Nanning East railway station


Nanning East railway station is a metro station and a railway station of Liuzhou–Nanning intercity railway and Nanning–Guangzhou high-speed railway. The station is located in Qingxiu District, Nanning, Guangxi, China. The station, located in 66 Changhong Road, was opened Dec 26, 2014. It is a transportation center of high-speed railways, regular trains, buses, metro line 1 and coaches.

Construction and Structure

It has a total construction area of 251134 square meters, while some sources claim a larger area of 267471 square meters, and cost 6.07 billion yuan to build. The main building is 48.25 meters tall, 415 meters long and 196 meters wide. The elevated platform is 150 meters wide.
The overall shape of Nanning East Station is based on the theme of “Southern Gate, Rising Green City”. The pedestal adopts the shape of a corridor bridge, echoing the upper colonnade, which reflects the characteristics of the Guangxi veranda. The upper storey adopts a combination of triple eave roofs with different heights, which is lifted layer by layer, reflecting the characteristics of modern Guangxi's “rising by taking advantage of the potential”; the giant pillars on both sides of the north and south entrances are full and solid, supporting the central roof, showing the momentum of the “China South Gate”; the twelve pillars of the two-wing colonnade symbolize the twelve tribes of inhabitants of Guangxi; the branches on the top of the pillars stretch to form a whole, and the rhombus texture of the roof is intertwined, shaped like the crown of a large tree full of leaves. This not only shows the multi-ethnic harmony of Guangxi's solidarity and mutual aid, but also fully reflects the ecological characteristics of Nanning as a "Green City".
Nanning East station is also the most technically advanced station under the China Railway Nanning Group. It used an extensive system of steel, smart lighting design, air-conditioning, solar panels and electronic window curtains, along with natural sewage systems and energy management which can reduce the carbon footprint and fuel emissions. The construction used about 20,845 tonnes of steel.
The station building is divided into an elevated floor, a ground floor and an underground floor, with 4200 seats and 4 LCD displays, and has an area designated the "Liu Sanjie Nanning East Station Caring Zone". A total of 90 automatic ticket sales machines were set up. The elevated floor of the station is the departure floor. Social vehicles drop off passengers on this floor. Passengers enter the waiting area after entering the station to purchase tickets. The ground floor is the platform floor, where all passengers take the train on, and the first floor is the arrival floor.

Destinations

Currently, Nanning East station runs over 130 pairs of trains, mainly D-series trains which run at about 200km/h. From Nanning East station, one can go to 11 province-level cities and 19 administrative regions.
Destination provinceTrain destinations
North ChinaBeijing West, Shijiazhuang
South Central ChinaWuhan, Guangzhou, Shenzhen North, Zhuhai, Hong Kong
East ChinaJinan East, Shanghai Hongqiao, Nanjing South, Hangzhou East, Ningbo
Southwest ChinaGuiyang North, Kunming South, Chongqing West, Chengdu East, Dali
Northwest ChinaXian North
Guangxi ProvinceNanning, Guilin, Liuzhou, Beihai, Wuzhou South, Hezhou, Fanggangcheng North, Yulin, Baise, Sanjiang South

Metro station

Nanning East railway station currently connects to Nanning East Railway Station of the Nanning Metro, which is the eastern terminus of line 1. The connection is via exits A, D, E and F of the metro station.
The metro station is an island-like station in the Nanning Metro and to the south of the HSR station. It is oriented east-west and 4 storeys tall. There are 2 island platforms with one for Line 1 and one for the future Line 7.

History

The construction of Line 1 began at 15 December 2012. After the east segment of Line 1 tested running in 28 June, the metro station began service as one of the termini of line 1.