Mukilteo station consists of a two side platforms, connected by a covered pedestrian overpass, sited along the BNSF Railway's Scenic Subdivision between Seattle and Everett. The station, located one block east of the Mukilteo ferry terminal on State Route 525, contains a 63-space park and ride lot with a drop-off area that is accessible through an entrance/exit from Front Street; the platform also houses a ticket vending machine and ORCA card readers. Mukilteo is served by the eight daily Sounder trains on weekdays, running on the North Line along the Puget Sound between Everett Station and King Street Station in Seattle. The runs are split between four morning and four afternoon runs, with a single round-trip gameday service provided for weekend events at CenturyLink Field and Safeco Field. Train service on the corridor, which includes BNSF freight traffic and Amtrak passenger service, is frequently disrupted and canceled during the autumn and winter seasons because of landslides from unstable slopes above the tracks. During the 2012–2013 winter season, a record-high of 206 passenger trains between Everett and Seattle were canceled, prompting the Washington State Department of Transportation to begin a three-year landslide mitigation project in 2013 that will stabilize slopes above the railroad between Seattle and Everett. The station is located one block east of the Washington State Ferries terminal, serving the Whidbey Island Ferry, which also functions as a transfer point for buses operated by Community Transit and Everett Transit: two all-day local buses connect Mukilteo to Lynnwood and Everett Station, while three peak-only commuter routes run to Downtown Seattle, the University of Washington, and the Boeing Everett Factory.
History
The Great Northern Railway had served Mukilteo between 1891 and 1970, including a major depot opened on November 1, 1903. A commuter rail station in Mukilteo had been part of the original Sound Transit proposal rejected in 1995 and adopted the following year, as part of a Seattle–Everett line on the existing BNSF corridor. The agency selected the station site in 1999, choosing a platform east of State Route 525 and the Washington State Ferries terminal over one at Mukilteo Lighthouse Park because of concerns arising from existing parking and traffic issues in the area. Work on the station was put on hold until the completion of a second track through the area, though Sound Transit did consider building a temporary platform to boost ridership on the North Line. A groundbreaking ceremony was held in August 2007 for the initial phase of the project, the northern side platform, as part of a multimodal transit hub built in conjunction with a new Mukilteo ferry terminal. The $19.2 million project, including preparations for a second phase to open in 2009, was funded by Sound Transit with a grant from the Federal Transit Administration. Sounder service from Mukilteo Station began on May 31, 2008, with a special weekend round-trip run to a Seattle Mariners game. The project was praised by local politicians for its multi-agency cooperation, especially between Sound Transit and Washington State Ferries. Construction on the second platform, an island platform connected via a pedestrian overpass, began in January 2014 with the closure of Mukilteo Lane near the station. Part of the existing North Platform was closed for use as a staging area in March 2014, expanding and contracting before and after rush hour, respectively. The $11 million project, designed by AECOM and HNTB in 2012, was originally scheduled to be completed in 2015. Delays in construction, including state approval of the new elevators, pushed back the completion date to April 2016. As part of the STart program, a percentage of construction funds went towards installing art made by Whidbey Island resident Linda Beaumont at the station. As part of the Mukilteo Multimodal Project, Sound Transit and the Washington State Department of Transportation planned to build a new ferry terminal in Mukilteo with upgraded transit connections. The new terminal, scheduled to open in 2020, will be located closer to the Sounder platforms and include a new bus station.