Newfoundland Railway
The Newfoundland Railway operated on the island of Newfoundland from 1898 to 1988. With a total track length of, it was the longest narrow-gauge railway system in North America.
Early construction
In 1880, a committee of the Newfoundland Legislature recommended that a narrow-gauge railway be built from the colonial capital in St. John's to Halls Bay, to the west. Construction was started on the Avalon Peninsula in August 1881 by the Blackman Syndicate. By 1884, the Newfoundland Railway Company had built west to Whitbourne before going into receivership.The bondholders of the bankrupt Newfoundland Railway Company continued to build a branch line from Brigus Junction to Harbour Grace, which was completed by November that year.
The colonial government undertook to build a branch from the junction at Whitbourne to the port of Placentia between 1886 and 1888.
Robert G. Reid
The colonial government sought new investors to continue the stalled project to Halls Bay and in June 1890, Scottish-born Montreal resident and railway engineer/contractor Robert Gillespie Reid agreed to build and operate the line. By 1892, Reid's workers were approaching the halfway point at the Exploits River when the government changed the terminus from Halls Bay approximately further west, first to St. George's and finally to Port aux Basques. The route itself was diverted inland up the Exploits valley and over the Gaff Topsails and away from the coast once on the north bank of the Exploits River. This extension to the system was initially operated as the Newfoundland Northern and Western Railway and for it, Reid was granted land totalling 13 km²/km.The new line west to Port aux Basques was completed between 1894 and 1898. At the same time, Reid proposed a ferry service across the Cabot Strait from Port aux Basques to North Sydney, Nova Scotia, and contracted for a steamship to be built in Scotland. The Bruce arrived in the fall of 1897, before the line was completed to Port aux Basques, so her initial runs to Cape Breton Island were made from Little Placentia Sound. On June 29, 1898 the first passenger train arrived at Port aux Basques and the Bruce set sail with passengers for North Sydney.
Later that year, the colonial government persuaded Reid's company to take over operation of the bankrupt Newfoundland Railway Company and its sister Harbour Grace Railway, as well as the government-owned Placentia branch, in order to unify the system across the entire island. The Reid company agreed to operate the lines for 50 years, in exchange for outright ownership and land grants. They also purchased the government drydock in St. John's and the telegraph system. The Reid company purchased eight new steamships to operate as coastal ferries around the island and into Labrador.
Controversy followed the awarding of so many assets to Reid, and in 1901 the contracts were modified to place everything under a limited liability corporation, named the Reid Newfoundland Company.
Reid's railway development in the colony began to attract attention to the potential of the island's natural resources. In 1903, the Reids partnered with a St. John's businessman, Harry J. Crowe, to purchase timber rights in Botwood, Norris Arm, Gambo, Gander Bay, and Point Leamington. In 1904, British investors named Harmsworth declared their intention to build a pulp and paper mill in Grand Falls and on January 7, 1905, the Anglo Newfoundland Development Company was formed, based on a partnership between the Harmsworths, Reid and the colonial government. Botwood was expanded through the construction of deepwater wharves and warehouses for shipping the finished pulp. To link the two, AND built the narrow gauge Botwood Railway beginning in 1908 and completing it in 1909. It would later be renamed the Grand Falls Central Railway.
Reid died in 1908 but his company set the pace for development in Newfoundland's interior mining and forestry industries, although the entire operation continued to suffer losses. In 1909 and into the 1910s, the colonial government contracted for additional branch lines to be built. Some of the major works included:
- a line to Bonavista
- a line to Trepassey
- extend the Harbour Grace line through Carbonear to Bay de Verde
- several smaller branches, some of which were graded but rails were never installed
Nationalization
The railway was initially called the Newfoundland Government Railway but was soon shortened to the Newfoundland Railway in 1926. It remained the property of the dominion government until Confederation on April 1, 1949, when it was transferred to the federal government's Canadian National Railway.
In 1925, the American Smelting and Refining Company perfected a method for recovering individual metals in ore and entered into partnership with AND to develop a mine at Buchans, which was connected to the Newfoundland Railway by the Millertown Railway, also a narrow gauge.
Wartime
Although the railway saw an increase in traffic during the First World War, it was extensive military-related construction in the late 1930s and early 1940s which proved the worth of the Newfoundland Railway as a strategic asset. An air force base was developed adjacent to the main line in Gander, and major American military bases were constructed in Stephenville, Argentia and St. John's, in addition to Canadian and British defence facilities in St. John's. Given the lack of roads and all-weather highways in Newfoundland during the 1940s, and the U-boat threat in the waters off-shore, the Newfoundland Railway became a vital, yet very obscure, supply link in the defence of the North Atlantic and the allied convoy system.The Second World War also saw the Newfoundland Railway experience its most tragic loss, when the ferry Caribou was torpedoed and sunk off Port aux Basques by the on October 14, 1942. 137 passengers lost their lives and 104 people survived the sinking. In honour of the lost passengers and crew, the Newfoundland Railway Employees Association had the entire workforce forego a day's wages as a donation to a public campaign to build a memorial near the Port aux Basques railway terminal.
Canadian National
Newfoundland became the 10th province of Canada on March 31, 1949, and the Newfoundland Railway's assets were transferred to the control of the federal Crown corporation Canadian National Railway. CN became a major presence in Newfoundland's early years as a province, controlling the railway, dry dock services, many ferries and coastal boats, and the telegraph system.The Newfoundland Railway's premiere cross-island passenger train, The Overland Limited was renamed the Caribou by CN, although it was known colloquially as The Newfie Bullet. CN maintained the Caribou until 1969.
CN made major capital improvements, upgrading the main line, bridges, and rolling stock, and replacing steam locomotives with diesel units. Additional improvements were made to the ferry service, with new vessels and an expanded terminal at Port aux Basques. An additional indirect service improvement to the Newfoundland railway operations was made in 1955, with the opening of the Canso Causeway, linking Cape Breton Island with mainland North America and removing the need to ferry railcars destined for Newfoundland across the Strait of Canso.
CN's Newfoundland operations continued to see significant traffic increases with its improved ferry and rail connections, but faced increased truck and bus competition on completion of the Trans-Canada Highway across the island in 1965. New railcar-capable ferries were introduced; mainland standard-gauge railcars were ferried to Newfoundland, where their standard-gauge bogies were replaced with narrow-gauge bogies in Port aux Basques. This innovation was unsuccessful. The first casualty was the passenger rail service, which was abandoned in 1969 in favour of buses. CN began to demarket its own Newfoundland rail operations through the 1970s and began to rely on trucks for hauling cargo.
In 1979, CN reorganized its narrow-gauge system into Terra Transport, as a means to separate the subsidy-dependent Newfoundland rail operations from its mainland North America core freight rail system. Rail cargo traffic continued to decline, and all branch lines on the island were closed in 1984. In 1987, Canada deregulated its railway industry, allowing abandonments to proceed with less red tape. The former CN subsidiary CN Marine was reorganized into Marine Atlantic in 1986 and one of the two railcar ferries was sold off, leaving the narrow-gauge system with limited interchange ability at Port aux Basques in its final two years. In December 1987 the provincial and federal governments signed a deal worth $800 million for highway improvements, removing the provincial government's opposition to the pending abandonment of the railway.
The railway was officially abandoned on October 1, 1988. Following abandonment, work trains continued to operate, assisting salvage crews to remove the rails from remote locations, particularly in the Gaff Topsails between the Exploits River and Deer Lake, Newfoundland and Labrador. The last train, prior to work trains removing rails, arrived from Port Aux Basques and departed Corner Brook eastbound on September 30 and arrived at Bishops Falls on the morning of October 1, 1988.
CN continued to operate its Roadcruiser Bus service and a CN Intermodal trucking operation in Newfoundland until 1996. With CN's privatization in late 1995, the company divested itself of all money-losing and most non-railroad interests, including CN Roadcruiser. Cross-island bus service was taken over by DRL Coachlines of Triton, Newfoundland on March 30, 1996. The CN Newfoundland trucking operation continued until Fall 1996, and was then contracted to Clarke Transport.
Legacy
The former Newfoundland Railway station in St. John's now hosts the Railway Coastal Museum. Numerous towns across the island have preserved railway equipment on display.With few exceptions, the roadbed now forms the T'Railway Provincial Park rail trail. Until 2005, the Trinity Loop Amusement Park operated a miniature train, one of the few remaining places on Newfoundland with tracks still in place. The park closed down and was abandoned in 2005 due to lack of interest. Since then, all of the buildings have been heavily vandalized and Hurricane Igor washed away part of the park, including a large section of the rail bed. Local railway fans have been pushing government to retain the park as an historic site but officials have expressed little interest.
Some rolling stock was converted to a narrower gauge of and sold to the White Pass & Yukon Route railway, which reopened for service in 1988. Gravel cars used by WP&YR are still painted in CN orange; unconfirmed information indicates that some Newfoundland passenger cars were converted into passenger cars of vintage appearance for WP&YR.
The province of Newfoundland and Labrador still has railway transportation, although it is not provided on Newfoundland. The Quebec, North Shore & Labrador Railway operates between Sept-Îles, QC and the mining region of Labrador West. A former QNSL line, now owned and operated by Tshiuetin Rail Transportation, serves the former mining town of Schefferville, QC, passing through Labrador. QNSL also connects with Newfoundland and Labrador's other active railway, the Wabush Lake Railway.
Locomotives
Number | Builder | Type | Date | Works number | Notes |
1 | Hawthorn Leslie and Company | 0-6-0T | 1881 | 1884 | former Harbour Grace Railway #1 – sold 1898 to Botwood Railway |
2–6 | Hunslet Engine Company | 4-4-0T | 1872 | 85–89 | former Harbour Grace Railway # 2–6 purchased from Prince Edward Island Railway in 1881 – scrapped 1889–1893 |
8–9 | Baldwin Locomotive Works | 2-4-2T | 7/1893 | 13566–13567 | former Newfoundland Northern and Western Railway # 8–9 – scrapped 1925 & 1934 |
10 | Baldwin Locomotive Works | 0-4-2T | 3/1894 | 13968 | former Newfoundland Northern and Western Railway # 10 – sold after 1900 |
20–22 | Hawthorn Leslie and Company | 2-6-0 | 1882 | 1885–1887 | former Harbour Grace Railway # 7–9 – scrapped |
23 | Hawthorn Leslie and Company | 2-6-2 | 1888 | 2061 | former Harbour Grace Railway # 10 – scrapped |
40 | Baldwin Locomotive Works | 4-4-0 | 6/1893 | 13518 | former Newfoundland Northern and Western Railway # 7 – scrapped |
41 | Baldwin Locomotive Works | 4-4-0 | 5/1891 | 11851 | former Newfoundland Northern and Western Railway # 3 – scrapped |
42 | Baldwin Locomotive Works | 4-4-0 | 7/1891 | 12100 | former Newfoundland Northern and Western Railway # 5 – scrapped |
43 | Baldwin Locomotive Works | 4-4-0 | 1889 | 10135 | former Newfoundland Northern and Western Railway # 2 – sold 1918 to Botwood Railway |
60 | Baldwin Locomotive Works | 2-6-0 | 5/1891 | 11859 | former Newfoundland Northern and Western Railway # 4 – scrapped |
61 | Baldwin Locomotive Works | 2-6-0 | 6/1893 | 13519 | former Newfoundland Northern and Western Railway # 6 – scrapped |
63 | Baldwin Locomotive Works | 2-6-0 | 3/1894 | 13976 | former Newfoundland Northern and Western Railway # 11 – scrapped |
100 | Baldwin Locomotive Works | 4-6-0 | 10/1898 | 16244 | Renumbered # 1 in 1925 and assigned as the Saint Johns shunter until scrapped 6/1939 |
101 | Baldwin Locomotive Works | 4-6-0 | 10/1898 | 16245 | Scrapped |
102 | Baldwin Locomotive Works | 4-6-0 | 4/1897 | 15309 | former Newfoundland Northern and Western Railway # 13 – scrapped |
103 | Baldwin Locomotive Works | 4-6-0 | 10/1898 | 16271 | Scrapped |
104 | Baldwin Locomotive Works | 4-6-0 | 10/1898 | 16272 | Scrapped |
105 | Baldwin Locomotive Works | 4-6-0 | 4/1897 | 15308 | former Newfoundland Northern and Western Railway # 12 – scrapped |
106 | Baldwin Locomotive Works | 4-6-0 | 2/1900 | 17511 | Scrapped |
107 | Baldwin Locomotive Works | 4-6-0 | 6/1900 | 17832 | Scrapped 1939 |
108 | Baldwin Locomotive Works | 4-6-0 | 6/1900 | 17837 | Scrapped |
109–110 | Baldwin Locomotive Works | 4-6-0 | 1/1908 | 32576–32577 | Scrapped 1939 |
111–112 | Reid-Newfoundland Company Shops | 4-6-0 | 1911 | 1–2 | Scrapped |
113–114 | Reid-Newfoundland Company Shops | 4-6-0 | 1912 | 3–4 | Renumbered CNR class F-3-a # 15–16 – scrapped 12/1951 |
115–116 | Reid-Newfoundland Company Shops | 4-6-0 | 1913 | 5–6 | Scrapped 1938 |
117 | Reid-Newfoundland Company Shops | 4-6-0 | 1914 | 7 | Renumbered CNR class F-3-a # 17 – scrapped 7/1953 |
118 | Reid-Newfoundland Company Shops | 4-6-0 | 1914 | 8 | Scrapped 1938 |
119–120 | Reid-Newfoundland Company Shops | 4-6-0 | 1915 | 9–10 | Scrapped |
121 | Baldwin Locomotive Works | 4-6-0 | 10/1917 | 46636 | Scrapped 1938 |
122 | Baldwin Locomotive Works | 4-6-0 | 10/1917 | 46637 | Renumbered CNR class F-3-a # 18 – scrapped 7/1953 |
123 | Baldwin Locomotive Works | 4-6-0 | 10/1917 | 46638 | Scrapped 1939 |
124 | Baldwin Locomotive Works | 4-6-0 | 10/1917 | 46691 | Scrapped |
125 | Baldwin Locomotive Works | 4-6-0 | 2/1900 | 17510 | Scrapped 1939 |
150 | Baldwin Locomotive Works | 2-8-0 | 2/1903 | 21597 | Scrapped 1934 |
151 | Baldwin Locomotive Works | 2-8-0 | 2/1903 | 21598 | Scrapped |
152 | Reid-Newfoundland Company Shops | 2-8-0 | 1916 | 11 | Renumbered CNR class L-5-a # 280 – scrapped 4/1955 |
153 | Reid-Newfoundland Company Shops | 2-8-0 | 1916 | 12 | Scrapped |
190–195 | Baldwin Locomotive Works | 4-6-2 | 1920 | 54398–54401 & 54466–54467 | Renumbered CNR class J-8-a # 590–595 – # 593 preserved and remainder scrapped 1957–1958 |
196 | Baldwin Locomotive Works | 4-6-2 | 1926 | 59531 | Renumbered CNR class J-8-b # 596 – scrapped 3/1957 |
197 | Montreal Locomotive Works | 4-6-2 | 1926 | 67129 | Renumbered CNR class J-8-b # 597 – scrapped 4/1957 |
198–199 | American Locomotive Company | 4-6-2 | 1929 | 67941–67942 | Renumbered CNR class J-8-c # 598–599 – sold 3/1957 to Botwood Railway |
1000–1001 | American Locomotive Company | 2-8-2 | 1930 | 68400–68401 | Renumbered CNR class R-2-a # 300–301 – scrapped 1957 |
1002–1003 | North British Locomotive Company | 2-8-2 | 1935 | 24297–24298 | Renumbered CNR class R-2-b # 302–303 – scrapped 1957 |
1004 | North British Locomotive Company | 2-8-2 | 1937 | 24436 | Renumbered CNR class R-2-b # 304 – scrapped 3/1957 |
1005–1006 | North British Locomotive Company | 2-8-2 | 1938 | 24521–24522 | Renumbered CNR class R-2-b # 305–306 – scrapped 1957 |
1007 | Montreal Locomotive Works | 2-8-2 | 1941 | 24667 | Renumbered CNR class R-2-c # 308 Only this unit and 1008 did not keep their same last digits when renumbered by CN into the 300 series. Possibly done to keep MLW/ALCo units in one class and North British built units in another class – scrapped 5/1957 |
1008 | North British Locomotive Company | 2-8-2 | 1941 | 69444 | Renumbered CNR class R-2-b # 307 Only this unit and 1007 did not keep their same last digits when renumbered by CN into the 300 series. Possibly done to keep MLW/ALCo units in one class and North British built units in another class – sold 4/1957 to Botwood Railway |
1009–1013 | American Locomotive Company | 2-8-2 | 1941 | 69736 | Renumbered CNR class R-2-c # 309–313 – scrapped 1957 |
1014–1015 | Montreal Locomotive Works | 2-8-2 | 1941 | 69695–69696 | Renumbered CNR class R-2-c # 314–315 – scrapped 1957 |
1016–1019 | American Locomotive Company | 2-8-2 | 1944 | 71963–71966 | Renumbered CNR class R-2-c # 316–319 – scrapped 1957 |
1020–1023 | Montreal Locomotive Works | 2-8-2 | 1947 | 75635–75638 | Renumbered CNR class R-2-d # 320–323 – scrapped 1957 |
1024 | Montreal Locomotive Works | 2-8-2 | 1949 | 76333 | Renumbered CNR class R-2-d # 324 – scrapped 8/1957 |
1025–1029 | Montreal Locomotive Works | 2-8-2 | 1949 | 76424–76428 | Renumbered CNR class R-2-d # 325–329 – # 327 sold to Botwood Railway and remainder scrapped in 1957 |
5000–5002 | General Electric | B+B | 1948 | 29722–29724 | Narrow gauge version of GE 44-ton switcher. Renumbered CNR class ES-4-a # 775–777 – sold 1968 to Northern Railway of Costa Rica |
800–805 | General Motors Diesel | A1A-A1A | 1956 | A923–A928 | GMD G8. CNR class GR-9-b |
900–902 | General Motors Diesel | C-C | 1952 | A303–305 | GMD NF110. CNR class Y-4-a then GR-12-a |
903–908 | General Motors Diesel | C-C | 1953 | A435–A440 | GMD NF110. CNR class Y-4-b then GR-12-b |
909–934 | General Motors Diesel | C-C | 1956 | A897–A922 | GMD NF210. CNR class GR-12-g
|
935–937 | General Motors Diesel | C-C | 1958 | A1450–A1452 | GMD NF210. CNR class GR-12-p |
938–946 | General Motors Diesel | C-C | 1960 | A1834–A1842 | GMD NF210. CNR class GR-12-xall sold to FCP and passed 1994 to FCAB, Chile |