Project Iceworm was a top secretUnited States Army program of the Cold War, which aimed to build a network of mobile nuclear missile launch sites under the Greenland ice sheet. The ultimate objective of placing medium-range missiles under the ice — close enough to strike targets within the Soviet Union — was kept secret from the Government of Denmark. To study the feasibility of working under the ice, a highly publicized "cover" project, known as Camp Century, was launched in 1960. Unstable ice conditions within the ice sheet caused the project to be canceled in 1966.
To test the feasibility of construction techniques a project site called "Camp Century" was started by the United States military, located at an elevation of in Northwestern Greenland, from the AmericanThule Air Base. The radar and air base at Thule had already been in active use since 1951. Camp Century was described at the time as a demonstration of affordable ice-cap military outposts. The secret Project Iceworm was to be a system of tunnels in length, used to deploy up to 600 nuclear missiles, that would be able to reach the Soviet Union in case of nuclear war. The missile locations would be under the cover of Greenland's ice sheet and were supposed to be periodically changed. While Project Iceworm was secret, plans for Camp Century were discussed with and approved by the Kingdom of Denmark; the facility, including its nuclear power plant, was profiled in The Saturday Evening Post magazine in 1960. The "official purpose" of Camp Century, as explained by the United States Department of Defense to Danish officials in 1960, was to test various construction techniques under Arctic conditions, explore practical problems with a semi-mobile nuclear reactor, as well as supporting scientific experiments on the icecap. A total of 21 trenches were cut and covered with arched roofs within which prefabricated buildings were erected. With a total length of, these tunnels also contained a hospital, a shop, a theater and a church. The total number of inhabitants was around 200. From 1960 until 1963, the electricity supply was provided by means of the world's first mobile/portable nuclear reactor, designated PM-2A and designed by Alco for the U.S. Army. Water was supplied by melting glaciers and tested to determine whether germs such as the plague were present. Within three years after it was excavated, ice core samples taken by geologists working at Camp Century demonstrated that the glacier was moving much faster than anticipated and would destroy the tunnels and planned launch stations in about two years. The facility was evacuated in 1965, and the nuclear generator removed. Project Iceworm was canceled, and Camp Century closed in 1966. The project generated valuable scientific information and provided scientists with some of the first ice cores, still being used by climatologists today.
Size of proposed missile complex
According to the documents published by the Kingdom of Denmark in 1997, the U.S. Army's "Iceworm" missile network was outlined in a 1960 Army report titled "Strategic Value of the Greenland Icecap". If fully implemented, the project would cover an area of, roughly three times the size of Denmark. The launch complex floors would be below the surface, with the missile launchers even deeper, and clusters of missile launch centers would be spaced apart. New tunnels were to be dug every year, so that after five years there would be thousands of firing positions, among which the several hundred missiles could be rotated. The Army intended to deploy a shortened, two-stage version of the U.S. Air Force's Minuteman missile, a variant the Army proposed calling the Iceman.
Sheet ice elasticity
Although the Greenland icecap appears, on its surface, to be hard and immobile, snow and ice are viscoelastic materials, which slowly deform over time, depending on temperature and density. Despite its seeming stability, the icecap is in constant, slow movement, spreading outward from the center. This spreading movement, over the course of a year, causes tunnels and trenches to narrow, as their walls deform and bulge, eventually leading to a collapse of the ceiling. By mid-1962 the ceiling of the reactor room within Camp Century had dropped and had to be lifted. During a planned reactor shutdown for maintenance in late July 1963, the Army decided to operate Camp Century as a summer-only camp and did not reactivate the PM-2A reactor. The camp resumed operations in 1964 using its standby diesel power plant, the portable reactor was removed that summer, and the camp was abandoned altogether in 1966.
Ecological impact
When the camp was decommissioned in 1967, its infrastructure and waste were abandoned under the assumption they would be entombed forever by perpetual snowfall. A 2016 study found that the portion of the ice sheet covering Camp Century will start to melt by 2100, if current trends continue. When the ice melts, the camp’s infrastructure, as well as remaining biological, chemical and radioactive waste, will re-enter the environment and potentially disrupt nearby ecosystems. This includes 200,000 liters of diesel, PCBs and radioactive waste.