Ormskirk railway station


Ormskirk railway station in Ormskirk, Lancashire, England, is a cross-platform interchange between Merseyrail services from Liverpool Central and Northern Trains services from Preston on the Ormskirk branch line, northeast of Liverpool. The station building and three arch road bridge are both Grade II listed structures.

History

The station was built by the East Lancashire Railway's Liverpool, Ormskirk and Preston Junction section, and opened on 2 April 1849. From 13 May 1859, the station was owned by the Lancashire and Yorkshire Railway. From 1 January 1923 the station was owned by the London, Midland and Scottish Railway. British Railways nationalised all railways on 1 January 1948 and the station became part of the London Midland Region.
A branch line to via was opened by the ELR in March 1858 shortly before it was absorbed by the L&YR – this left the main line to Preston just to the north of the station. The line from Liverpool was subsequently electrified in 1913, with the suburban EMUs using a bay platform at the southern end of the station to keep them clear of the busy main line to Preston, which was used as the L&Y's principle route to East Lancashire, the Fylde, Cumbria and Scotland.

1977

The original Liverpool terminus of the line was closed in 1977, when the route became one of the three branches of the new Northern Line and trains began running to a new underground terminus at Liverpool Central. Since 1996, it has been part of the Merseyrail franchise currently run by Serco-Abellio.

Station layout

The current station consists of a single platform. An interesting characteristic is how the electric Merseyrail track and the unelectrified Northern track is on the same alignment, with electric and diesel trains using opposite ends of the same platform. The line is cut by a large buffer separating the track sections. Passengers wishing to transfer from an electric train to diesel train walk a dozen yards or so along the same platform to move between trains. A similar layout exists at Kirkby station.
Prior to the Beeching Report of 1963 and the subsequent restructuring of the rail network, there were two main through platforms. The electric Liverpool commuter trains would pull into the southern bay platform. This practice ended following the withdrawal of through trains between Liverpool and Preston via this route. Local services from Preston, East Lancashire & Blackpool towards Liverpool were either withdrawn or terminated at Ormskirk from October 1969 with the last through trains running on 3 May 1970. From the 4 May 1970, the line was split with all trains using the former Liverpool platform. The bay platform is now a footpath leading to the bus station.
Only a single Merseyrail 3rd rail electric line runs into the platform, the route towards Liverpool becomes double immediately outside the station. The line from Ormskirk to Preston has been single track since the summer of 1970, except for a passing loop at.
The former link between Ormskirk and Southport, via the Burscough Curves, was closed in 1962. The Skelmersdale Branch has also been lost, having closed to passengers in 1956 and to all traffic seven years later. It was lifted in 1968, though the Burscough curves remained extant until the mid-1980s.

Facilities

The station underwent a £1.5 million renovation during 2009. Among the refurbishments include a new booking hall, waiting room, toilet facilities, ticket counters and new automatic swinging doors, as well as a remodelled and landscaped path and bicycle route up to the bus interchange. The station is classed as eco-friendly and gets its green credentials by using a system that harvests rainwater, as well as other various energy-saving measures.
During October & November 2018 the height, width and layout of the platforms were adjusted to prepare for Merseyrail's new fleet of trains which are due to be introduced from 2020.
The station is staffed, 15 minutes before the first train and 15 minutes after the last train, and has platform CCTV. There is a payphone, waiting room, booking office and live departure and arrival screens, for passenger information. The station has a free car park, with 108 spaces, as well as a 2-space cycle rack and secure storage for 28 cycles. The station and platforms have full disabled access but the car park has uneven ramp access.

Services

Services to Liverpool Central operate frequently, running every 15 minutes during the day and every 30 minutes at other times. Services to Preston now run hourly Monday–Saturday. There is no Sunday service.

Future

There have been calls from local authorities and the local rail user group to reopen both curves at Burscough to allow the reinstatement of through trains from Ormskirk to Southport, as well as to reinstate through services between Preston and Liverpool via Ormskirk and to rebuild and reopen the Skelmersdale branch. Merseytravel's 2014 Liverpool City Region Long Term Rail Strategy does not back plans for an Ormskirk to Skelmersdale route, but it suggests that a new bi-level interchange at Burscough Bridge could be built, to provide improved interchange facilities between the Ormskirk branch and the Wigan to Southport line, in addition to reopening the curves and extending electrification through to Preston and Southport.
Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, page 37, states a review to introduce new Merseyrail battery trains will be undertaken in 2020, in view to put Preston interchange station onto the Merseyrail network by extending the Merseyrail Northern Line from Ormskirk to Preston. The aim is to have Preston one of the terminals of the Northern Line, with Burscough Junction, Rufford and Croston stations brought onto the Merseyrail network. The document states, "The potential use of battery powered Merseyrail units may improve the business case".

Gallery