On 17 June 1914 the large navigation between Berlin and Stettin was opened. Near Niederfinow the difference in elevation was overcome using a staircase lock with four chambers. One can still visit the remains of these locks today. The capacity of the staircase locks was quickly exceeded, therefore, between 1927 and 1934, the boat lift was built and inaugurated on 21 March 1934. The lift is 60 m high, the length 94 m, taking five minutes for the trough to move through the 36m elevation difference. The following enterprises were involved: By 26 January 1939 100,000 boats had already passed through the lift. In the inaugural year there was 2,832,000 tonnes of traffic. The lift was the subject of a general overhaul in 1980 and the lifting cables were renewed in 1984/85. Today the boat lift is too short for some barge trains which must be separated to pass the lift. The lift is running near to its capacity with about 11,000 boats passing through each year, so in 1997 the decision was made to build a new, bigger lift. The Niederfinow lift is a popular tourist destination with about 500,000 visitors per year. Due to this a new larger car park was opened in 2003.
Technology
The boat lift consists of 14,000 Tonnes of riveted structural steelwork standing on steel columns. The Oder-Havel-Kanal approaches the head of the lift on a 4,000 Tonne riveted steelwork aqueduct. The trough when filled weighs 4,290 tonnes and hangs on 256 steel cables, these cross over guide rollers and support 192 counterweights which balance the trough. The security of the lift is maintained by keeping half the cables in tension and the other half relaxed in reserve. The guide rollers have a diameter of 3.5m. Pin gearing with D.C.motors in Leonards electric motor speed controllers, connected together by a shaft allow a symmetrical drive. This arrangement allows the exact synchronisation of the four pin gears. The four Leonard controllers each have an output of 55 kilowatts totalling 220 kilowatts. Four worm geared shafts are driven which intersect with internal threads built into the troughs. These move freely under normal circumstances but would seize if a cable broke providing extra safety.
Planning for the new boat lift
Because of the continuing increase in traffic on the Oder-Havel-Kanal, in 1997 it was decided that a new, bigger lift should be built next to the present one In the autumn of 2006 earthworks began between the lift and the old staircase locks. The new lift, which is being built by Bilfinger Berger and the site is being developed in partnership with Johann Bunte, is due to be finished in 2021. The trough will be long and wide and will weigh —and some when filled with water. The cost will be 285 million euros. The old lift will remain in use however until at least 2025.