Port Alma Wind Farm


Port Alma Wind Farm is a large wind farm project located on the north shore of Lake Erie in the Municipality of Chatham–Kent, Ontario, Canada.
It began generating electricity in November, 2008. It is owned and operated by Kruger Energy. The power will be fed into the Ontario electricity market administered by the Independent Electricity System Operator.
The wind farm consists of forty four Siemens 2.3 Mark II wind turbines, with an installed capacity of 101.2. It is capable of generating approx. 300 annually, which will produce enough energy to power 30,000 households.
The project study area is approx. 285 km² centred on Port Alma.
A substation was built to step-up the power to transmission level voltage and approximately of transmission line was built for connection to the Hydro One owned 230 kV circuits about east of Tilbury.