Monterrey Metro


The Monterrey Metro, generally referred to as just Metrorrey is a fully grade-separated rapid transit system in Monterrey, Nuevo León, Mexico. Line 1 is elevated. Line 2 is half a subway and half elevated. It is the newest of Mexico's metro systems, with operation beginning in 1991., the system operated 40 high-floor electric trains, along a total system of 31 stations with a length of. As of June 2018, Line 3 is under construction.

Operations

Lines

The Monterrey Metro, officially known as Metrorrey has two lines with 31 stations.
Line 1 opened on April 25 of 1991 and has 19 stations, it runs through the center of the city from the north-west to the eastern part of the Monterrey Metropolitan Area. Built as an long line, it runs parallel to the former 1887 Topo Chico tramline and is grade-separated as it runs on an elevated structure. A complete ride along this line takes about 27 minutes.
Line 2 has 13 stations and is long, it is also fully grade-separated, partially on an elevated structure and partially underground, running from the center of the city towards the north. The first long underground segment opened on November 30 of 1994 with 6 stations, with the possibility of transferring to Line 1 at Cuauhtémoc station. In 2005 construction began on an expansion to the line with a total investment of US$200 million. Said expansion comprised 2 phases, the first one being long, it opened on October 31 of 2007 adding 3 more stations to the line. The second phase added another of elevated railway along the center of the Universidad avenue and 4 more stations, it was inaugurated on October 9 of 2008 by Nuevo León Governor Natividad González Parás and Mexican president Felipe Calderón.
Construction is in progress for a third rail line. Early in 2018, the state of Nuevo Leon signed a funding agreement to provide 600 million pesos to Metrorrey for continued construction on Linea 3. Up to that period, Metrorrey reported total expenditures on Linea 3 of over 10 billion pesos. The transit agency claims it will be spending these funds for viaducts, and station features, such as awnings, elevators, and escalators., construction for Linea 3 is complete, according to the Secretaría de Comunicaciones y Transportes, the federal transportation agency. However, state government officials state that service is not available because the rolling stock has not been delivered. Estimated delivery for twenty-six rail cars is December 2020, and after the rail cars arrive they will need to be tested on the tracks, further delaying the start of service on the line. Linea 3 covers runs a total distance of 7.5 kilometers, part of which is underground and part is elevated. The line is supported by eight rail stations.

Ridership

According to Mexico's National Institute of Statistics, Geography and Informatics, Metrorrey's two lines transported 180.8 million passengers in 2018, which corresponds to an average daily ridership of 495,000 passengers.

Fares

The following are the travel fares :
Metrorrey also offered "Boletos Multiviaje" until 2016. These tickets were intended for recurrent users and they are sold in denominations ranging from 15 to 85 trips.
Since the opening of the extension of the Line 2, Metrorrey began offering the "Mia" Card, a rechargeable card that can be loaded with multiple trip credits. The "Mia" card can be initially purchased for MXN20 and can be recharged in increments ranging from MXN1 to MXN100. Also, every MXN4, are added MXN0.50.
On May 16, 2009, Nuevo León governor Natividad González Parás announced that Metrorrey would be free for the following 60 days, as part of a program to reduce the effects of the economic downturn on citizens.

Rolling stock

The Metrorrey system uses 84 high-floor articulated vehicles, used to form two- or three-car trainsets each, with the possibility of forming up to four-car trainsets. The MM-93 cars have an air-conditioning system. The first 23 cars were manufactured in 1990 by the Mexican government-owned Concarril and the next 25 in 1992–93 by the Canadian company Bombardier, after it acquired Concarril in 1992, all 48 of these cars being built at a factory in Ciudad Sahagún, Mexico, and the two batches being "nearly identical". Those 48 cars were followed by 22 that were built in Spain by CAF, with the remaining 14 vehicles built by Bombardier. Specifically, Metrorrey ordered 25 two-section MM-90 cabs in 1988, and 23 MM-90/2F cabs in 1990 from Bombardier for Line 1; the latter type represents the second generation of the same vehicle equipped with high-tech components, including, among other things, asynchronous traction motors with the power supplied by catenary. The MM-93 cab, debuted during the opening of the Line 2, including full-closed windows, and an air-conditioning system, and following the expansion of Line 2, Metrorrey acquired 16 cabs based in an evolution of MM-90 / MM-90/2F cab.
In 2019, Metrorrey bought 24 former Frankfurt U-Bahn Type U3 trains, which were withdrawn from U-Bahn service in 2017. The trains were built by DUEWAG in 1979 and 1980, and will undergo a refurbishment programme by Talbot Services to extend their service life by 20 years.

Transmetro

Metrorrey also has a bus system that uses exclusive and obligatory stops along its route.
It has nine lines. On Metrorrey Line 1 there are four Transmetro lines, three in Talleres station and one in Exposición station. On Line 2 there are five more Transmetro lines, two at San Nicolas and three more at Sendero.
There is no additional fee, other than the standard Metro Ticket, to use Transmetro.

Future service

In July 2014, a contract was signed with CAF for 26 trains to run on Line 3. It is expected to open when the refurbished trains arrive at the end of 2020.

Gallery