Plynlimon and Hafan Tramway


The Plynlimon and Hafan Tramway was a gauge narrow gauge railway in Cardiganshire in Mid Wales. It ran from on the Cambrian Line, through the village of Tal-y-bont and the valley of the Afon Leri, into the foothills of Plynlimon Fawr. It was built to serve the lead mines at Bwlch Glas and stone quarries around Hafan and opened in 1897, closing just two years later. The line was a little over long and, despite running a short-lived passenger service, it served no communities of more than 100 people.

History

Background: before 1895

of minerals in the hills east of Talybont in Mid-Wales dates back as far as 1698, with the Hafan Mine, which principally produced lead ore, but also copper ore and zinc.
In 1890, Captain John Davis of Talybont and Thomas Molyneux, an industrialist of Earlestown in Lancashire, joined forces to exploit minerals from local mines including Hafan Mine, and to develop grit stone quarries on Hafan mountain. Molyneux proposed building a tramway from Hafan to the coast at Ynyslas along the Leri Valley from Hafan through Talybont to Dolybont, and then running down and across Cors Fochno using the canalised embankment of the Leri diversion constructed by the Aberystwyth & Welsh Coast Railway, to a Dock suitable for coasters at Ynyslas. However the Cambrian Railways would not permit the tramway to cross its line at any point between Machynlleth and Aberystwyth, leaving no alternative but to unload into barges to get under the bridge at Ynyslas, and then tranship to coasters on the other side. Much thinking went on as to how to get to the sea elsewhere: in frustration, Clarach Bay was considered but ship loading would have been very difficult. A tramway under Ynyslas bridge was considered but discounted due to obvious tide problems, even a line alongside the main line to Aberystwyth Harbour was considered. Transhipping at Ynyslas was discounted as too costly a procedure. In the end it was decided the only option was to go to the Cambrian Railways. Llandre Station, even though Mr Molyneaux had previously stated that much benefit would be lost by their not having direct access to a port. However, this option was the only way in the end.

Construction: 1896 to May 1897

Construction commenced on 11 January 1896, but was briefly brought to a halt by the Gogerddan Estate as agreements for the final route had not been signed. Some months afterward construction resumed. The mines and tramway to this point had been funded by Molyneaux, but on 24 October 1896 he sold his holdings to the Plynlimon & Hafan Co.Ltd. for £14,000 of the new company's ordinary shares - meaning he held 46.6% of the new company, and became its Managing Director - with his son holding the post of General Manager and Engineer.
By late 1896, the trackbed of the line was largely complete. After much delay, track materials were delivered in January 1897, with the first rails being laid at Talybont on 11 January by contractor "Mr. Price of Newtown". Tracklaying progressed quickly and in May the first locomotive Victoria arrived on site. During December, Molyneaux had asked Sir P.P. Pryse "...to try to get Sir James Szlumper to adopt the P&H gauge of 2'3" for the proposed Devils Bridge line". Szliumper decided to build the Vale of Rheidol Railway to a gauge of due to the sharp curves required for the line.

Testing and opening: June 1897 to August 1897

The first test run of Victoria was a limited success. On 5 June, another attempt was made with the locomotive propelling two trollies and pulling a third. Just before Glanfread level crossing a piece of timber was spotted lying across the rails. One of the men on the leading trolley, Richard Owen Roberts, tried to kick the timber away while the train was in motion, but he slipped and fell underneath the train and was killed when the locomotive ran over him. Three other men on the trollies were severely injured in the accident. The railway had suffered a spate of stones and timbers being laid across the tracks, though this was by far the most serious outcome of this vandalism.
In August 1897 the second locomotive Talybont arrived along with the line's first passenger carriage. On 19 August a trial train was run as far as the bottom of the Hafan incline, although the track between Llanfihangel and Talybont was not laid to a high enough quality to permit passenger services to begin immediately.

Services and closure: September 1897 to 1899

From late 1897 freight service began on the line. The formal opening to passengers took place on 28 March 1898, although trains only ran on Mondays, connecting with the Cambrian Railway's Market Day Special to Aberystwyth. The majority of passenger trains in the line's short history stopped at Talybont as there were few houses to be served further east of that village.
The passenger service only ran until the summer of 1899 and the entire company went into voluntary liquidation on 19 December 1899 the last train having run sometime before that date.

Re-opening attempts: 1900 and later

Not long after closure, the company operating the Bryn-yr-Afr Mine attempted to reopen the line to serve their needs, but nothing came of it.
In 1910, Cardiganshire County Council suggested to the company that they explore re-opening the tramway as a standard gauge branch of the Cambrian Railways. However, this also came to nothing. The track remained in place until 1914 when it was taken up, though the stretch of line through the Bwlchglas Farm property remained intact until scrapped by the landlord in 1926.

Route

The main line terminated at the foot of the Hafan Incline, while a mineral extension led from the top of the incline to a granite sett quarry operated by the little Bagnall 0-4-0.
The Plynlimon and Hafan was one of the most obscure common carrier railways in Britain. It shared its unusual gauge with only three other public railways in Britain: the nearby Corris Railway and Talyllyn Railway and the later Campbeltown and Machrihanish Light Railway in Scotland.
Molyneaux's use of this gauge may indicate a somewhat optimistic idea of connecting to the Corris and Talyllyn railways, and he also unsuccessfully pressed the promoters of the Vale of Rheidol Railway to adopt the same gauge, which if adopted would have created a system in the area to rival the gauge lines around Porthmadog. Since the Corris had originally had access under the Cambrian line at Machynlleth for its horse-worked extension to Morben, it might have been possible to revive this section of line as a linking route, but it was another step again to link to Talyllyn metals. However, the P&H's loading gauge was both taller and wider than its two northern neighbours, and so none of its rolling stock could have been used on either Corris or Talyllyn, suggesting that no link was seriously contemplated. This also meant that neither line were interested in buying any of the P&H rolling stock after it closed.
Molyneaux had proposed a tunnel under Hafan so to serve the Bryn-yr-Afr Mine, but this was only a dual step in the 'grand plan' for a connection south to the Devils Bridge line and the other northerly connections that were on Mr Molyneaux's mind.
Today the trackbed formation from Pontbrengeifr to the Hafan incline remains largely open and intact and can be walked; much of the formation of the mineral extensions at the top of the incline is also traceable. Between Pontbrengeifr and Talybont sections of the formation remain intact, but others have been eroded away by the Afon Leri and are heavily overgrown which makes walking it more difficult. There is now little to see of the former exchange sidings at Llandre.

Locomotives

The tramway owned three steam locomotives.
Both the Bagnalls were returned to the makers after the line closed, while Victoria was probably scrapped. Talybont was regauged and sold on to the Vale of Rheidol Railway and became their No.3 Rheidol, while Hafan went on to work on reservoir contracts.

Passenger Carriage

The tramway had only one passenger carriage, a rather ornate vehicle with end balconies and clerestory roof. Legend has it that after the tramway closed it was used as a shed on a farm or garden, but if this was the case it disappeared many years ago. A replica has been built and is running on the Launceston Steam Railway.

Goods Vehicles

Some of the tramway's wagons accompanied "Talybont" to the Vale of Rheidol, and, much rebuilt, remain there to this day.