Purbachal New Town is the biggest planned township in Bangladesh. The project area consists of about 6,227 acres land located in between the Shitalakhya and the Balu River at Rupgonj thana of Narayanganj District and at Kaligonj Thana of Gazipur District, in the northeastern side of Dhaka. The Township will be linked with eight-lane expressway from the Airport Road/Pragati swarani crossing. The distance is only 6.8 km. There will be provision of about 26,000 residential plots of different sizes, 62,000 apartments with all necessary infrastructure and urban facilities. RAJUK intends to plan and develop the area as self-contained new township with all modern facilities. By 2025,Japanese construction giant Kajima Corporation,along with their Bangladeshi partner Sikder Group, has announced to complete the construction of 142 storied supertall skyscraperIconic Tower in Purbachal sector 19.
Background of the project
has now been turned into one of the busiest and densely populated cities. The dwelling places required for the large number of people are quite very inadequate. As a result, the residential areas of Dhaka city are turning into overcrowded dirty localities day by day and are creating an unhealthy environment. The pressure of population of Dhaka should be reduced by developing the surrounding area of Dhaka in a planned way and establishing more and better permanent residential accommodation for the vast population. Consultants: The total DAP area was divided into five groups and a number of small locations. These were awarded to five firms—Development Design Consultants, Engineering and Planning Consultants, GBL Group, Sheltech, and BETS Consulting Services.
Location of the Project
Purbachal New Town Project is situated at Rupganj Upazila of Narayanganj District and Kaliganj Upazila of Gazipur District in between river Balu and Sitalakhya at a distance of 16 km from zero point of Dhaka. The project implementation period is July 1995 to June 2014. The total area is 6,150 acres which is divided into thirty sectors. Out of which development works are going on in 4,500 acres.
Objective of the project
To reduce the pressure of population in Dhaka city by creating opportunity of residential accommodation of the city dwellers in the vicinity of the city.
To maintain the balance of environment by proper urbanization. To create environment friendly and sustainable atmosphere.
To reduce the existing acute problem of housing.
To expand civic facilities by urbanization to the nearby and surrounding areas gradually.
Development of new township and to expand economic facilities.
To mitigate future housing demand.
"Purbachal" is 8 km away from the American Embassy, which is less than half the distance from Uttara. Government offices will be moved to "Purbachal": Prime Minister's office, Secretariat, RAJUK office, and all other important offices. 2nd campus of Dhaka University, largest educational institute of Bangladesh, will be held in "Purbachal". International offices will be moved to "Purbachal": Foreign Embassy, World Bank, all other international offices. "Purbachal" will be a town free of traffic jams thanks to urban planning, the widest roads in the country, and the big and beautiful flyover. "Purbachal" will be a peaceful and beautiful "ideal town", aimed at elimination of air and sound pollution. All kinds of modern entertainment will be available in "Purbachal", like Novo Theater, 3D Theater, Planetarium, Water World, Museum etc. "Purbachal" will be a town with a combination of the latest educational systems and medical facilities.
Land Use Plan Major component
Residential Plots - 38.74%
Road network - 25.9%
Physical & social infrastructure - 3.04%
Lake - 7.1%
Administrative and commercial plots - 6.41%
Education & institution - 6%
Neighbourhood/play field -2.5%
Present condition of the project
Site development works of sector 1–5, 11 to 14 & 17 have nearly been completed. For other sectors the site development works are progressing smoothly. Estimate for site development at Gazipur part has been completed and tendering for execution is under process. Road construction works in sector no 1 to 5, 11, 13, 14 & 17 have nearly been completed. For other sectors the road construction works are ongoing. At 1st phase 7 no.s of bridge construction work are ongoing. At 2nd phase 4 no.s of bridge construction work are ongoing. Rest of the bridges are in the process of tendering. Necessary actions are being taken for establishing of utility services viz electricity, gas, water supply, sewerage and telecommunication etc. through the connection authority. The handing over of plots in the sectors 4, 5 and 17 has started in March 2011. Handing over of plot in the sectors 3, 11, 12,13 and 14 is expected to be started quickly. It may take five more years to hand over plots to 25,000 owners, who have fallen in uncertainty. The stipulated time to complete the project was 2008. But it may take more time as only 25 per cent work had so far been completed. According to the project map, there will be 10 bridges, but no tender to this effect was floated. Only 15 kilometer roads inside the project have been completed out of 140 kilometers in the sectors 1, 4, 5, 11, and 17. The handing over of plots in the sectors 4, 5 and 17 has been started. No necessary steps have been taken for establishing utility services like electricity, gas, water supply, sewerage and telecommunications. Real estate is being managed by "Faith & Fair group".