Punata Province


Punata is a province almost in the middle of the Cochabamba Department, Bolivia, located about 45 km south of the city of Cochabamba. Its capital is Punata. The province is limited to the north by the Chapare Province, to the north-east by the Tiraque Province, to the east by the Arani Province, to the south-east by the Mizque Province, to the south by the Esteban Arze Province and to the west by the Germán Jordán Province.
Its archaeological and historical sites are the main interest for foreign tourists.

Subdivision

Punata Province is divided into five municipalities which are partly further subdivided into cantons.
SectionMunicipalitySeat
1stPunata MunicipalityPunata
2ndVilla Rivero Municipality or Muela MunicipalityVilla Rivero
3rdSan Benito Municipality
or Villa José Quintín Mendoza Municipality
San Benito
4thTacachi MunicipalityTacachi
5thCuchumuela Municipality
or Villa Gualberto Villarroel Municipality
Cuchumuela

The people

The people are predominantly indigenous citizens of Quechuan descent. By 2001 census was counted 47735 inhabitants and it rose to 54409 inhabitants by the 2012 census. The economic center is the city of Punata with 28707 inhabitants.
Ethnic groupPunata Municipality Villa Rivero Municipality San Benito Municipality Tacachi Municipality Cuchumuela Municipality
Quechua76.293.887.192.994.3
Aymara0.80.10.60.10.4
Guaraní, Chiquitos, Moxos0.10.00.10.00.2
Not indigenous22.76.012.17.04.9
Other indigenous groups0.20.00.10.00.2

Ref: obd.descentralizacion.gov.bo

Languages

The languages spoken in the Punata Province are mainly Quechua and Spanish. The following table shows the number of those belonging to the recognized group of speakers.
LanguagePunata MunicipalityVilla Rivero MunicipalitySan Benito MunicipalityTacachi MunicipalityCuchumuela Municipality
Quechua21,2555,38710,5299531,767
Aymara256169443
Guaraní254911
Another native227601
Spanish20,7973,3949,650674851
Foreign148144831
Only native4,2322,2012,450350968
Native and Spanish17,0963,1948,105603801
Only Spanish3,7032001,5457150

Irrigation of the alluvial fan of Punata

Reference: The Punata-Tiraque irrigation project near Cochabamba, Bolivia
The alluvial fan of Punata in the Valle Alto is fed by The Rio Paracaya river with a high average discharge. Consequently, the fan is fairly flat.
The region of Punata, at the upper end of the Valle Alto, at about 2800 m altitude, has a summer rainfall of 400 to 450 mm starting in the second half of November end ending in March. Maize is here the most important food crop, followed by potatoes. Alfalfa is the dominant fodder crop, followed by maize straw.. These crops could, of old, only be planted successfully because of the existence of additional water resources like runoff, floods, river base-flow and groundwater. In the winter months, crop growth is restricted due to the occurrence of night frosts, especially in June and July, and absence of rains.
The total rural population in Punata is estimated at 25 000. There are about 4000 families of which an estimated 3680 are farmer families. The farms are small. The average size is 1.3 ha of which 1 ha is cropped. The modal size of farm is smaller, about 0.7 ha.
The rainfall distribution in Punata is characterized by a wet season from December to March, a dry season from May to October, and transition months in April and November. The average yearly total is 428 mm. The rainfall with a probability of exceedance of 75% on a year basis is 360 mm. Rainfall is not reliable: in the period from 1966 to 1983, the yearly total varied between 246 mm to 591 mm.
The river floods during the rainy summer period can be used for irrigation by anyone who wants to. When the river flow recedes, the stream can only be used for rotational irrigation by those who are entitled to take part in it. By the month of May the river base-flow becomes strongly reduced, and a drought period sets in, lasting into November.
Irrigation is considered desirable to start the cropping season in August/September, so that an early harvest can be obtained. The early harvest has a high market value and reduces peak labor requirements. Further, the irrigation reduces the risk of crop failure and it permits diversification of agricultural produce. Nevertheless, there are some farming communities that have refrained in the past from the extra effort to obtain additional irrigation water and who seemed to be content with purely rain-fed cropping.
At a modest scale, irrigation from deep-wells is also practiced.
In order to satisfy the needs of the majority of the farmers who strongly wish to have additional irrigation water, the irrigation project Punata-Tiraque began to be developed from 1970 onwards. The project entailed the construction of a complicated system of dams and reservoirs up in the Andean mountains.
The gross area of the Punata projects is estimated at 4600 ha, 90% of which can be used for agriculture or animal husbandry. About 1150 ha of this presently receive irrigation water, either surface water derived from the Laguna Robada or Lluska Kocha dam, or water pumped from the 16 deep wells in the project area. In addition there are a few hundred hectares that receive occasional water from mita irrigation.
The traditional irrigation method is based on handling large irrigation flows per farm at large intervals. The intake structures in the Pucara Mayu river, at the place where it enters the alluvial fan of Punata, would alternately pass water from each of the reservoir systems and the natural mita water. The new system has been designed for smaller flows with shorter rotation intervals, but it works continuously for the whole area, so that there is no need anymore to separate the various sources of water. It covers a much larger area than the traditional system and it incorporates the associations of the mita systems, the associations of tube-well systems as well as the persons who had no previous water rights.
Hence, the new irrigation system makes it necessary to replace the traditional water rights by a totally new set of rights. In addition, the farmers will have to get used to new water distribution methods and new field irrigation techniques. Because the new irrigation zones do not correspond to the boundaries of the existing, scattered, Comité’s de Riego, not only the water management but also the organizational structure will have to be adjusted to the new situation.