North American XB-70 Valkyrie


The North American Aviation XB-70 Valkyrie was the prototype version of the planned B-70 nuclear-armed, deep-penetration strategic bomber for the United States Air Force Strategic Air Command. Designed in the late 1950s by North American Aviation, the six-engined Valkyrie was capable of cruising for thousands of miles at Mach 3+ while flying at.
At these speeds, it was expected that the B-70 would be practically immune to interceptor aircraft, the only effective weapon against bomber aircraft at the time. The bomber would spend only a brief time over a particular radar station, flying out of its range before the controllers could position their fighters in a suitable location for an interception. High speed also made the aircraft difficult to see on radar displays and its high-altitude and high-speed capacity could not be matched by any contemporary Soviet interceptor or fighter aircraft.
The introduction of the first Soviet surface-to-air missiles in the late 1950s put the near-invulnerability of the B-70 in doubt. In response, the United States Air Force began flying its missions at low level, where the missile radar's line of sight was limited by terrain. In this low-level penetration role, the B-70 offered little additional performance over the B-52 it was meant to replace, while being far more expensive with shorter range. Other alternate missions were proposed, but these were of limited scope. With the advent of intercontinental ballistic missiles during the late 1950s, manned bombers were increasingly seen as obsolete.
The USAF eventually gave up fighting for its production and the B-70 program was canceled in 1961. Development was then turned over to a research program to study the effects of long-duration high-speed flight. As such, two prototype aircraft, designated XB-70A, were built; these aircraft were used for supersonic test-flights during 1964–69. In 1966, one prototype crashed after colliding with a smaller aircraft while flying in close formation; the remaining Valkyrie bomber is in the National Museum of the United States Air Force near Dayton, Ohio.

Development

Background

In an offshoot of Boeing's MX-2145 manned boost-glide bomber project, Boeing partnered with RAND Corporation in January 1954 to explore what sort of bomber aircraft would be needed to deliver the various contemporary nuclear weapons under development. At the time, nuclear weapons weighed several tons, and the need to carry enough fuel to fly that payload from the continental United States to the Soviet Union demanded large bombers. They also concluded that after the release of the bombs, the aircraft would need supersonic speed to escape the critical blast-radius.
The aviation industry had been studying this problem for some time. From the mid-1940s, there was interest in using nuclear-powered aircraft in the bomber role. In a conventional jet engine, thrust is provided by heating air using jet fuel and accelerating it out a nozzle. In a nuclear engine, heat is supplied by a reactor, whose consumables last for months instead of hours. Most designs also carried a small amount of jet fuel for use during high-power portions of flight, such as takeoffs and high-speed dashes.
Another possibility being explored at the time was the use of boron-enriched "zip fuels", which improve the energy density of jet fuel by about 40 percent, and could be used in modified versions of existing jet engine designs. Zip fuels appeared to offer sufficient performance improvement to produce a strategic bomber with supersonic speed.

WS-110A

The U.S. Air Force followed these developments closely, and in 1955 issued General Operational Requirement No. 38 for a new bomber, combining the payload and intercontinental range of the B-52 with the Mach 2 top speed of the Convair B-58 Hustler. The new bomber was expected to enter service in 1963. Both nuclear and conventional designs were considered. The nuclear-powered bomber was organized as "Weapon System 125A" and pursued simultaneously with the jet-powered version, "Weapon System 110A".
The USAF Air Research and Development Command's requirement for WS-110A asked for a chemical-fuel bomber with Mach 0.9 cruising speed and "maximum possible" speed during a entrance and exit from the target. The requirement also called for a payload and a combat radius of. The Air Force formed similar requirements for a WS-110L intercontinental reconnaissance system in 1955, but this was later canceled in 1958 due to better options. In July 1955, six contractors were selected to bid on WS-110A studies. Boeing and North American Aviation submitted proposals, and on 8 November 1955 were awarded contracts for Phase 1 development.
In mid-1956, initial designs were presented by the two companies. Zip fuel was to be used in the afterburners to improve range by 10 to 15 percent over conventional fuel. Both designs featured huge wing-tip fuel tanks that could be jettisoned when their fuel was depleted before a supersonic dash to the target. The tanks also included the outer portions of the wing, which would also be jettisoned to produce a smaller wing suitable for supersonic speeds. Both became trapezoidal wings after ejection, at that time the highest performance planform known. They also featured flush cockpits to maintain the highest fineness ratio possible in spite of its effects on visibility.
The two designs had takeoff weights of approximately with large fuel loads. The Air Force evaluated the designs, and in September 1956 deemed them too large and complicated for operations. General Curtis LeMay was dismissive, declaiming, "This is not an airplane, it's a three-ship formation." The USAF ended Phase 1 development in October 1956 and instructed the two contractors to continue design studies.

New designs

During the period that the original proposals were being studied, advances in supersonic flight were proceeding rapidly. The narrow delta was establishing itself as a preferred planform for supersonic flight, replacing earlier designs like the swept-wing and trapezoidal layouts seen on designs like the Lockheed F-104 Starfighter and the earlier WS-110 concepts. Engines able to cope with higher temperatures and widely varying intake ramp air speeds were also under development, allowing for sustained supersonic speeds.
This work led to an interesting discovery: when an engine was optimized specifically for high speed, it burned perhaps twice as much fuel at that speed than when it was running at subsonic speeds. However, the aircraft would be flying as much as four times as fast. Thus its most economical cruise speed, in terms of fuel per mile, was its maximum speed. This was entirely unexpected and implied that there was no point in the dash concept; if the aircraft was able to reach Mach 3, it may as well fly its entire mission at that speed. The question remained whether such a concept was technically feasible, but by March 1957, engine development and wind tunnel testing had progressed enough to suggest that it was.
WS-110 was redesigned to fly at Mach 3 for the entire mission. Zip fuel was retained for the engine's afterburner to increase range. Both North American and Boeing returned new designs with very long fuselages and large delta wings. They differed primarily in engine layout; the NAA design arranged its six engines in a semi-circular duct under the rear fuselage, while the Boeing design used separate podded engines located individually on pylons below the wing, like the Hustler.
North American scoured available literature to find any additional advantage. This led them to an obscure report by two NACA wind tunnel experts, who wrote a report in 1956 titled "Aircraft Configurations Developing High Lift-Drag Ratios at High Supersonic Speeds". Known today as compression lift, the idea was to use the shock wave generated off the nose or other sharp points on the aircraft as a source of high-pressure air. By carefully positioning the wing in relation to the shock, the shock's high pressure could be captured on the bottom of the wing and generate additional lift. To take maximum advantage of this effect, they redesigned the underside of the aircraft to feature a large triangular intake area far forward of the engines, better positioning the shock in relation to the wing. The formerly individually-podded engines were repositioned in a single large duct under the fuselage.
North American improved on the basic concept by adding a set of drooping wing-tip panels that were lowered at high speed. This helped trap the shock wave under the wing between the downturned wing tips. It also added more vertical surface to the aircraft to maintain directional stability at high speeds. NAA's solution had an additional advantage, as it decreased the surface area of the rear of the wing when the panels were moved into their high-speed position. This helped offset the natural rearward shift of the center of pressure, or "average lift point", with increasing speeds. Under normal conditions this caused an increasing nose-down trim, which had to be offset by moving the control surfaces, increasing drag. When the wing tips were drooped, the surface area at the rear of the wings was lessened, moving the lift forward and reducing trim drag.
The buildup of heat due to skin friction during sustained supersonic flight had to be addressed. During a Mach 3 cruise, the aircraft would reach an average of, with leading edges reaching, and up to in engine compartments. NAA proposed building their design out of sandwich panels, with each panel consisting of two thin sheets of stainless steel brazed to opposite faces of a honeycomb-shaped foil core. Expensive titanium would be used only in high-temperature areas like the leading edge of the horizontal stabilizer, and the nose. For cooling the interior, the XB-70 pumped fuel en route to the engines through heat exchangers.
On 30 August 1957, the Air Force decided that enough data were available on the NAA and Boeing designs that a competition could begin. On 18 September, the Air Force issued operational requirements that called for a cruising speed of Mach 3.0 to 3.2, an over-target altitude of, a range of up to, and a gross weight not to exceed. The aircraft would have to use the hangars, runways and handling procedures used by the B-52. On 23 December 1957, the North American proposal was declared the winner of the competition, and on 24 January 1958, a contract was issued for Phase 1 development.
In February 1958, the proposed bomber was designated B-70, with the prototypes receiving the "X" experimental prototype designation. The name "Valkyrie" was the winning submission in early 1958, selected from 20,000 entries in a USAF "Name the B-70" contest. The Air Force approved an 18-month program acceleration in March 1958 that rescheduled the first flight to December 1961. But in late 1958 the service announced that this acceleration would not be possible due to lack of funding. In December 1958, a Phase II contract was issued. The mockup of the B-70 was reviewed by the Air Force in March 1959. Provisions for air-to-surface missiles and external fuel tanks were requested afterward. At the same time, North American was developing the F-108 supersonic interceptor. To reduce program costs, the F-108 would share two of the engines, the escape capsule, and some smaller systems with the B-70. In early 1960, North American and the USAF released the first drawing of the XB-70 to the public.

The "missile problem"

The B-70 was planned to use a high-speed, high-altitude bombing approach that followed a trend of bombers flying progressively faster and higher since the start of manned bomber use. Through that same period, only two weapons proved effective against bombers: fighter aircraft and anti-aircraft artillery. Flying higher and faster made it more difficult for both; higher speeds allowed the bomber to fly out of range of the weapons more quickly, while higher altitudes increased the time needed for fighters to climb to the bombers, and greatly increased the size of the AAA weapons needed to reach those altitudes.
As early as 1942, German flak commanders had already concluded that AAA would be essentially useless against jet aircraft, and began development of guided missiles to fill this role. Most forces reached the same conclusion soon after, with both the US and UK starting missile development programs before the war ended. The UK's Green Mace was one of the last attempts to develop a useful high-altitude AAA weapon, but its development ended in 1957.
Interceptor aircraft with ever-improving performance remained the only effective anti-bomber weapons by the early 1950s, and even these were having problems keeping up with the latest designs; Soviet interceptors during the late 1950s could not intercept the high-altitude U-2 reconnaissance aircraft, despite its relatively low speeds. It was later discovered that flying faster also made radar detection much more difficult due to an effect known as the blip-to-scan ratio, and any reduction in tracking efficiency would further interfere with the operation and guidance of fighters.
The introduction of the first effective anti-aircraft missiles by the late 1950s changed this picture dramatically. Missiles could stand ready for immediate launch, eliminating operational delays like the time needed to get the pilot into the cockpit of a fighter. Guidance did not require wide-area tracking or calculation of an intercept course: a simple comparison of the time needed to fly to the altitude of the target returned the required deflection. Missiles also had greater altitude capability than any aircraft and improving this to adapt to new aircraft was a low-cost development path. The US was aware of Soviet work in the field, and had reduced the expected operational lifetime of the U-2, knowing that it would become vulnerable to these missiles as they were improved. In 1960, a U-2 flown by Gary Powers was shot down by one of the earliest Soviet missile designs, the S-75 Dvina, known in the west as the SA-2 Guideline.
Faced with this problem, military doctrine had already started shifting away from high-altitude supersonic bombing toward low-altitude penetration. Radar is line-of-sight, so aircraft could dramatically shorten detection distances by flying close to the Earth and hiding behind terrain. Missile sites spaced to overlap in range when attacking bombers at high altitudes would leave large gaps between their coverage for bombers flying at lower levels. With an appropriate map of the missile sites, the bombers could fly between and around the defences. Additionally, early missiles generally flew unguided for a period of time before the radar systems were able to track the missile and start sending it guidance signals. With the SA-2 missile, this minimum altitude was roughly. Flying below this would make the bomber effectively invulnerable to the missiles, even if they happened to fly into range.
Flying at low level provided protection against fighters as well. Radars of the era did not have the ability to look down ; if a higher altitude aircraft's radar was aimed down to detect targets at a lower altitude, the reflection of the ground would overwhelm the signal returned from a target. An interceptor flying at normal altitudes would be effectively blind to bombers far below it. The interceptor could descend to lower altitudes to increase the amount of visible sky, but doing so would limit its radar range in the same way as the missile sites, as well as greatly increasing fuel use and thus reducing mission time. The Soviet Union would not introduce an interceptor with look-down capability until 1972 with the High Lark radar in the MiG-23M, and even this model had very limited capability.
Strategic Air Command found itself in an uncomfortable position; bombers had been tuned for efficiency at high speeds and altitudes, performance that had been purchased at great cost in both engineering and financial terms. Before the B-70 was to replace the B-52 in the long-range role, SAC had introduced the B-58 Hustler to replace the Boeing B-47 Stratojet in the medium-range role. The Hustler was expensive to develop and purchase, and required enormous amounts of fuel and maintenance in comparison to the B-47. It was estimated that it cost three times as much to operate as the much larger and longer-ranged B-52.
The B-70, designed for even higher speeds, altitudes and range than the B-58, suffered even more in relative terms. At high altitudes, the B-70 was as much as four times as fast as the B-52, but at low altitudes it was limited to only Mach 0.95, only modestly faster than the B-52 at the same altitudes. It also had a smaller bombload and shorter range. Its only major advantage would be its ability to use high speed in areas without missile cover, especially on the long journey from the US to USSR. The value was limited; the USAF's doctrine stressed that the primary reason for maintaining the bomber force in an era of ICBMs was that the bombers could remain in the air at long ranges from their bases and were thus immune to sneak attack. In this case, the higher speed would be used for only a short period of time between the staging areas and the Soviet coastline.
Adding to the problems, the zip fuel program was canceled in 1959. After burning, the fuel turned into liquids and solids that increased wear on moving turbine engine components. Although the B-70 was intended to use zip only in the afterburners, and thus avoid this problem, the enormous cost of the zip program for such limited gains led to its cancellation. This by itself was not a fatal problem, however, as newly developed high-energy fuels like JP-6 were available to make up some of the difference. Most of the range lost in the change from zip fuel was restored by filling one of the two bomb bays with a fuel tank. However, another problem arose when the F-108 program was canceled in September 1959, which ended the shared development that benefited the B-70 program.

Downsizing, upswing, cancellation

At two secret meetings on 16 and 18 November 1959, the Chairman of the Joint Chiefs of Staff, Air Force General Twining, recommended the Air Force's plan for the B-70 to reconnoiter and strike rail-mobile Soviet ICBMs, but the Chief of Staff of the Air Force, General White, admitted the Soviets would "be able to hit the B-70 with rockets" and requested the B-70 be downgraded to "a bare minimum research and development program" at $200 million for fiscal year 1960. President Eisenhower responded that the reconnaissance and strike mission was "crazy" since the nuclear mission was to attack known production and military complexes, and emphasized that he saw no need for the B-70 since the ICBM is "a cheaper, more effective way of doing the same thing". Eisenhower also identified that the B-70 would not be in manufacturing until "eight to ten years from now" and "said he thought we were talking about bows and arrows at a time of gunpowder when we spoke of bombers in the missile age". In December 1959 the Air Force announced the B-70 project would be cut to a single prototype, and most of the planned B-70 subsystems would no longer be developed.
Then interest increased due to the politics of presidential campaign of 1960. A central plank of John F. Kennedy's campaign was that Eisenhower and the Republicans were weak on defense, and pointed to the B-70 as an example. He told a San Diego audience near NAA facilities, "I endorse wholeheartedly the B-70 manned aircraft." Kennedy also made similar campaign claims regarding other aircraft: near the Seattle Boeing plant he affirmed the need for B-52s and in Fort Worth he praised the B-58.
The Air Force changed the program to full weapon development and awarded a contract for an XB-70 prototype and 11 YB-70s in August 1960. In November 1960, the B-70 program received a $265 million appropriation from Congress for FY 1961. Nixon, trailing in his home state of California, also publicly endorsed the B-70, and on 30 October Eisenhower helped the Republican campaign with a pledge of an additional $155 million for the B-70 development program.
On taking office in January 1961, Kennedy was informed that the missile gap was an illusion. On 28 March 1961, after $800 million had been spent on the B-70 program, Kennedy canceled the project as "unnecessary and economically unjustifiable" because it "stood little chance of penetrating enemy defenses successfully." Instead, Kennedy recommended "the B-70 program be carried forward essentially to explore the problem of flying at three times the speed of sound with an airframe potentially useful as a bomber." After Congress approved $290 million of B-70 "add-on" funds to the President's 12 May 1960 modified FY 1961 budget, the Administration decided on a "Planned Usage" of only $100 million of these funds. The Department of Defense subsequently presented data to Congress that the B-70 would add little performance for the high cost.
However, after becoming the new Air Force Chief of Staff in July 1961, Curtis LeMay increased his B-70 advocacy, including interviews for August Reader's Digest and November Aviation Week articles, and allowing a 25 February General Electric tour at which the press was provided artist conceptions of, and other info about, the B-70. Congress had also continued B-70 appropriations in an effort to resurrect bomber development. After Secretary of Defense Robert McNamara explained again to the House Armed Services Committee on 24 January 1962 that the B-70 was unjustifiable, LeMay subsequently argued for the B-70 to both the House and Senate committees—and was chastised by McNamara on 1 March. By 7 March 1962, the HASC—with 21 members having B-70 work in their districts—had written an appropriations bill to "direct"—by law—the Executive Branch to use all of the nearly $500 million appropriated for the RS-70. McNamara was unsuccessful with an address to the HASC on 14 March, but a 19 March 1962 White House Rose Garden agreement between Kennedy and HASC chairman Carl Vinson retracted the bill's language and the bomber remained canceled.

Experimental aircraft

The XB-70s were intended to be used for the advanced study of aerodynamics, propulsion, and other subjects related to large supersonic transports. The crew was reduced to only the two pilots, as a navigator and a bombardier were not needed for this research role. The production order was reduced to three prototypes in March 1961 with the third aircraft to incorporate improvements from the previous prototype. The order was later reduced to two experimental XB-70As, named Air Vehicle 1 and 2. XB-70 No. 1 was completed on 7May 1964, and rolled out on 11May 1964 at Palmdale, California. One report stated "nothing like it existed anywhere". AV-2 was completed on 15 October 1964. The manufacture of the third prototype was canceled in July 1964 before completion. The first XB-70 carried out its maiden flight in September 1964 and many more test flights followed.
The data from the XB-70 test flights and aerospace materials development were used in the later B-1 bomber program, the American supersonic transport program, and via espionage, the Soviet Union's Tupolev Tu-144 SST program. The development of the Lockheed U-2 and the SR-71 Blackbird reconnaissance aircraft, as well as the XB-70, prompted Soviet aerospace engineers to design and develop their high-altitude and high-speed MiG-25 interceptor.

Design

The Valkyrie was designed to be a high-altitude Mach 3 bomber with six engines. Harrison Storms shaped the aircraft with a canard surface and a delta wing, which was built largely of stainless steel, sandwiched honeycomb panels, and titanium. The XB-70 was designed to use supersonic technologies developed for the Mach 3 SM-64 Navaho, as well as a modified form of the Navaho's inertial guidance system.
The XB-70 used compression lift, which arose from a shock wave generated by the sharp leading edge of the central engine intake splitter plate below the wing. At Mach 3 cruising speed, the shock wave attached along the wing leading edge, preventing the high pressure behind the shock front from leaking up over the wing. The compression lift provided five percent of the total lift. The wing included inboard camber to more effectively use the higher pressure field behind the strong shock wave. Unique among aircraft of its size, the outer portions of the wings were hinged, and could be pivoted downward by up to 65 degrees, acting almost as a type of variable-geometry wingtip device. This increased the aircraft's directional stability at supersonic speeds, shifted the center of lift to a more favorable position at high speeds, and strengthened the compression lift effect. With the wingtips drooped downwards, the compression lift shock wave would be further trapped under the wings.
Like a number of other delta-wing aircraft designed to cruise at very high speeds, the Valkyrie included a streamlined visor which could be lowered for the pilots to see the ground during the nose-high takeoff and landing. In the B-70 design, the visor moved down into the main nose, and the outer window panels moved with it to become more vertical, at 24 degrees slope. With the nose raised into its high-speed position, the outer windows were almost horizontal. A system that blew air from the engines was used for both defogging and rain removal. The lower forward section included a radar bay, and production machines were to be equipped with a refueling receptacle on the upper surface of the nose.
The XB-70 was equipped with six General Electric YJ93-GE-3 turbojet engines, designed to use JP-6 jet fuel. The engine was stated to be in the "30,000-pound class", but actually produced with afterburner and without afterburner. The Valkyrie used fuel for cooling; it was pumped through heat exchangers before reaching the engines. To reduce the likelihood of autoignition, nitrogen was injected into the JP-6 during refueling, and the "fuel pressurization and inerting system" vaporized a supply of liquid nitrogen to fill the fuel tank vent space and maintain tank pressure.

Operational history

The XB-70's maiden flight was on 21 September 1964. In the first flight test, between Palmdale and Edwards AFB, one engine had to be shut down shortly after take-off, and an undercarriage malfunction warning meant that the flight was flown with the undercarriage down as a precaution, limiting speed to 390 mph – about half that planned. During landing, the rear wheels of the port side main gear locked, the tires ruptured, and a fire started.
The Valkyrie first became supersonic on the third test flight on 12 October 1964, and flew above Mach 1 for 40 minutes during the following flight on 24 October. The wing tips were also lowered partially in this flight. XB-70 No. 1 surpassed Mach 3 on 14 October 1965 by reaching Mach 3.02 at. The first aircraft was found to suffer from weaknesses in the honeycomb panels, primarily due to inexperience with fabrication and quality control of this new material. On two occasions, honeycomb panels failed and were torn off during supersonic flight, necessitating a Mach 2.5 limit being placed on the aircraft.
The deficiencies discovered on AV-1 were almost completely solved on the second XB-70, which first flew on 17 July 1965. On 3 January 1966, XB-70 No. 2 attained a speed of Mach 3.05 while flying at. AV-2 reached a top speed of Mach 3.08 and maintained it for 20 minutes on 12 April 1966. On 19 May 1966, AV-2 reached Mach 3.06 and flew at Mach 3 for 32 minutes, covering in 91 minutes of total flight.
Longest flight3:40 hours6 January 1966
Fastest speed12 January 1966
Highest altitude19 March 1966
Highest Mach numberMach 3.0812 April 1966
Sustained Mach 332 minutes19 May 1966
Mach 3 total108 minutes/10 flights

A joint NASA/USAF research program was conducted from 3 November 1966 to 31 January 1967 for measuring the intensity and signature of sonic booms for the National Sonic Boom Program. Testing was planned to cover a range of sonic boom overpressures on the ground similar to but higher than the proposed American SST. In 1966, AV-2 was selected for the program and was outfitted with test sensors. It flew the first sonic boom test on 6 June 1966, attaining a speed of Mach 3.05 at. Two days later, AV-2 crashed following a mid-air collision with an F-104 while flying in a multi-aircraft formation. Sonic boom and later testing continued with XB-70A #1.
The second flight research program investigated "control of structural dynamics" from 25 April 1967 through the XB-70's last flight in 1969. At high altitude and high speed, the XB-70A experienced unwanted changes in altitude. NASA testing from June 1968 included two small vanes on the nose of AV-1 for measuring the response of the aircraft's stability augmentation system. AV-1 flew a total of 83 flights.
The XB-70's last supersonic flight took place on 17 December 1968. On 4 February 1969, AV-1 took its final flight to Wright-Patterson Air Force Base for museum display. Flight data was collected on this subsonic trip. North American Rockwell completed a four-volume report on the B-70 that was published by NASA in April 1972.

Variants

;XB-70A
;XB-70B
;YB-70
;B-70A
;RS-70

Incidents and accidents

Accidents and notable incidents

On 7 May 1965, the divider separating the left and right halves of XB-70A AV-1's engine intake ramp broke off in flight and was ingested by all six engines, damaging them beyond repair.
On 14 October 1965, AV-1 surpassed Mach 3, but heat and stress damaged the honeycomb panels, leaving of the leading edge of the left wing missing. The first aircraft was limited to Mach 2.5 afterwards.

Mid-air collision

On 8 June 1966, XB-70A No. 2 was in close formation with four other aircraft for a photoshoot at the behest of General Electric, manufacturer of the engines of all five aircraft. After the photoshoot, the F-104 drifted into the XB-70's right wing, flipped and rolled inverted over the top of the Valkyrie, before striking the bomber's vertical stabilizers and left wing. The F-104 then exploded, destroying the Valkyrie's rudders and damaging its left wing. With the loss of both rudders and damage to the wings, the Valkyrie entered an uncontrollable spin and crashed north of Barstow, California. NASA Chief Test Pilot Joe Walker and Carl Cross were killed. Al White ejected, sustaining serious injuries, including the crushing of his arm by the closing clamshell-like escape crew capsule moments prior to ejection.
The USAF summary report of the accident investigation stated that, given the position of the F-104 relative to the XB-70, Walker, the F-104 pilot, would not have been able to see the XB-70's wing, except by uncomfortably looking back over his left shoulder. The report said that it was likely that Walker maintained his position by looking at the fuselage of the XB-70, forward of his position. The F-104 was estimated to be to the side of the fuselage of the XB-70 and below. The report concluded that from that position, without appropriate sight cues, Walker was unable to properly perceive his motion relative to the Valkyrie, leading to his aircraft drifting into the XB-70's wing. The accident investigation also pointed to the wake vortex from the XB-70's right wingtip as the reason for the F-104's sudden roll over and into the bomber.

Aircraft on display

Valkyrie AV-1 is on display at the National Museum of the United States Air Force at Wright-Patterson AFB near Dayton, Ohio. The aircraft was flown to the museum on 4 February 1969, following the conclusion of the XB-70 testing program. The Valkyrie became the museum's signature aircraft, appearing on Museum letterhead, and even appearing as the chief design feature for the Museum's restaurant, the Valkyrie Cafe. In 2011, the XB-70 was on display in the museum's Research & Development Hangar alongside other experimental aircraft. After completion of the fourth hangar at the museum's main campus, the XB-70 was moved there in late October 2015.

Specifications (XB-70A)

Citations