The Pequest Fill is a large railroad embankment on the Lackawanna Cut-Off in northwestern New Jersey, touted at its 1911 completion as the largest railroad fill in the world.
Thought to have been the brainchild of Lackawanna Railroad president William Truesdale, the Pequest Fill was one of several remarkable features of the Lackawanna Cut-Off, a project that aimed to reduce the length, grades, and curvature of the railroad's main line over the hilly terrain between Port Morris, New Jersey, and the Delaware Water Gap. During planning, Truesdale rejected 13 prospective routes that skirted the Pequest Valley in favor of a bold, costly, yet operationally superior route across it. In order to maintain a more or less level grade across the valley, a fill of enormous proportions would be required to connect Andover and Green Township.
Planning for the route continued through 1906; the final survey map for the line was completed on September 1, allowing the railroad to proceed with eminent domain and hire contractors. The 28.5-mile Cut-Off project was divided among seven contractors. Whether by design or happenstance, the responsibility for building the Pequest Fill was divided roughly in half between David W. Flickwir to the east and Walter H. Gahagan to the west.
would be where US Route 206 passes under it in Andover, New Jersey. Looking north, the new Andover Station on the Cut-Off will be about a half-mile to the right.
Construction on the Cut-Off began August 1, 1908. The foundation for the three-mile Pequest Fill was constructed of 6.625 million cubic yards of fill material, far more than could be provided by classic cut-and-fill techniques. So the railroad bought 760 acres of farmland and dug it out to a depth of about 20 feet. Construction wrapped up in autumn 1911.
The Pequest Fill crosses four roadways, two railroad rights-of-way, and one river. There are no overhead bridges or grade crossings. The east end of Greendell Siding continued onto the Pequest Fill for a short distance; otherwise, the railroad was two tracks wide on the fill. The Cut-Off saw rail service between 1911 to 1979. In between, the Lackawanna Railroad operated trains over the Pequest Fill for 49 years; the Erie Lackawanna Railroad for 16 years; and Conrail for three years. After discontinuing service, Conrail sought abandonment of the line and eventually removed the tracks in 1984.
In 1985, the Cut-Off was sold to a land developer who proposed to use the entire Pequest Fill for the now-defunct Westway Project in New York City. That never occurred; by 2001, the entire Cut-Off had been acquired by the State of New Jersey.
By 2011, NJ Transit had received approval to begin construction on relaying track between Port Morris Junction and Andover. As of 2019, this project continues and is slated to open for rail service no earlier than 2021. However, there is no funding and no projected completion date for service west of Andover, over the Pequest Fill.