Sable Offshore Energy Project


The Sable Offshore Energy Project is a consortium based in Halifax, Nova Scotia which explores for and produced natural gas near Sable Island on the edge of the Nova Scotian continental shelf in eastern Canada. SOEP produced between 400 and of natural gas and of natural gas liquids daily until 2019.
The first tier was completed in 1999 resulting in the development of the Thebaud, North Triumph, and Venture natural gas fields.

History

In 1979 the drill rig Gulftide struck success and the Venture field was discovered. At the time, the cost of developing the gas field proved prohibitive. Extreme North Atlantic Ocean weather and low natural gas prices were blamed. In 1995, improvements in drilling technology along with an increase in natural gas prices made recovering the gas economic allowing SOEP to emerge. In January ground was broken for the Goldboro gas plant. In November, the Galaxy II rig spuds the first production well at the Thebaud field. The Thebaud platform and wellhead were installed in August 1999. In September, the sub-sea pipeline, linking the Sable Island fields to Goldboro gas plant 225 km away, was completed. In November, construction of the fractionation plant and gas plant were completed and first natural gas was recovered a month later offshore. First gas shipped to market in January 2000.

Geology

The Venture Gas Field was discovered in 1979 when the Venture D-23 well was drilled and is located a few miles off the east end of Sable Island on the Scotian Shelf in 12-20 m of water. The structural trap consists of an east-west trending anticline bounded on the north by a fault, with gas occurring in multiple Upper Jurassic to Lower Cretaceous sandstone reservoirs 1600 m thick at depths from 4 to 6 km.

Fields

The fields of SOEP are being developed in two stage, with the cost of development of an estimated field life of 25 years. The Thebaud, North Triumph, and Venture were developed in the first stage and completed in 1999.
The first Phase II platform, Alma, came onstream in late 2003 while production from South Venture, the second field began late in 2004.

Facilities

Offshore
Onshore
*