Section sources. The Mercury program included several pad abort tests for the launch escape system with a boilerplate crew module.
1959 July 22 – First successful pad abort flight test with a functional escape tower attached to a Mercury boilerplate
1959 July 28 – A Mercury boilerplate with instruments to measure sound pressure levels and vibrations from the Little Joe test rocket and Grand Central abort rocket/escape tower
Project Apollo
The Apollo program included several pad abort tests for the launch escape system with a boilerplate crew module.
The Orion pad abort test was started with the construction of the first Orion boilerplate. It is a basic mockup prototype to test the assembling sequences and launch procedures at NASA's Langley Research Center. Lockheed Martin Corp. was awarded the contract to build Orion on August 31, 2006. The first pad abort test trial of the escape tower system was successfully completed at New Mexico's White Sands Missile Range on May 6, 2010.
Commercial Crew
Dragon 2
was conducted on May 6, 2015 at approximately 0900 Eastern Daylight Time.. The vehicle splashed down safely in the ocean to the east of the launchpad 99 seconds later. A fuel mixture ratio issue was detected after the flight in one of the eight SuperDraco engines, but did not materially affect the flight. More detailed test results were to be subsequently analyzed by both SpaceX and NASA engineers.
The pad abort test of Boeing's Starliner craft was conducted at 14:15 UTC on November 4, 2019 at the White Sands Missile Range. The capsule was lifted to and landed with airbags approximately 90 seconds after liftoff. Though the test was deemed a success, one of three main parachutes failed to deploy properly.
ISRO pad abort test
On 5 July 2018, Indian Space Research Organisation successfully conducted a pad abort test at Satish Dhawan Space Centre, Sriharikota. A first in a series of tests to qualify a crew escape system. After a smooth countdown of five hours, the crew escape system, along with the simulated crew module with a mass of 12.6 tonnes, lifted off at 07.00 AM at the opening of the launch window from its pad at Satish DhawanSpace Centre, Sriharikota. The test was over in 259 seconds, during which the crew escape system along with crew module soared skyward, then arced over the Bay of Bengal and floated back to Earth under its parachutes about 2.9 km from Sriharikota.