SHEFA-2


SHEFA-2 is an undersea communication cable linking the Faroe Islands to mainland Scotland via the Northern Isles. It is named after the route on which it is being deployed and succeeds an earlier cable called SHEFA-1 on the same route.
SHEFA-2 runs from Tórshavn in the Faroe Islands to Maywick in Shetland, then from Sandwick in Shetland onwards to Ayre of Cara in Orkney, and from Manse Bay in Orkney to Banff in Aberdeenshire, on mainland Scotland. Establishing the SHEFA-2 cable took less than two years, from the planning of the project in June 2006 until March 2008, when the cable became ready for use.
SHEFA-1 was deployed from 1971 to 1994, when CANTAT-3, was established. It was a coaxial cable with 120 channels, carrying 120 telephone conversations at a time.
SHEFA-2 is a fibre-optic submarine cable and the capacity with today’s technology is 57x10 gigabits per second. The total length of the cable is around 1000 km. SHEFA-2 includes the world’s longest purely passive optical fibre cable link, entirely without amplifiers. With no submarine repeaters and no power feeds, repair and maintenance of the submarine cable is minimized. At the same time, the solution is future proof, as the end-point technology is the only item in need of change to increase the capacity.
In the spring of 2013, the cable was cut at the south of Orkney. This led to major broadband disruptions throughout Shetland. Internet traffic was redirected onto the older and slower microwave links and the FARICE-1 cable.
In the summer of 2013, the cable was cut for the second time where it crosses the Moray Firth on the north-east coast of Scotland, causing more disruption to Internet connections. It is believed that fishing vessels are to blame for both cable breaks.