Transit fares:- Adults: $2.50 rush hours, $2 otherwise
- Seniors, Youth, Medicare Card Holders: $2.50 rush, $1 otherwise
- Persons with Disability: $1
- Children under 6: free with paying rider. Limit is 3.
Passengers at Minneapolis-St. Paul International Airport can move between the Terminal 1-Lindbergh station and Terminal 2–Humphrey station free of charge.
Future
Several expansion projects are planned for the Metro system, at various stages of completion. These include both light rail extensions and connecting bus rapid transit services.B Line
The B line is an arterial bus rapid transit route proposed for the Twin Cities' Lake Street/Marshall Avenue corridor, running from Bde Maka Ska in Minneapolis' Uptown neighborhood to the Snelling & Dayton station of the A Line, with an extension to downtown St. Paul along Selby Avenue. Planning is underway and will continue through early 2020. Station design is planned for 2020–2021 with beginning of construction anticipated in 2022, pending full funding.D Line
The D Line is an arterial bus rapid transit route currently in engineering stages. The route will travel from Brooklyn Center through Downtown Minneapolis and onward through south Minneapolis to the Mall of America. The Route will travel mostly on Fremont and Emerson Avenues in North Minneapolis and Chicago Avenue in South Minneapolis. The project is shovel ready and is awaiting an additional $20 million to begin construction.E Line
The E line is an arterial bus rapid transit route proposed for the Twin Cities's Hennepin Avenue corridor. Metro Transit's 2012 rapid bus study identified a route that would run from downtown Minneapolis to a future Lake Street station on the METRO Green Line extension. However, after further study in the spring of 2019, Metro Transit recommended a route from the Green Line's Stadium Village stop, through Dinkytown to Hennepin Avenue, and then south via Hennepin, 44th Street, and France Avenue to the Southdale Transit Center. Pending full project funding, E Line construction could begin as soon as 2023.Green Line extension
The Green Line extension is a planned expansion of the Green Line, to run from Target Field Station to several southwestern suburbs. The project was given federal approval in November 2018, and ground was broken on construction on November 30, 2018 Completion of the project is expected in 2023, at an expected cost of approximately US$2 billion. It will be the largest infrastructure project in state history.Blue Line extension
The Blue Line extension is a planned extension of the Blue Line to Brooklyn Park. The project is under development with a planned 2024 implementation.Orange Line
The Orange Line is a planned bus rapid transit route to run along I-35W from Minneapolis south into Richfield, Bloomington and Burnsville, with plans to later extend into Lakeville. The Orange Line will parallel the Red Line approximately 3 miles to the east. It is expected to be in operation in 2021.Gold Line
The Gold Line is a planned bus rapid transit route to run along Interstate 94 from Woodbury to Mounds Blvd in St. Paul, then through downtown to Union Station, terminating near United Hospital. The project is under development with a planned 2024 implementation.Rush Line
The Rush Line is a planned bus rapid transit route to run largely along the Ramsey County Regional Railroad Authority corridor adjacent to the Bruce Vento Regional Trail from downtown Saint Paul to downtown White Bear Lake, Minnesota. The project is under development with a planned 2026 implementation.Riverview
The Riverview Corridor is a transit corridor connecting Downtown Saint Paul and the Mall of America in Bloomington via the Minneapolis-Saint Paul International Airport. The corridor serves an area from the Saint Paul Union Depot to the Mall via parts of the METRO Green Line and the METRO Blue Line, and a route running parallel to West 7th Street, which runs southwest from Downtown Saint Paul. The corridor creates a triangle connecting opposite ends of the Blue Line and Green Line. In December of 2017, a modern streetcar system similar to systems in Portland, Kansas City, and Detroit was selected as the locally preferred alternative with an alignment along West Seventh Street and MN-5.Other
There are also numerous proposals in early planning stages for routes along Interstate 394 from Minneapolis to Wayzata, Highway 169 from Minneapolis to Shakopee, Interstate 35 from Minneapolis and St. Paul to Forest Lake, Highway 36 from St. Paul to Stillwater and Highway 61 from St. Paul to Hastings.Operations
The Metro system's rail lines use a combination of exclusive and shared right-of-way, depending on the circumstances. Within the two Downtown Zones, trains run on surface streets in an exclusive right-of-way, without preemption. The Blue Line runs primarily alongside Hiawatha Avenue, along land originally acquired for expansion of that highway, except for a brief stretch in a tunnel underneath Minneapolis-St. Paul International Airport. The Green Line runs along the median of University Avenue in an exclusive right-of-way, except for a brief stretch of the Washington Avenue Transit Mall where its tracks are shared with buses. The Blue Line's at-grade crossings are protected by automated grade crossing gates; the Green Line's crossings move in regular traffic, with signal priority but no preemption.Since the completion of three-car station extensions in winter 2010, Metro Transit operates one-, two- and three-car trains on the Blue Line, depending on the time of day and ridership needs. Many stations on the line were initially built to be capable of serving only one- or two-car trains, as a cost-saving measure; all of the shorter platforms were designed and built with future extension in mind and currently all stations are capable of serving three-car trains. The Green Line was built with three-car platforms at all stations.