Portage Lake Lift Bridge


The Portage Lake Lift Bridge connects the cities of Hancock and Houghton, in the US state of Michigan. It crosses Portage Lake, a portion of the waterway which cuts across the Keweenaw Peninsula with a canal linking the final several miles to Lake Superior to the northwest. US Highway 41 and M-26 are both routed across the bridge. It is the only land-based link between the north and south sections of the Keweenaw peninsula.
This moveable bridge is a lift bridge with the middle section capable of being lifted from its low point of four feet clearance over the water to a clearance of to allow boats to pass underneath. The bridge is the world's heaviest and widest double-decked vertical-lift bridge. More than 35,000 tons of concrete and 7,000 tons of steel went into the bridge, which replaced the narrow 54-year-old swing bridge, declared a menace to navigation on the busy Keweenaw Waterway.
Hancock and Houghton hold an annual celebration called Bridgefest to commemorate the opening of the bridge which united their two communities.

History

The original bridge on the same site was a wooden swing bridge built in 1875. The bridge was built by James P. Edward of Fox and Howard Inc. of Chicago. Three local men raised $47,000 in stocks for the toll bridge. Construction began in the spring of 1875 and was finished in the spring of 1876. This was replaced by a steel swing bridge, the Portage Canal Swing Bridge, built by the King Bridge Company in 1895. The Portage Canal Swing Bridge was damaged when a ship, the Northern Wave, collided with it in 1905. The center swinging section of the bridge was replaced and a similar incident almost occurred again in 1920, but the ship was able to stop by dropping its anchor, which snagged on the bottom of the lake. In 1959, the Portage Canal Swing Bridge was replaced, at a cost of about $11-13 million, by the current bridge. The Al Johnson Construction Company was the general contractor. The American Bridge Company built the superstructure and the Bethlehem Steel Company provided the structural steel.
The original 1959 design by Hazelet and Erdal of Chicago of the bridge's liftspan had roadways constructed on both levels with rails embedded in the road surface on the lower deck. This allowed the span to be partially raised to allow small and medium boat traffic to pass underneath without disrupting vehicular traffic. From this middle position, the span would then only need to be raised for large ships or lowered to allow trains to cross. With the end of rail service in 1982, the lowest position is no longer needed to allow trains to pass so the bridge is not lowered below the middle position during the summer boating season except for periods of maintenance or repair. In the winter after the lake freezes, the bridge is placed in the lowest position to allow the lower deck to be used by snowmobile traffic.