River Subdivision (CSX Transportation)
The River Subdivision is a railroad line owned by CSX Transportation in the U.S. states of New Jersey and New York. The line runs from the North Bergen Yard in Hudson County, New Jersey, north to Ravena, New York, along the alignment of the West Shore Railroad, a former New York Central Railroad line.
History
The original line was opened in segments by a number of different companies from the 1860s to the opening of the full line in the 1880s, by which time it was known as the New York, West Shore and Buffalo Railway. Through mergers, leases, and takeovers, it became part of the New York Central Railroad and then Conrail in 1976. When the majority of Conrail was broken up in 1999, its River Line was assigned to CSX Transportation.Current operation
The River Subdivision is a major north-south rail corridor located between Bogota, New Jersey and Ravena, New York, carries strictly freight trains and runs mostly along the shoreline or paralleling closely to the west bank of the Hudson River. The River Subdivision is part of the CSX Albany Division, which in turn is part of CSX's Northern Region of Operations.The CSX designated subdivision code for the River Subdivision is "RI", with the River Subdivision falling under the "NI" dispatchers desk since March 8, 2009. It had been part of the "NJ" dispatchers desk until this date. Mileposts and locations along the River Subdivision are denoted by the CSX milepost prefix: "QR".
Trackage prior to 2008
Note: CP stands for Control Point, which denotes an interlocking, or the location of a track signal or other marker with which dispatchers can specify when controlling trains.Prior to July 1, 2008, the section of track from QR 2.1 north to CP-QR 7, a point located in Bogota, New Jersey, was originally part of the CSX Bergen Subdivision / Baltimore Division prior to 2008, while the River Subdivision began at CP-QR 7 and continued north to Selkirk.
On July 1, 2008, the segment from QR 2.1 to CP-QR 7 ; was incorporated into the River Subdivision, and the Bergen Subdivision was abolished. Also taking place at this same time, was the River Subdivision being extended south to QR 1.6, adding 5/10th of a mile to the route.
Trackage 2008 - present
The section of track south of QR 1.6 at the south end of North Bergen Yard is now owned by Conrail Shared Assets Operation and is part of the North New Jersey Operational Area River Line. As such, the River Subdivision now connects directly to the River Line at MP QR 1.6 and the first "Controlled Point" on the River Subdivision is now CP-QR 3.Points of interest
Major points of interest along the River Subdivision route listed below. MP is the abbreviation for MilePost. Mileposts progress numerically from south to north. These points are of major interest to railfans and rail photographers.- MP QR 1.6 - Beginning of and southernmost point of River Subdivision
- …………….- Overpeck Creek
- MP QR 3.0 - Little Ferry Yard
- MP QR 5.0 - Ridgefield Park Station
- MP QR 7.2 - Bogota defect detector
- MP QR 10.0 - Bergenfield, NJ railcam https://www.youtube.com/watch?v=kmUomF_ynoY
- MP QR 18.8 - New Jersey / New York State Border
- MP QR 20.5 - Orangeburg defect detector
- MP QR 24.5 - Nyack
- MP QR 28.5 - Congers Station Park
- MP QR 32.9 - Haverstraw Tunnel
- MP QR 33.4 - West Haverstraw Yard
- MP QR 38.5 - Stony Point defect detector and Twin Anchors Memorial
- MP QR 41.0 - Iona Island
- MP QR 41.5 - Iona Island Trestle
- MP QR 42.3 - Bear Mountain Bridge
- MP QR 42.5 - Popolopen Creek Trestle
- MP QR 42.7 - Fort Montgomery Tunnel
- MP QR 42.9 - Mine Dock Park
- MP QR 47.3 - West Point Tunnel
- MP QR 51.0 - Storm King Mountain
- MP QR 52.0 - Cornwall Landing Park
- MP QR 53.0 - Junction with the Former NYO&W Railroad
- MP QR 56.5 - Newburgh Waterfront
- MP QR 61.0 - Roseton defect detector
- MP QR 68.0 - Milton Station
- MP QR 72.0 - Walkway Over The Hudson State Park
- MP QR 72.3 - Highland Landing Park
- MP QR 78.1 - West Park
- MP QR 84.4 - Hercules defect detector
- MP QR 86.4 - Wilbur Trestle
- MP QR 86.8 - Kingston Tunnel
- MP QR 88.8 - Kingston Yard
- MP QR 92.3 - Glenerie Falls Trestle
- MP QR 99.1 - Saugerties defect detector
- MP QR 102.1 - West Camp S-Curve
- MP QR 104.8 - Alsen Yard
- MP QR 108.1 - Catskill defect detector
- MP QR 110.2 - Catskill Trestle
- MP QR 114.9 - Athens defect detector
- MP QR 123.8 - Ravena Curve
- MP QR 128.5 - Ravena defect detector
- MP QR 132.6 - CP-SK / Selkirk: northernmost point of River Subdivision, turns west and merges into Castleton Subdivision and Selkirk Yard.
Also in Bear Mountain State Park by using the pool entrance and going under the CSX bridge offers views of both the CSX trains which you can walk right up to on the public embankment. As well as the Metro North and Amtrak Trains with the mountains behind them on the other side of the Hudson.
Bergenfield, NJ is also a popular railfanning location especially for signal fans, as some of the crossings have signals dating back to the Penn Central era, with rare bells and heavy traffic at the same time.
While not part of the River Subdivision, the Poughkeepsie Bridge "Walkway over the Hudson" crosses over the River Subdivision. This location offers a vantage point overlooking the River SD trackage, and as a backdrop when photographing the River Subdivision from the ground in and around the vicinity of MP QR 72. The views are spectacular to the north, and with a good zoom lens, a series of s-curves can be photographed.
At Selkirk, NY; the River Subdivision ends at "CP-SK" where it curves west and merges into the Castleton Subdivision, and of which this location is the extreme eastern end of Selkirk Yard.
Also at this point CP-SK, the Port Subdivision branches north towards Albany off the Castleton Subdivision. The Port Subdivision ends 7 miles north of CP-SK in South Albany, NY at the Kenwood Yard of the Canadian Pacific Railway.
Also at CP-SK, an eastbound connector from the River Subdivision is available for trains to progress east onto the Castleton Subdivision and over the Hudson River. The Castleton Sub was originally built as part of a bypass for through trains around Albany.
The configuration of the track work at CP-SK between the River Subdivision, Castleton Subdivision including the "east wye track", form a triangle: a "wye" in railroad parlance; on which locomotives can be turned if need be.
Radio frequencies
Radio transmissions between trains and dispatcher operating upon the CSX River Subdivision is assigned to the CSX 'NI' Dispatcher Desk, and can be heard on the following frequencies:- AAR Channel 58 - 160.980 - road
- AAR Channel 34 - 160.620 - dispatcher to train
Location - Milepost
- New Jersey -
- Bogota, NJ - QR 7.2
- Orangeburg, NY - QR 20.5
- Stony Point - QR 38.5
- Roseton - QR 61.0
- Hercules - QR 84.4
- Saugerties - QR 99.1
- Catskill - QR 108.1
- Athens - QR 114.9
- Ravena - QR 128.5
Freight traffic
Traffic on the River Subdivision consists mostly of long distance trains composed of intermodal, TOFC, unit, and mixed commodity trains.Traffic density varies, but on weekdays, one can expect to see 15 to 20 trains during daylight hours. Saturdays can provide 18-24 trains during the day, Sundays may only have 8-14 trains.
One can expect to see 2-5 oil trains and 1-2 ethanol trains per day.
Local trains delivering freight to businesses and industries located along the River Subdivision operate out of yards located at North Bergen, NJ; Kingston, NY and Selkirk, NY.
Train symbols operating on this line are:
- C - local
- G - unit: grain
- K - unit: oil, ethanol
- L - alternate schedule of a Q train
- Q - quality: Q000 series UPS, Q100 series intermodal, Q200 series auto carriers, Q300 east/west mixed commodity, Q400 north/south mixed commodity, and Q700 trash
- S - second section
- X - extra
A vast majority of the intermodal traffic originating in the various ports in New Jersey and destined for Chicago, IL and points west from that rail hub, travel north via the River Subdivision to Selkirk, NY; where they turn west.
Bakken oil
The one is used for the transport of Bakken oil. The line uses rail cars that are considered inadequate and a safety hazard calling for more regulations and oversight by the towns which The River Line passes through. In February 2016, competitive federal funding for rail improvements was not awarded to the line. Bridges used for traffic near Port of Albany have not been satisfactorily inspected.Future freight operations, proposals, and improvements
Plans have been proposed to add sidings and supersidings along portions of the River Subdivision, as rail traffic along this route has increased due to escalating fuel prices, deteriorating and / or congested arterial highways.The original River line as constructed by the West Shore Railroad was double track main, that is one track assigned to southbound trains and one assigned for northbound trains. With the advent of Centralized Traffic Control a/k/a "CTC", the River line was reduced to single track main with passing sidings at strategic locations.
Several recent proposals put forth plans to either install supersidings permitting trains to pass one another at speed without stopping; or reverting to complete double tracking from North Bergen to Selkirk.
As of 2008, the original signalled siding between CP-QR 76 and CP-QR 78 which was 12,500 feet in length, was extended to 24,000 feet with the extension of the original siding with another siding from CP-QR 78 to CP-QR 80 with crossovers at CP-QR 78. This extension, known as "West Park Siding" makes the entire length from CP-QR 76 to CP-QR 80 a supersiding.
As learned from , page 9 of this document shows one new siding and one supersiding are now proposed to further alleviate rail traffic congestion:
- a new siding from QR 93 to QR 96, and:
- a new supersiding, which would extend the current existing siding from CP-QR 103 to CP-QR 106, with the extension reaching to CP-QR 110.
- 2015 Update** Supersidings have now been completed between CP QR 125 in Ravena and CP QR 118 Coxsackie; CP QR 45.5 in Highland Falls and CP QR 43 in Fort Montgomery; and CP QR 38 in Stony Point and CP QR 33 in Haverstraw.
One area of engineering slightly hinders this double tracking, yet it is not insurmountable as it has been done on other railroads and routes. Upon the installation of CTC, one of the two main line tracks was removed, and the remaining main line track was realigned down the center of the some of the tunnels. When use of double stack container trains became prevalent, only the center portion of the tunnel roof or 'ceiling' directly over the track was raised to permit tall double stack intermodal / container trains to use that tunnel. The part of the ceiling where the roof meets the sidewall was not raised.
If double tracking is reinstated, the existing track down the center would need to be realigned to one side of the tunnel to permit the other track to be re-installed. This would now require either the entire width of the tunnel roof to be raised, or the full width of the roadbed lowered to permit double stack intermodal / container trains to use these tunnels.
New Jersey Transit commuter rail proposal
While the Northern Branch Corridor Project has proceeded to the EIS Stage, the West Shore Route is still proposed.The route holds great promise since it travels through the heart of New Jersey Transit Bus Operations Midtown "commutershed", with four bus routes running well beyond capacity.
The right-of-way has space for four tracks from Croxton Yard northwards to Dumont. Issues in starting commuter rail service are:
- CSX owns the trackage and uses them heavily to link the NYC area to their national network at Selkirk yard in upstate New York.
- CSX offered to allow NJ Transit use of the ROW if the agency constructed sound barriers along the entire length of track for commuter operations.
- A City Terminal is not connected to this line, since the Weehawken and Pavonia Terminals were demolished decades ago. A loop connecting this line with the North River Tunnels into New York Penn Station where the West Shore Tracks pass under the Northeast Corridor just south of NJ Route 3 and Tonnelle Ave would directly connect this line into New York Penn Station. This configuration would provide a 25-minute travel time to New York Penn Station, but would bypass Secaucus Junction, leaving the West Shore with no transfer connection to the rest of New Jersey other than a possible transfer station on Tonnelle Ave with the Hudson Bergen Light Rail.