Drew R. Oliver, president of the Oliver Electric Power Corporation, was the earliest to promote the idea of generating electricity from wind in the San Gorgonio Pass area. In 1926 Oliver, in collaboration with electrician W. Sperry Knighton, built a wind turbine near Whitewater. The original device used a generator Oliver had salvaged from an old roller coaster at Seal Beach, California. Oliver and Sperry fitted the generator with aluminum propellers, and placed a large funnel on the front to concentrate the wind's power. They set the entire device on a circular rail that allowed it to be pivoted to face prevailing winds. The powerful wind quickly burned out the 25,000 watt unit, but a larger unit was obtained from the Pacific Electric substation in Los Angeles. After the two worked out other mechanical issues, Oliver set out to raise funds to expand the enterprise, with the vision of powering all of nearby Palm Springs. Oliver incorporated the Oliver Electric Power Corporation in Reno, Nevada, began selling stock in the company, but quickly ran afoul of newly enacted California Corporate Security Laws. Oliver was jailed for a short time, then placed on two years probation, but his plans proceeded no further. The device he had built near Whitewater became a landmark and curiosity until it was taken down and sold for scrap in 1942. In 1982 wind energy development in the San Gorgonio Pass area was formally studied, and the results published in the San Gorgonio Wind Resource Study EIR , a joint environmental document prepared for the U.S. Bureau of Land Management and Riverside County. The document assessed three scenarios for wind energy development in the area and included criteria for the development of wind energy on both a countywide basis and specifically for the San Gorgonio Pass area. Since 1982, and the approval of wind energy development in the San Gorgonio Pass, numerous wind turbines have become part of the landscape. The narrow turbines range from to in height. A 2008 proposal details an upgrade to the facilities to begin construction by September 2011. The proposed project would replace the 460 existing wind turbines with 30 new turbines, in two phases. Phase 1 would remove approximately 74 non-operational turbines and install up to fifteen new 1.5 MW GE SLE wind turbines. Phase 2 would remove approximately 384, Vestas V15, 65kW turbines and install an additional fifteen, 1.5 MW GE SLE wind turbines. The proposed project would therefore comprise a total of 30 wind turbines, 330 feet tall.
Further information
In 1998 Huell Howser Productions, in association with KCET/Los Angeles, featured the windfarms in California's Gold; the 30 minute program is available on VHS. A second Howser/California's Gold program on the wind farms was produced in 2010.