The route was legislated in 2006 as commencing along the R835 near Lucan, and running south via Ballyowen Distributor Road and Grange Castle Road to Kingswood Interchange on the N7. This forms "Phase 1" of the planned outer ring road. Phase 2, which opened in December 2006, commences at the N4 road east of Lucan, passing through Ballyowen, with a junction for Adamstown, before linking up with the existing road at Grange Castle. Almost the entire route is a dual carriageway, apart from the bridge over the N4. From the N4 to Adamstown, there is only one traffic lane and a bus lane in each direction. From Adamstown to Kingswood, the route has two lanes and a bus lane in each direction. However all junctions, other than the N4 junction and N7 flyover, are at-grade, and the median is rather narrow. The term Outer Ring Road should not be confused with Outer Orbital Route, which refers to an indicative plan to construct a second motorway bypass ring around Dublin, further out from the city. Nor should it be confused with the existing Outer Orbital Route which circles the inner city in the Dublin City Council area, outside the Inner Orbital Route. Phase 3 of the road opened in July 2008, from the Kingswood Interchange to the N81 Tallaght Bypass in Tallaght. This road was half a new build, half an upgrade of Cheeverstown Road and the junction of Cheeverstown Road and the N81. This section also included a provision for LuasLine A1 to cross it. This facilitated works on the line, which began in February 2009, to proceed without having to make any further alterations to the road.
Potential upgrades
Although provision had been made for the route to head further northwards, crossing the Liffey and joining the R121 road at Porterstown, the future bridge to be built linking these points will be for the proposed Metro West only. Such a road link would have linked with existing relatively high grade sections of the R121 to provide a ring road link from Cherryhound at the M2 in the north west of Dublin's suburbs back to the N81 to the south west.
Planning dispute
When this road was being planned it was opposed by various interests. It was eventually completed with the semi-rural section through Grange Castle built as standard dual carriageway; two traffic lanes plus hard shoulder in each direction. It remained unopened for a time as Dublin City Council insisted that the bus lane run outside the hard shoulder so as to leave only one traffic lane. The local authority refused to open the road with such a bizarre arrangement and eventually the City Council relented.