Rail transport in Myanmar


Rail transport in Myanmar consists of a railway network with 1225 stations.. The network, generally spanning north to south with branch lines to the east and west, is the second largest in Southeast Asia, and includes the Yangon Circular Railway which serves as a commuter railway for Yangon, the principal commercial city in Myanmar. The quality of the railway infrastructure is generally poor. The tracks are in poor condition, and are not passable during the monsoon season. The speed of freight trains is heavily restricted on all existing links as a consequence of poor track and bridge conditions. The maximum speed for freight trains has been quoted as, suggesting that commercial speeds on this section could be as low as.
The network is run by Myanma Railways, a state-owned railway company under the Ministry of Rail Transportation. In the 2013-14 fiscal year, Myanmar Railways carried about 60 million passengers and 2.5 million metric tons of freight. Its rolling stock consisted of 384 locomotives, 1,600 passenger railcars, and 3,600 freight wagons.
The network has steadily increased in size over the last two decades, from nearly in 1988 to in 2010. Myanmar Railways is currently undertaking an ambitious expansion program that will add another to its network, making it spread in to including extensions to Myeik in the south, Kyaingtong in the east, Sittwe in the west.

History

Rail transport was first introduced in Myanmar in May 1877 with the opening of the Yangon to Prome line by The Irrawaddy Valley State Railway when Lower Burma was a British colony. Unusually for a British colonial railway, it was built to. Subsequent development was to the same gauge, though the Burma Mines Railway opened in 1906 operated on a separate gauge. In 1884, a new company, The Sittang Valley State Railway, opened a line along the Sittaung River from Yangon to the town of Taungoo via Bago. After the annexation of Upper Burma following the Third Anglo-Burmese War of 1885, the Taungoo line was extended to Mandalay in 1889. Following the opening of this section, the Mu Valley State Railway was formed and construction began on a railway line from Sagaing to Myitkyina which connected Mandalay to Shwebo in 1891, to Wuntho in 1893, to Katha in 1895, and to Myitkyina in 1898. Extensions into southern Myanmar began in 1907 with the construction of the Bago-Mottama line. Passengers had to take a ferry over the Thanlwin River to Mawlamyaing.
In 1896, before the completion of the line to Myitkyina, the three companies were combined into the Burma Railway Company as a state owned public undertaking. In 1928, the railway was renamed Burma Railways and, in 1989, with the renaming of the country, it became Myanma Railways.
The Japanese invasion during the Second World War caused considerable damage to the rail network. In 1942, the country had of metre gauge track, but the Japanese removed about and, by the end of the war, only was operational in four isolated sections. The Japanese were also responsible for the construction of the Thailand - Burma Railway, also known as the Death Railway, using the labour of Allied prisoners of war, many of whom died in the attempt. The "Death Railway" link with Thailand fell into disuse after the war and the section of this line in Burma was permanently closed.
Attempts at rebuilding the network began in the 1950s following Burmese independence. By 1961 the network extended to, and then remained constant until the opening of a line from Kyaukpadaung to Kyini in October 1970. In 1988, there were 487 operational railway stations over a long network. Since coming to power in 1988, the military government embarked on a railway construction program and, by 2000 the network had grown to divided into 11 operating divisions. Between 1994 and 1998, the Ye-Dawei railway in peninsular Myanmar was completed. With the construction of the road/rail bridge across the Ye River in 2003 and the

Lines

There are 960 active railway stations in Myanmar with Yangon Central and Mandalay Central as the twin anchors of the network. Recently, rail service has been extended along the Taninthayi coast to Mon State and Tanintharyi Region with Mawlamyine station as the southern hub. The railway lines generally run north to south with branches to the east and the west.
Most of the routes are single track although large parts of Yangon-Pyay and Yangon-Mandalay routes are double track.
Myanmar's railway network is divided into three broad groups of lines, the lines in Upper Myanmar, those in Lower Myanmar, and the Yangon Circular Railway that serves as Yangon's commuter rail.

Rail lines in Lower Myanmar

Rail lines in Upper Myanmar

LineRouteNotes
Mandalay-MyitkyinaMandalay-Sagaing-Shwebo-MyitkyinaLength=
Northern Shan State RailwayMandalay-Pyinoolwin-Kyaukme-Hsipaw-LashioLength=
Mandalay-ThaziMandalay-Thedaw-Dahuttaw-Hanza-Ywapale-ThaziLength=
Monywa-PakkokuMonywa-Khinnu-Mandalay-PakkokuLength=

Yangon Circular Railway

Yangon Circular Railway is a 39-station loop system that connects Yangon's downtown, satellite towns and suburban areas. Around 150,000 people use the approximately 300 trains that run around the loop daily.

Proposed rapid transit

The Yangon Urban Mass Rapid Transit is due to begin construction of the east-west line from Hlaing Thayar in the west to Parami in the east in 2022, to be complete by 2027. This line is to be further extended east to Togyaung Galay station on the Yangon-Bago intercity rail line.

Lines under construction

The following four lines are currently under construction:
  1. Kyaukyi–Sinkhan–Bamow with a distance of as a part of Katha–Bamow railway project to allow the passengers and cargo to reach Bamow by rails rather by the Irrawaddy flotilla service. So far, the opened section is while the other is still under construction. The section under construction is the Kyaukkyi Bridge across Ayarwaddy Bridge at Sinkhan–Bamaw. Construction started 16 May 2007 expecting to finish the project in 2018–2019. The opened sections are:
  2. # Katha-Moetagyi : construction started 16 May 2007 and opened 20 May 2010
  3. # Moetagyi–Kyaukkyi : construction started 16 May 2007 and opened 7 February 2014
  4. Natmouk- KanPyar with a distance of as a part of Pyawbwe-Natmouk-Magwe railway project. So far, the opened section is while the other are still under construction, being Kanbya-Natmauk. Construction started 10 November 2008, expecting to finish in 2017 - 2018. The opened sections are:
  5. # Magwe-Kanbya : construction started 10 November 2008, opened 19 December 2009
  6. # Pyawbwe - Ywadaw : construction started 10 November 2008, opened 16 January 2010
  7. # Ywadaw-Natmauk : construction started 10 November 2008, opened 16 March 2013
  8. Yechanbyin - Kwantaung - Kyaukhtu - Ann - Minbu with a distance of as a part of Minbu-Ann-Sittway railway project to allow the connection to Port of Sittway. So far, the opened section is while the other is still under construction, one of them being Yechanbyin-Pardaleik. Construction started 15 February 2009. The other sections which are waiting for budget and contract signing is Pardaleik-Kwan Taung and Kyaukhtu-Ann-Minbu with a hope to finish the project in 2021 - 2022. Sittwe-Kyaukthu-Zorinpui railway is part of India-Myanmar Kaladan Multi-Modal Transit Transport Project. From Minbu it will connect to 1,215 km long Kyaukpyu port-Minbu-Kunming high-speed railway being planned by China. The opened sections are:
  9. # Sittwe-Yechanbyin : construction started 15 February 2009, opened 19 May 2009
  10. # Kwan Taung- Ponnagyun-Yotayouk : construction started 15 February 2009 and opened 15 May 2010
  11. # Yotayouk-Kyaukhtu : construction started 16 May 2010, opened 11 April 2011
  12. Einme-Nyaundong with a distance of as a part of Pathein – Einme - Nyaundong Yangon to allow the connection between Yangon with Port of Pathein. The section under construction is Einme-Nyaungdong-Hlaingthayar. Construction started 1 December 2009 with a hope to be done in 2017 - 2018. So far, the opened section is while the other is still under construction. The opened sections are:
  13. # Pathein-Einme : construction started 1 December 2009 and opened 20 March 2011

    Rolling Stock

In 2005, the Japan Railways Group and other, privately owned, Japanese railway companies donated rolling stock to Myanmar Railways, including former JNR-era DMUs, railcars and passenger coaches. China donated 130 units of meter gauge carriages in 2006 and another 225 in 2009. In early As of 2011, Myanma Railways operated 389 locomotives and 4673 railway coaches.

Locomotives

In 1999, Myanma Railway had 201 diesel locomotives, and a further 88 were on order. Up to 1987 the main suppliers were Alstom, Krupp and various Japanese companies, but since then orders have been placed with China because of Myanmar's lack of access to hard currency. In 2004, Myanma Railway had approximately 40 oil-fired steam locomotives, of which about a dozen were serviceable and saw occasional use on goods, local passenger and tourist trains. Up to three heavy repairs are performed per year using locally manufactured parts. Between 1988 and 2009, the railway imported 96 diesel locomotives, 55 from China and 41 from India and, by December 2009, it had a total of 319 locomotives. In October 2010, the railway acquired 30 more locomotives from China.
In 2014, Myanma Railway acquired a Hokutosei train set from Japan after the withdrawal of the Hokutosei Blue Train Service when the operation of Hokkaido Shinkansen began in 2014. The locomotive acquired was the former DD51 Diesel Locomotive along with the former Blue Trains that were formerly operated by JR Hokkaido.
In March 2018, India handed over 18 diesel-electric locomotives to Myanmar under an Indian line of credit. These 18 locomotives were fitted with the microprocessor control based system. 1350 HP AC/DC main line diesel locomotives with a maximum speed of 100 km/h had been customised for the Myanma Railways. From the Indian side, RITES Ltd., an Indian government enterprise, has been a principal partner of Myanma Railways and was involved in the supply of these 18 locomotives.

Coaches

In 1999 Myanma Railways had 868 coaches, with a further 463 on order. However many branch lines have only lightly built permanent way, and on these routes traffic is in the hands of a fleet of more than 50 light rail-buses built from lorry parts in MR's workshops. These are powered through their rubber-tired road wheels, and usually haul three small four-wheel coaches converted from goods wagons. Small turntables are used to turn the rail-buses at the termini.

Wagons

There were 5187 freight wagons in 1999, with 1188 due to be delivered. The majority of goods trains on lines without significant gradients run without any train brakes, as most of the serviceable wagons have been cannibalised and now lack vacuum hoses. Goods trains up to 600 tonnes are braked by the locomotive only, and operate at a maximum speed of. If the train is particularly heavy the wagons at the front will be fitted with hoses for the duration of the trip. On the steeply-graded ghat sections all wagons will be braked.

Railway links to adjacent countries

Apart from the Thailand–Burma Railway the country has never had any international links. However:
The proposed international rail links are: