Novovoronezh Nuclear Power Plant II


Novovoronezh Nuclear Power Plant II is a Russian nuclear power plant located in Voronezh Oblast.
Unit 1 started commercial operation in 2017 and was the first Generation III+ nuclear reactor in the world.
Unit 2 was connected to the grid in 2019.
The power plant is built on the same site as the present Novovoronezh Nuclear Power Plant.

History

In 2006, the Russian government legislated a nuclear expansion plan for 2007–2015.
The plan aimed to put two new nuclear reactors into operation each year from 2012.
This decision provided impetus for the construction of Novovoronezh II, which had been originally been proposed in 1999.
On 20 June 2007 preparations began at the construction site,
and the construction starting ceremony was held on 12 July 2009.
In January 2017 the plant took delivery of a safety instrumentation and control system from Areva NP for installation in its Unit 1.
The first criticality of Unit 2 reactor was achieved on 22 March 2019, with connection to the grid on 1 May 2019.

Description

The power station will comprise two to four VVER-1200/392M reactors of the AES-2006 type. These reactors are the first of their kind. Unit 1 was planned to be added to the grid in 2012, with the second unit to be added a year later. Cost of the project is between 110 and 130 billion Rubles.
The city of Novovoronezh is to provide housing for incoming NvNPP II construction workers. In early 2008 the first two apartment blocks were complete and ready to use.
Construction of the nuclear power plant is important because the existing Novovoronezh nuclear power plant is a focal point of the energy supply system. The power plant complex provides energy not only to Voronezh Oblast but to Belgorod, Lipetsk and Tambov territories as well.

Reactors

The Novovoronezh Nuclear Power Plant II have two units:
UnitReactor typeNet
capacity
Gross
capacity
Construction
started
Electricity
Grid
Commercial
Operation
Shutdown
Novovoronezh II-1VVER-1200/392M 1,114 MW1,180 MW'
Novovoronezh II-2VVER-1200/392M 1,114 MW1,150 MW'

Service life of the VVER-1200 is 60 years. With extension of operation for 20 years.