Pembelik Dam


The Pembelik Dam is a gravity dam on the Peri River, in Karakoçan district of Elazığ Province, Turkey. Its primary purpose is hydroelectric power generation and is the fourth dam in the Peri River cascade. Construction on the dam began in 2009 and its two generators were commissioned in February/March 2015. The tall roller-compacted concrete dam faced opposition from locals and construction was briefly suspended in 2014. It is owned and operated by Limak Energy and Bilgin Energy.